Mozambique
EVS Mozambique EV Service Centre Market Entry
Decision-grade Mozambique assessment separating active passenger plug-in data gaps, all-powertrain parc, future policy targets, buses, two/three-wheel projects, charging evidence and EVS assumptions.
No authoritative active passenger BEV/PHEV stock series.
No verified public passenger connector census.
Only after 500 separated active Greater Maputo–Matola plug-ins.
Partner-clinic assumption on MZN1.2m reversible capex.
The verdict in full
Evidence, assumptions and operational implications are separated below.
Market headline
Evidence, assumptions and operational implications are separated below.
Market headline
| Metric | Value | Unit | Status |
|---|---|---|---|
| 2024 all-powertrain vehicle parc | 1,320,000 | vehicles | INE-attributed secondary relay; no propulsion split [ine_parc]. |
| 2024 light-vehicle parc | 897,273 | vehicles | INE-attributed; not private-only and no powertrain split [ine_parc]. |
| Current active passenger BEV/PHEV stock | — | vehicles | No authoritative separated active-stock series located. |
| Verified public passenger-EV connectors | — | connectors | No authoritative national/site-level census located. |
| Gate SAM | 324 | jobs/year | Activates only after 500 active Greater Maputo–Matola plug-ins. |
| Executable SOM | 0 | jobs | Zero until every hard gate passes. |
- Value
- 1,320,000
- Unit
- vehicles
- Status
- INE-attributed secondary relay; no propulsion split [ine_parc].
- Value
- 897,273
- Unit
- vehicles
- Status
- INE-attributed; not private-only and no powertrain split [ine_parc].
- Value
- —
- Unit
- vehicles
- Status
- No authoritative separated active-stock series located.
- Value
- —
- Unit
- connectors
- Status
- No authoritative national/site-level census located.
- Value
- 324
- Unit
- jobs/year
- Status
- Activates only after 500 active Greater Maputo–Matola plug-ins.
- Value
- 0
- Unit
- jobs
- Status
- Zero until every hard gate passes.
Macroeconomic context
Evidence, assumptions and operational implications are separated below.
Macroeconomic context
| Indicator | Value | Unit | Period | Source |
|---|---|---|---|---|
| Real GDP growth | 2.1 | percent | 2024 | IMF [imf_2026] |
- Value
- 2.1
- Unit
- percent
- Period
- 2024
- Source
- IMF [imf_2026]
Market size and vehicle parc context
The 1.32m parc is all powertrains. No current active passenger/light-commercial plug-in denominator was located.
Market size and vehicle parc context
| Metric | Value | Period | Treatment |
|---|---|---|---|
| Total vehicle parc | 1,320,000 | 2024 | All powertrains; rounded public relay [ine_parc]. |
| Light vehicles | 897,273 | 2024 | All powertrains; not passenger EV stock [ine_parc]. |
| Heavy vehicles | 267,792 | 2024 | All powertrains [ine_parc]. |
| Motorcycles | 100,695 | 2024 | All powertrains; separate workstream [ine_parc]. |
| Maputo City vehicles | 564,525 | 2024 | All powertrains [ine_parc]. |
| Maputo Province vehicles | 496,707 | 2024 | All powertrains; territorial overlap/definition to verify [ine_parc]. |
| Active passenger BEV/PHEV stock | — | Current | TAM denominator unavailable. |
- Value
- 1,320,000
- Period
- 2024
- Treatment
- All powertrains; rounded public relay [ine_parc].
- Value
- 897,273
- Period
- 2024
- Treatment
- All powertrains; not passenger EV stock [ine_parc].
- Value
- 267,792
- Period
- 2024
- Treatment
- All powertrains [ine_parc].
- Value
- 100,695
- Period
- 2024
- Treatment
- All powertrains; separate workstream [ine_parc].
- Value
- 564,525
- Period
- 2024
- Treatment
- All powertrains [ine_parc].
- Value
- 496,707
- Period
- 2024
- Treatment
- All powertrains; territorial overlap/definition to verify [ine_parc].
- Value
- —
- Period
- Current
- Treatment
- TAM denominator unavailable.
BEV/PHEV sales, stock and adoption history
No authoritative annual BEV/PHEV sales or active-stock history was located; nulls are deliberate.
2024 all-powertrain parc composition
Vehicles; not EV stock.
Source: INE: Vehicle Fleet Grew 4.2% in 2024, Surpassing 1.3 Million Vehicles
BEV/PHEV sales, stock and adoption history
| Period | Passenger Bev Sales | Passenger Phev Sales | Active Passenger Bev Phev | Other Evidence |
|---|---|---|---|---|
| 2022 | — | — | — | 1.2m all-powertrain parc reported; no propulsion split. |
| 2023 | — | — | — | 1.27m all-powertrain vehicles reported; no EV split [lusa_imports]. |
| 2024 | — | — | — | 1.32m all-powertrain parc and 897,273 light vehicles [ine_parc]. |
| 2025 | — | — | — | One electric bus unveiled; duty exemption approved late year; no registry series [metrobus] [duty_zero]. |
| 2026 | — | — | — | No authoritative active-stock or sales release located as of access date. |
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- 1.2m all-powertrain parc reported; no propulsion split.
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- 1.27m all-powertrain vehicles reported; no EV split [lusa_imports].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- 1.32m all-powertrain parc and 897,273 light vehicles [ine_parc].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- One electric bus unveiled; duty exemption approved late year; no registry series [metrobus] [duty_zero].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- No authoritative active-stock or sales release located as of access date.
Definition reconciliation
Evidence, assumptions and operational implications are separated below.
Definition reconciliation
| Term | Treatment | Reason |
|---|---|---|
| 1.32 million vehicles | All-powertrain administrative parc | No powertrain or active-status definition published in accessible relay [ine_parc]. |
| 1% private road transport in 2030 | Official strategy target share | Target, not realised stock or forecast [ete]. |
| One electric bus unveiled | Observed launch signal only | Not passenger-car TAM or confirmed in-service fleet [metrobus]. |
| 10 additional buses / earlier 300-bus plan | Announced pipeline | No delivery/registration evidence; excluded [metrobus] [bus_plan_2024]. |
| 59 motorbikes + 20 scooters + 30 three-wheelers | Project targets | Funder page describes pilot target, not active fleet [eep]. |
| Five swap stations | Project target | Not public passenger-car charging [eep]. |
| 20% duty reduced to zero | Policy incentive for solely electric vehicles | Customs benefit, not adoption count; written classification required [duty_zero]. |
- Treatment
- All-powertrain administrative parc
- Reason
- No powertrain or active-status definition published in accessible relay [ine_parc].
- Treatment
- Official strategy target share
- Reason
- Target, not realised stock or forecast [ete].
- Treatment
- Observed launch signal only
- Reason
- Not passenger-car TAM or confirmed in-service fleet [metrobus].
- Treatment
- Announced pipeline
- Reason
- No delivery/registration evidence; excluded [metrobus] [bus_plan_2024].
- Treatment
- Project targets
- Reason
- Funder page describes pilot target, not active fleet [eep].
- Treatment
- Project target
- Reason
- Not public passenger-car charging [eep].
- Treatment
- Policy incentive for solely electric vehicles
- Reason
- Customs benefit, not adoption count; written classification required [duty_zero].
Cautious / base / high forecasts
These are EVS share sensitivities on the 2024 light parc. The high case mirrors the ETE 2030 private-transport target, but is not an official vehicle forecast.
Cautious / base / high forecasts
| Scenario | Share Pct | Modelled 2030 Plug In Count | Basis |
|---|---|---|---|
| Cautious | 0.25 | 2,243 | EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy. |
| Base | 0.5 | 4,486 | EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy. |
| High / policy-aligned sensitivity | 1 | 8,973 | EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy. |
- Share Pct
- 0.25
- Modelled 2030 Plug In Count
- 2,243
- Basis
- EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy.
- Share Pct
- 0.5
- Modelled 2030 Plug In Count
- 4,486
- Basis
- EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy.
- Share Pct
- 1
- Modelled 2030 Plug In Count
- 8,973
- Basis
- EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy.
Charging infrastructure
Bus charging and two-wheel swapping are not a public passenger-car connector network. A passenger EVSE census remains null.
Charging infrastructure
| Segment | Count | Status |
|---|---|---|
| Public passenger-car charging | — | No authoritative connector, power, access, tariff and uptime census located. |
| MetroBus charging infrastructure | — | Operator-linked announcement identifies charger ratings but no commissioned count/site register; published kW/h units are technically invalid [metrobus]. |
| Epsilon battery swapping | 5 | Pilot target for motorbikes/scooters/three-wheelers; not passenger-car EVSE [eep]. |
| Workshop connection | — | Obtain EDM/ARENE site-specific load, earthing, protection, metering, tariff and outage evidence [edm] [arene]. |
- Count
- —
- Status
- No authoritative connector, power, access, tariff and uptime census located.
- Count
- —
- Status
- Operator-linked announcement identifies charger ratings but no commissioned count/site register; published kW/h units are technically invalid [metrobus].
- Count
- 5
- Status
- Pilot target for motorbikes/scooters/three-wheelers; not passenger-car EVSE [eep].
- Count
- —
- Status
- Obtain EDM/ARENE site-specific load, earthing, protection, metering, tariff and outage evidence [edm] [arene].
Electric two- and three-wheel ecosystem
Evidence, assumptions and operational implications are separated below.
2030 plug-in share sensitivities
EVS model on 2024 light parc; high case mirrors the ETE 1% target.
Electric two- and three-wheel ecosystem
| Project | Assets | Unit | Status |
|---|---|---|---|
| Epsilon Mobilidade | 59 | electric motorbikes target | Pilot target to October 2026 [eep]. |
| Epsilon Mobilidade | 20 | electric scooters target | Pilot target [eep]. |
| Epsilon Mobilidade | 30 | electric three-wheelers target | Pilot target [eep]. |
| Epsilon Mobilidade | 5 | swap stations target | Two/three-wheel infrastructure [eep]. |
| Mobility for Africa / SCF | — | rural three-wheel EVs | Project evidence; quantity not publicly confirmed [scf]. |
- Assets
- 59
- Unit
- electric motorbikes target
- Status
- Pilot target to October 2026 [eep].
- Assets
- 20
- Unit
- electric scooters target
- Status
- Pilot target [eep].
- Assets
- 30
- Unit
- electric three-wheelers target
- Status
- Pilot target [eep].
- Assets
- 5
- Unit
- swap stations target
- Status
- Two/three-wheel infrastructure [eep].
- Assets
- —
- Unit
- rural three-wheel EVs
- Status
- Project evidence; quantity not publicly confirmed [scf].
Electric buses
Evidence, assumptions and operational implications are separated below.
Electric buses
| Metric | Value | Unit | Period | Status |
|---|---|---|---|---|
| Electric bus physically unveiled | 1 | bus | FACIM 2025 | Secondary operator relay; service/registration status unverified [metrobus]. |
| Additional buses announced | 10 | buses | — | Plan only [metrobus]. |
| Earlier IFC/MetroBus plan | 300 | buses | — | Historical plan; not delivered stock [bus_plan_2024]. |
| 2025 public procurement electric buses | 0 | identified buses | — | Reported 390-bus mix was CNG/diesel/other, not electric [bus_procurement]. |
- Value
- 1
- Unit
- bus
- Period
- FACIM 2025
- Status
- Secondary operator relay; service/registration status unverified [metrobus].
- Value
- 10
- Unit
- buses
- Period
- —
- Status
- Plan only [metrobus].
- Value
- 300
- Unit
- buses
- Period
- —
- Status
- Historical plan; not delivered stock [bus_plan_2024].
- Value
- 0
- Unit
- identified buses
- Period
- —
- Status
- Reported 390-bus mix was CNG/diesel/other, not electric [bus_procurement].
Vehicle parc age and service demand
Evidence, assumptions and operational implications are separated below.
Vehicle parc age and service demand
| Indicator | Value | Unit | Implication |
|---|---|---|---|
| All-powertrain light parc | 897,273 | vehicles | Large mechanical-service base but not EV demand [ine_parc]. |
| Light-parc growth 2021–2024 | 12 | percent | Vehicle-service demand grows; EV share remains unknown [ine_parc]. |
| Average vehicle age | — | years | No current official age distribution located. |
| Used-vehicle PSI | 1 | mandatory process | Import/service files should capture inspection and conformity evidence [intertek_psi]. |
| Passenger plug-ins by city/age/warranty | — | vehicles | Blocks current TAM and site density. |
- Value
- 897,273
- Unit
- vehicles
- Implication
- Large mechanical-service base but not EV demand [ine_parc].
- Value
- 12
- Unit
- percent
- Implication
- Vehicle-service demand grows; EV share remains unknown [ine_parc].
- Value
- —
- Unit
- years
- Implication
- No current official age distribution located.
- Value
- 1
- Unit
- mandatory process
- Implication
- Import/service files should capture inspection and conformity evidence [intertek_psi].
- Value
- —
- Unit
- vehicles
- Implication
- Blocks current TAM and site density.
EVS assumptions
Evidence, assumptions and operational implications are separated below.
EVS assumptions
| Assumption | Value | Unit | Basis |
|---|---|---|---|
| Greater Maputo–Matola launch threshold | 500 | active passenger/light-commercial BEV/PHEV | EVS density gate, not estimate. |
| Active/available factor | 0.9 | share | EVS planning haircut after registry proof. |
| Independent reach | 0.6 | share | After warranty, captive, unsupported-VIN and consent screening. |
| Service events | 1.2 | jobs/vehicle/year | EVS diagnostic/chassis blend. |
| Average repair order | 12,500 | MZN/job | Replace with paid observations. |
| Reversible capex ceiling | 1,200,000 | MZN | EVS board gate. |
| Executable SOM before gates | 0 | jobs | Deliberately zero. |
- Value
- 500
- Unit
- active passenger/light-commercial BEV/PHEV
- Basis
- EVS density gate, not estimate.
- Value
- 0.9
- Unit
- share
- Basis
- EVS planning haircut after registry proof.
- Value
- 0.6
- Unit
- share
- Basis
- After warranty, captive, unsupported-VIN and consent screening.
- Value
- 1.2
- Unit
- jobs/vehicle/year
- Basis
- EVS diagnostic/chassis blend.
- Value
- 12,500
- Unit
- MZN/job
- Basis
- Replace with paid observations.
- Value
- 1,200,000
- Unit
- MZN
- Basis
- EVS board gate.
- Value
- 0
- Unit
- jobs
- Basis
- Deliberately zero.
Transparent TAM / SAM / SOM
Current national TAM remains null and executable SOM zero. The quantified opportunity is a board gate, not a market estimate.
Transparent TAM / SAM / SOM
| Layer | Vehicles | Jobs Per Year | Revenue Mzn | Status |
|---|---|---|---|---|
| National active passenger/light-commercial plug-in TAM | — | — | — | Not quantified: authoritative active denominator unavailable. |
| 2030 high policy-aligned sensitivity | 8,973 | — | — | 1% × 2024 light parc; illustrative, not current TAM or official forecast [ete] [ine_parc]. |
| Greater Maputo–Matola gate SAM | 270 | 324 | 4,050,000 | 500 × 90% active × 60% reach × 1.20 events. |
- Vehicles
- —
- Jobs Per Year
- —
- Revenue Mzn
- —
- Status
- Not quantified: authoritative active denominator unavailable.
- Vehicles
- 8,973
- Jobs Per Year
- —
- Revenue Mzn
- —
- Status
- 1% × 2024 light parc; illustrative, not current TAM or official forecast [ete] [ine_parc].
- Vehicles
- 270
- Jobs Per Year
- 324
- Revenue Mzn
- 4,050,000
- Status
- 500 × 90% active × 60% reach × 1.20 events.
Customer and fleet segments
Evidence, assumptions and operational implications are separated below.
Customer and fleet segments
| Segment | Need | Priority |
|---|---|---|
| Private early adopters / lawful imports | Pre-purchase, scan, charging, 12V and chassis evidence | High only for supported VINs. |
| Corporate, NGO, embassy, rental and hospitality fleets | Route/charging readiness and condition reporting | Highest through paid fleet trial. |
| Ride-hailing and delivery fleets | Uptime, tyres, brakes, charging and 12V | Passenger cars/vans only; motorcycles separate. |
| Public and municipal fleets | Procurement-compliant reporting and SLA | Contract only. |
| Electric motorcycles/three-wheelers | Swap-battery tools and operator partnership | Separate workstream [eep] [scf]. |
| Electric buses/trucks | Depot tools, lifts and OEM contract | Excluded absent verified fleet contract. |
- Need
- Pre-purchase, scan, charging, 12V and chassis evidence
- Priority
- High only for supported VINs.
- Need
- Route/charging readiness and condition reporting
- Priority
- Highest through paid fleet trial.
- Need
- Uptime, tyres, brakes, charging and 12V
- Priority
- Passenger cars/vans only; motorcycles separate.
- Need
- Procurement-compliant reporting and SLA
- Priority
- Contract only.
- Need
- Swap-battery tools and operator partnership
- Priority
- Separate workstream [eep] [scf].
- Need
- Depot tools, lifts and OEM contract
- Priority
- Excluded absent verified fleet contract.
Leading EV brands and models
Evidence, assumptions and operational implications are separated below.
Leading EV brands and models
| Brand | Model | Powertrain | Signal |
|---|---|---|---|
| BYD / Tesla / Geely / other parallel imports | VIN-level discovery required | BEV/PHEV mixed | No official brand/model registration ranking located; commercial availability does not prove stock. |
| Toyota / CFAO | Conventional and hybrid ecosystem | Mixed | Strong local aftersales footprint; no passenger plug-in volume or HV-capability claim [toyota]. |
| Ford / Interauto | Conventional commercial/passenger ecosystem | Mixed | National repair network; no local EV volume proof [ford]. |
| Chery / Autogest | Passenger/SUV ecosystem | Mixed | Maputo dealer presence; no audited EV sales [chery]. |
| CRRC | 18m articulated bus | BEV bus | One vehicle unveiled; service status unverified [metrobus]. |
- Model
- VIN-level discovery required
- Powertrain
- BEV/PHEV mixed
- Signal
- No official brand/model registration ranking located; commercial availability does not prove stock.
- Model
- Conventional and hybrid ecosystem
- Powertrain
- Mixed
- Signal
- Strong local aftersales footprint; no passenger plug-in volume or HV-capability claim [toyota].
- Model
- Conventional commercial/passenger ecosystem
- Powertrain
- Mixed
- Signal
- National repair network; no local EV volume proof [ford].
- Model
- Passenger/SUV ecosystem
- Powertrain
- Mixed
- Signal
- Maputo dealer presence; no audited EV sales [chery].
- Model
- 18m articulated bus
- Powertrain
- BEV bus
- Signal
- One vehicle unveiled; service status unverified [metrobus].
Independent and OEM competitors
Evidence, assumptions and operational implications are separated below.
Independent and OEM competitors
| Competitor | Type | Footprint | Threat | Response |
|---|---|---|---|---|
| CFAO Mobility / Toyota Mozambique | OEM-backed sales and aftersales | Maputo/Matola plus national authorised network | High for warranty, parts and general repair | Supported-VIN out-of-warranty/referral positioning [toyota]. |
| Interauto / Ford network | OEM-backed dealer and regional repairers | Maputo, Beira, Nampula, Tete, Chimoio and others | High for conventional fleet relationships | Partner/referral before direct competition [ford]. |
- Type
- OEM-backed sales and aftersales
- Footprint
- Maputo/Matola plus national authorised network
- Threat
- High for warranty, parts and general repair
- Response
- Supported-VIN out-of-warranty/referral positioning [toyota].
- Type
- OEM-backed dealer and regional repairers
- Footprint
- Maputo, Beira, Nampula, Tete, Chimoio and others
- Threat
- High for conventional fleet relationships
- Response
- Partner/referral before direct competition [ford].
Priority cities and regions
Evidence, assumptions and operational implications are separated below.
Priority cities and regions
| Rank | Region | Rationale | Mode |
|---|---|---|---|
| 1 | Greater Maputo–Matola | Dominant all-powertrain parc, import/corporate density, only evidenced e-bus/charging activity and official registration routes [ine_parc] [metrobus]. | Only fixed partner-clinic candidate. |
- Region
- Greater Maputo–Matola
- Rationale
- Dominant all-powertrain parc, import/corporate density, only evidenced e-bus/charging activity and official registration routes [ine_parc] [metrobus].
- Mode
- Only fixed partner-clinic candidate.
Consumer incentives and policy
Evidence, assumptions and operational implications are separated below.
Consumer incentives and policy
| Instrument | Status | Action |
|---|---|---|
| Customs duty for solely electric vehicles | Secondary sources report final reduction from 20% to zero in December 2025 | Obtain current gazetted tariff line, definition, effective date, VIN eligibility and customs ruling [duty_zero] [duty_zero_corrob]. |
| Specific Consumption Tax proposal | Draft/proposal reported for EVs and hybrids | Do not model until final law and schedule confirmed [excise_proposal]. |
- Status
- Secondary sources report final reduction from 20% to zero in December 2025
- Action
- Obtain current gazetted tariff line, definition, effective date, VIN eligibility and customs ruling [duty_zero] [duty_zero_corrob].
- Status
- Draft/proposal reported for EVs and hybrids
- Action
- Do not model until final law and schedule confirmed [excise_proposal].
Business, tax and investment incentives
Reported EV duty relief and investment incentives require written current classification/approval; economics assumes no benefit.
Business, tax and investment incentives
| Item | Rate | Treatment |
|---|---|---|
| Standard VAT | 16% | Current professional/official reform sources; confirm registration and recoverability [pae_vat] [pwc_vat]. |
| Standard corporate income tax | 32% | Pre-tax model; confirm entity/activity treatment [pwc_cit]. |
- Rate
- 16%
- Treatment
- Current professional/official reform sources; confirm registration and recoverability [pae_vat] [pwc_vat].
- Rate
- 32%
- Treatment
- Pre-tax model; confirm entity/activity treatment [pwc_cit].
Labour, licensing and workshop regulation
Every material authorisation is a launch gate; this is not legal, tax, engineering or insurance advice.
Labour, licensing and workshop regulation
| Gate | Authority | Evidence |
|---|---|---|
| Entity, tax and social security | Commercial registry / AT / INSS | Entity, NUIT, tax registration, employer/worker files [labour] [apiex]. |
| Workshop activity and premises use | Municipality / economic-activity authority / INATRO boundary | Written business, zoning/occupancy, signage and automotive-workshop route before fit-out [inatro_law]. |
- Authority
- Commercial registry / AT / INSS
- Evidence
- Entity, NUIT, tax registration, employer/worker files [labour] [apiex].
- Authority
- Municipality / economic-activity authority / INATRO boundary
- Evidence
- Written business, zoning/occupancy, signage and automotive-workshop route before fit-out [inatro_law].
High-voltage controls
Evidence, assumptions and operational implications are separated below.
High-voltage controls
| Control | Evidence |
|---|---|
| VIN/powertrain whitelist | Classify BEV, PHEV, HEV, MHEV, motorcycles, buses and conversions before booking. |
| Named task authorisation | Competence assessment, task scope, expiry, supervision and local written acceptance [labour] [ilo_osh]. |
| Safe de-energisation | OEM method, lock/tag, proved tester and absence-of-voltage record [iso_6469]. |
| Controlled zone | Barriers, insulated PPE/tools, rescue equipment, dry conditions and no lone HV work [ilo_osh]. |
| Charging interface | Approved electrician; IEC 61851/ISO 17409 as benchmarks only [iec_61851] [iso_17409]. |
| Release evidence | Pre/post scan, restoration, torque/QC, limitations and customer sign-off. |
- Evidence
- Classify BEV, PHEV, HEV, MHEV, motorcycles, buses and conversions before booking.
- Evidence
- Competence assessment, task scope, expiry, supervision and local written acceptance [labour] [ilo_osh].
- Evidence
- OEM method, lock/tag, proved tester and absence-of-voltage record [iso_6469].
- Evidence
- Barriers, insulated PPE/tools, rescue equipment, dry conditions and no lone HV work [ilo_osh].
- Evidence
- Approved electrician; IEC 61851/ISO 17409 as benchmarks only [iec_61851] [iso_17409].
- Evidence
- Pre/post scan, restoration, torque/QC, limitations and customer sign-off.
Battery and waste controls
Evidence, assumptions and operational implications are separated below.
Battery and waste controls
| Stage | Rule | Route |
|---|---|---|
| Intact in-vehicle traction pack | Non-invasive diagnostics only | No opening, removal or routine storage. |
| Suspect/damaged EV arrival | Refuse routine indoor custody | Emergency/OEM/insurer/MAAP plan. |
- Rule
- Non-invasive diagnostics only
- Route
- No opening, removal or routine storage.
- Rule
- Refuse routine indoor custody
- Route
- Emergency/OEM/insurer/MAAP plan.
Recommended service portfolio
Evidence, assumptions and operational implications are separated below.
Recommended service portfolio
| Phase | Service | Include | Exclude |
|---|---|---|---|
| Launch | VIN-classified diagnostic scan | DTC/live data/12V/charge evidence | Secure coding, unsupported models or warranty decisions. |
| Launch | Pre-purchase EV condition report | Visual, scan, charging, thermal observation and chassis | Guaranteed battery capacity/life. |
| Launch | Charging and low-voltage triage | Cable, inlet, EVSE interface and 12V | Premises electrical work without approved partner. |
| Launch | Tyres, brakes, suspension and alignment | EV load/torque evidence | Unsupported ADAS calibration. |
| Fleet | Corporate/rental/NGO uptime inspection | Paid fleet trial and SLA evidence | OEM HV warranty. |
| Fleet | Maputo–Matola collection and documented triage | Scheduled clinic days | Roadside HV intrusion. |
| Hold | Traction-pack/module work | None | Opening, removal, transport or custody. |
- Service
- VIN-classified diagnostic scan
- Include
- DTC/live data/12V/charge evidence
- Exclude
- Secure coding, unsupported models or warranty decisions.
- Service
- Pre-purchase EV condition report
- Include
- Visual, scan, charging, thermal observation and chassis
- Exclude
- Guaranteed battery capacity/life.
- Service
- Charging and low-voltage triage
- Include
- Cable, inlet, EVSE interface and 12V
- Exclude
- Premises electrical work without approved partner.
- Service
- Tyres, brakes, suspension and alignment
- Include
- EV load/torque evidence
- Exclude
- Unsupported ADAS calibration.
- Service
- Corporate/rental/NGO uptime inspection
- Include
- Paid fleet trial and SLA evidence
- Exclude
- OEM HV warranty.
- Service
- Maputo–Matola collection and documented triage
- Include
- Scheduled clinic days
- Exclude
- Roadside HV intrusion.
- Service
- Traction-pack/module work
- Include
- None
- Exclude
- Opening, removal, transport or custody.
Operating model
Evidence, assumptions and operational implications are separated below.
Operating model
| Element | Recommendation |
|---|---|
| Format | Scheduled clinic days inside one compliant Greater Maputo–Matola partner workshop. |
| Ownership | Mozambican legal entity or managed JV with accountable local operator. |
| Territory | No franchise sale or exclusivity before 12 months paid evidence. |
| Staffing | One assessed HV lead plus one technician; shared reception and approved electrician/waste partners. |
| Technology | Supported VIN/task matrix, lawful service information and evidence-grade job files. |
| Commercial | MZN menu pricing, deposits and paid fleet trials; no free-diagnostic demand proxy. |
| Expansion | Beira collection/fleet day only after Maputo continuation gate. |
- Recommendation
- Scheduled clinic days inside one compliant Greater Maputo–Matola partner workshop.
- Recommendation
- Mozambican legal entity or managed JV with accountable local operator.
- Recommendation
- No franchise sale or exclusivity before 12 months paid evidence.
- Recommendation
- One assessed HV lead plus one technician; shared reception and approved electrician/waste partners.
- Recommendation
- Supported VIN/task matrix, lawful service information and evidence-grade job files.
- Recommendation
- MZN menu pricing, deposits and paid fleet trials; no free-diagnostic demand proxy.
- Recommendation
- Beira collection/fleet day only after Maputo continuation gate.
Franchise pathway
Evidence, assumptions and operational implications are separated below.
Franchise pathway
| Stage | Structure | Capital | Royalty | Gate |
|---|---|---|---|---|
| 0–90 days | EVS-managed partner clinic | Reversible tools only | None | All compliance, demand and safety gates. |
| 3–12 months | Managed local affiliate/JV | Evidence-led | After economics | 12 months paid data and audit. |
| After 12 months | Possible franchise prototype | Capped per validated density | Only with parts/software/training SLA | No territory sale before replicated profitability. |
- Structure
- EVS-managed partner clinic
- Capital
- Reversible tools only
- Royalty
- None
- Gate
- All compliance, demand and safety gates.
- Structure
- Managed local affiliate/JV
- Capital
- Evidence-led
- Royalty
- After economics
- Gate
- 12 months paid data and audit.
- Structure
- Possible franchise prototype
- Capital
- Capped per validated density
- Royalty
- Only with parts/software/training SLA
- Gate
- No territory sale before replicated profitability.
Pilot steady-state economics
All volumes, prices, margins, costs and capex are EVS assumptions in nominal MZN, VAT-exclusive and pre-tax.
Pilot steady-state economics
| Scenario | Jobs | Aro Mzn | Gross Margin Pct | Opex Mzn | Revenue Mzn | Gross Profit Mzn | Ebitda Mzn | Payback Years |
|---|---|---|---|---|---|---|---|---|
| Cautious | 45 | 10,000 | 55 | 360,000 | 450,000 | 247,500 | -112,500 | — |
- Jobs
- 45
- Aro Mzn
- 10,000
- Gross Margin Pct
- 55
- Opex Mzn
- 360,000
- Revenue Mzn
- 450,000
- Gross Profit Mzn
- 247,500
- Ebitda Mzn
- -112,500
- Payback Years
- —
90-day pilot economics
Evidence, assumptions and operational implications are separated below.
90-day pilot economics
| Scenario | Jobs 90d | Aro Mzn | Gross Margin Pct | Opex Mzn | Revenue Mzn | Gross Profit Mzn | Ebitda Mzn |
|---|---|---|---|---|---|---|---|
| Cautious | 11 | 10,000 | 55 | 90,000 | 110,000 | 60,500 | -29,500 |
- Jobs 90d
- 11
- Aro Mzn
- 10,000
- Gross Margin Pct
- 55
- Opex Mzn
- 90,000
- Revenue Mzn
- 110,000
- Gross Profit Mzn
- 60,500
- Ebitda Mzn
- -29,500
Risks and mitigations
Evidence, assumptions and operational implications are separated below.
Risks and mitigations
| Risk | Likelihood | Impact | Mitigation |
|---|---|---|---|
| Passenger active-stock denominator unavailable | High | High | Matched INATRO/Customs/dealer extract; TAM stays null. |
| Policy target mistaken for current stock | High | High | Keep 1%/5%/10%/25%/50% as future ETE targets [ete]. |
| One bus/announced fleets mixed into passenger TAM | High | High | Separate captive bus deployment and service-status audit. |
| Motorcycle swap assets mixed into passenger charging | High | High | Separate workstream and economics [eep]. |
| No public connector census | High | Medium | Field audit by site, connector, kW, access, tariff and uptime. |
| Grid capacity/outages at partner bay | High | High | EDM load study, outage log, earthing/protection and controlled charging. |
| OEM software/warranty/parts access | High | High | Supported VIN/task matrix, referrals and parts SLA. |
| Battery fire/electric shock | Low | Critical | No pack work; isolation SOP, rescue gear and drills. |
| No approved traction-battery recipient | High | Critical | No custody before written classification and acceptance [haz_waste]. |
| Tax/customs classification changes | Medium | High | Written current ruling; zero incentive in economics. |
| Paid demand below threshold | High | High | Deposits, paid fleet trial and day-90 stop. |
| FX shortages and imported-parts delays | High | High | Low inventory, deposits and no fixed SLA without stock [imf_june]. |
| Northern security/logistics disruption | High | High | Maputo-only pilot; no Pemba capex [worldbank_overview]. |
| Climate/flood disruption | High | High | Premises flood screening, continuity and charging shutdown plan [imf_june]. |
- Likelihood
- High
- Impact
- High
- Mitigation
- Matched INATRO/Customs/dealer extract; TAM stays null.
- Likelihood
- High
- Impact
- High
- Mitigation
- Keep 1%/5%/10%/25%/50% as future ETE targets [ete].
- Likelihood
- High
- Impact
- High
- Mitigation
- Separate captive bus deployment and service-status audit.
- Likelihood
- High
- Impact
- High
- Mitigation
- Separate workstream and economics [eep].
- Likelihood
- High
- Impact
- Medium
- Mitigation
- Field audit by site, connector, kW, access, tariff and uptime.
- Likelihood
- High
- Impact
- High
- Mitigation
- EDM load study, outage log, earthing/protection and controlled charging.
- Likelihood
- High
- Impact
- High
- Mitigation
- Supported VIN/task matrix, referrals and parts SLA.
- Likelihood
- Low
- Impact
- Critical
- Mitigation
- No pack work; isolation SOP, rescue gear and drills.
- Likelihood
- High
- Impact
- Critical
- Mitigation
- No custody before written classification and acceptance [haz_waste].
- Likelihood
- Medium
- Impact
- High
- Mitigation
- Written current ruling; zero incentive in economics.
- Likelihood
- High
- Impact
- High
- Mitigation
- Deposits, paid fleet trial and day-90 stop.
- Likelihood
- High
- Impact
- High
- Mitigation
- Low inventory, deposits and no fixed SLA without stock [imf_june].
- Likelihood
- High
- Impact
- High
- Mitigation
- Maputo-only pilot; no Pemba capex [worldbank_overview].
- Likelihood
- High
- Impact
- High
- Mitigation
- Premises flood screening, continuity and charging shutdown plan [imf_june].
90-day entry plan
Evidence, assumptions and operational implications are separated below.
90-day entry plan
| Days | Objective | Actions | Owner | Deliverable |
|---|---|---|---|---|
| 0–15 | Registry and legal gate | Obtain matched INATRO/Customs/dealer extract by VIN, propulsion, class, age, owner type, city and active status; map entity, workshop, environment, fire, electricity, waste, data and insurance. | EVS board / Mozambique counsel | Definition and compliance file. |
- Objective
- Registry and legal gate
- Actions
- Obtain matched INATRO/Customs/dealer extract by VIN, propulsion, class, age, owner type, city and active status; map entity, workshop, environment, fire, electricity, waste, data and insurance.
- Owner
- EVS board / Mozambique counsel
- Deliverable
- Definition and compliance file.
Explicit go / no-go gates
Evidence, assumptions and operational implications are separated below.
Explicit go / no-go gates
| Gate | Go | No Go |
|---|---|---|
| Market denominator | Matched extract proves at least 500 registered active passenger/light-commercial BEV/PHEVs in Greater Maputo–Matola, separately identified | Classes/status/cities cannot be separated or count below 500. |
- Go
- Matched extract proves at least 500 registered active passenger/light-commercial BEV/PHEVs in Greater Maputo–Matola, separately identified
- No Go
- Classes/status/cities cannot be separated or count below 500.
Methodology
Evidence, assumptions and operational implications are separated below.
Greater Maputo–Matola partner-clinic EBITDA
MZN; EVS steady-state assumptions.
Methodology
| Step | Method |
|---|---|
| 1. Evidence hierarchy | Primary Mozambican authorities/operators and multilaterals first; relays and company announcements explicitly labelled. |
| 2. Definition control | Separate active passenger BEV/PHEV, all-powertrain parc, policy targets, bus announcements, two/three-wheel projects, swap stations and passenger EVSE. |
| 3. Market denominator | Leave current national passenger TAM null until matched active-registration extract. |
| 4. Forecasts | Apply 0.25%/0.5%/1.0% scenario shares to the 2024 all-powertrain light parc. High case equals the ETE private-transport target but remains an EVS proxy. |
| 5. Gate SAM | 500 Greater Maputo–Matola plug-ins × 90% active × 60% reach × 1.20 events. |
| 6. SOM | Zero before hard gates. |
| 7. Economics | Nominal MZN, VAT-exclusive/pre-tax EVS assumptions; annual volumes remain within gate SAM. |
| 8. Regulation | No incentive, permit, technician credential or standard assumed without written current confirmation. |
| 9. Validation | JSON, schema, formulas, citations, links, branding, definition control and template residue. |
- Method
- Primary Mozambican authorities/operators and multilaterals first; relays and company announcements explicitly labelled.
- Method
- Separate active passenger BEV/PHEV, all-powertrain parc, policy targets, bus announcements, two/three-wheel projects, swap stations and passenger EVSE.
- Method
- Leave current national passenger TAM null until matched active-registration extract.
- Method
- Apply 0.25%/0.5%/1.0% scenario shares to the 2024 all-powertrain light parc. High case equals the ETE private-transport target but remains an EVS proxy.
- Method
- 500 Greater Maputo–Matola plug-ins × 90% active × 60% reach × 1.20 events.
- Method
- Zero before hard gates.
- Method
- Nominal MZN, VAT-exclusive/pre-tax EVS assumptions; annual volumes remain within gate SAM.
- Method
- No incentive, permit, technician credential or standard assumed without written current confirmation.
- Method
- JSON, schema, formulas, citations, links, branding, definition control and template residue.
Evidence gaps
Evidence, assumptions and operational implications are separated below.
Evidence gaps
| Gap | Needed | Decision Effect |
|---|---|---|
| Active passenger/light-commercial BEV and PHEV count | Matched INATRO/Customs/dealer extract by VIN, propulsion, class, age, city and active status | Blocks TAM, standalone site and franchise. |
| BEV/PHEV/HEV/MHEV split and models | VIN/homologation classification and annual registration history | Blocks brand/model/service mix. |
| Public charging census | Site, connector, standard, kW, access, tariff, uptime and commissioning record | Blocks network-service claim. |
| Bus delivery/service status | Registrations, in-service buses, depot, charger count and OEM maintenance contract | Prevents announced fleet inflation. |
| EV workshop/HV competence route | Written Labour/INATRO/INNOQ/insurer requirements and adopted editions | Blocks repair launch. |
| Traction-battery waste route | Written classification, storage, carrier and recipient approvals | Holds pack work. |
| Paid fleet demand | Supported VIN list, utilisation, charging pattern, warranty and paid trial | Blocks commercial continuation. |
- Needed
- Matched INATRO/Customs/dealer extract by VIN, propulsion, class, age, city and active status
- Decision Effect
- Blocks TAM, standalone site and franchise.
- Needed
- VIN/homologation classification and annual registration history
- Decision Effect
- Blocks brand/model/service mix.
- Needed
- Site, connector, standard, kW, access, tariff, uptime and commissioning record
- Decision Effect
- Blocks network-service claim.
- Needed
- Registrations, in-service buses, depot, charger count and OEM maintenance contract
- Decision Effect
- Prevents announced fleet inflation.
- Needed
- Written Labour/INATRO/INNOQ/insurer requirements and adopted editions
- Decision Effect
- Blocks repair launch.
- Needed
- Written classification, storage, carrier and recipient approvals
- Decision Effect
- Holds pack work.
- Needed
- Supported VIN list, utilisation, charging pattern, warranty and paid trial
- Decision Effect
- Blocks commercial continuation.
Complete linked source register
Every material quantitative claim is linked or explicitly labelled as an EVS assumption.
Complete linked source register
| Source Id | Publisher | Publication Date | Accessed At | Scope | Href |
|---|---|---|---|---|---|
| ete | Ministry of Mineral Resources and Energy (MIREME) | 2023-12-29 | 2026-08-11 | Official strategy: EV transition begins in 2030; 1% of private road transport and 5% of road freight to grid-powered EVs, rising to 10% and 25% in 2040 and 50% each in 2050. Charging rollout is to begin gradually before 2030. | https://mireme.gov.mz/wp-content/uploads/2026/04/RESOLUCAO_61-2023_ESTRATEGIA_TRANSICAO_ENERGETICA1.pdf |
| ine_parc | 360 Mozambique / Lusa | 2026-02-18 | 2026-08-11 | Secondary relay of INE: 1.32m total vehicles in 2024, including 897,273 light vehicles, 267,792 heavy vehicles, 16,158 tractors and 100,695 motorcycles; no propulsion split. | https://360mozambique.com/business/ine-vehicle-fleet-grew-4-2-in-2024-surpassing-1-3-million-vehicles/ |
| lusa_imports | Lusa / Aman Alliance | 2026-03-18 | 2026-08-11 | Official-data relay: vehicle imports US$259.5m in Jan–Sep 2025; 2024 parc 1.32m. Import value is flow, not EV stock. | https://www.aman-alliance.org/Home/ContentDetail/101317 |
| maputo_2023 | INE Maputo City / INATRO | 2024-01-01 | 2026-08-11 | Mirror of official tables: Maputo City parc 546,526 in 2023 and 22,018 vehicles newly registered; no propulsion split. Use only as secondary mirror. | https://pt.scribd.com/document/833328170/Publicacao-de-Acidentes-de-Viacao-2023 |
| imf_2026 | International Monetary Fund | 2026-02-17 | 2026-08-11 | Primary macro evidence: real GDP growth 2.1% in 2024 and 0.5% in 2025; end-period inflation 3.2% in 2025; FX and debt constraints. | https://www.imf.org/en/news/articles/2026/02/14/pr-26052-mozambique-imf-executive-board-concludes-2025-article-iv-consultation-with-mozambique |
| imf_june | International Monetary Fund | 2026-06-12 | 2026-08-11 | Primary current risk update: weak growth, FX shortages, fiscal/debt vulnerabilities and climate/fuel-price risks. | https://www.imf.org/en/news/articles/2026/06/12/pr26199-mozambique-imf-staff-concludes-visit |
| worldbank_overview | World Bank | — | 2026-08-11 | Primary current macro and security context; World Bank estimates 2025 contraction and highlights northern security and climate risks. | https://www.worldbank.org/ext/en/country/mozambique |
| worldbank_energy | World Bank | 2025-03-21 | 2026-08-11 | Primary project evidence: electricity access rose from 31% in 2018 to 60% in 2024 according to EDM; not an EV-charging coverage statistic. | https://www.worldbank.org/en/news/press-release/2025/03/21/mozambique-afe-new-energy-project-to-bring-electricity-access-to-nearly-one-million-people |
| eep | EEP Africa | 2025-04-25 | 2026-08-11 | Funder-confirmed active pilot through October 2026: targets 59 electric motorbikes, 20 scooters, 30 three-wheelers and five swap stations. Targets are not deployed passenger-car stock. | https://eepafrica.org/portfolio/81169/electricity-mobility-mozambique |
| scf | Subnational Climate Fund | 2026-05-25 | 2026-08-11 | Project evidence for rural three-wheel EVs and solar/battery swapping; no passenger-car stock count. | https://www.subnational.finance/advancing-rural-electric-mobility-for-smallholder-agriculture-in-mozambique/ |
| metrobus | Africa Press | 2025-09-08 | 2026-08-11 | Secondary relay of operator announcement: one 18m CRRC bus unveiled, with 10 additional buses planned. Charger ratings were published using erroneous kW/h notation; commissioning count and service status are unverified. | https://www.africa-press.net/mozambique/all-news/metrobus-launches-mozambiques-first-electric-bus-fleet |
| metrobus_club | Club of Mozambique | 2025-09-03 | 2026-08-11 | Secondary corroboration of the same operator announcement; not independent deployment evidence. | https://clubofmozambique.com/news/metrobus-powers-the-future-of-mobility-mozambiques-first-electric-bus-fleet-and-charging-network/ |
| bus_plan_2024 | Africa Press | 2024-06-25 | 2026-08-11 | Historical company/IFC plan for 300 buses. Later evidence shows only one bus unveiled in 2025; planned quantities are not counted. | https://www.africa-press.net/mozambique/all-news/electric-buses-maputo-set-to-see-its-first-10-in-october |
| bus_procurement | Further Africa | 2025-03-06 | 2026-08-11 | Secondary procurement breakdown shows 150 CNG, 100 diesel medium, 100 rural mixed-use and 40 institutional buses; no electric buses. Prevents green-mobility misclassification. | https://furtherafrica.com/2025/03/06/mozambique-adds-390-buses-to-public-transport-fleet-pushing-for-greener-mobility/ |
| duty_zero | 360 Mozambique | 2025-12-16 | 2026-08-11 | Secondary relay of final parliamentary approval: customs duty for vehicles powered solely by electricity reduced from 20% to zero. Obtain current tariff-code ruling. | https://360mozambique.com/business/20-import-duty-on-electric-vehicles-removed/ |
| duty_zero_corrob | Africa Press | 2025-12-16 | 2026-08-11 | Secondary corroboration of duty exemption for solely electric vehicles; not evidence of VAT or hybrid treatment. | https://www.africa-press.net/mozambique/all-news/mozambique-exempts-electric-vehicle-imports-from-duties |
| excise_proposal | 360 Mozambique | 2025-11-01 | 2026-08-11 | Reports a draft specific-consumption-tax measure including electric/hybrid vehicles. Treat as proposal unless final gazette and tariff schedule are obtained. | https://360mozambique.com/development/sustainability/executive-proposes-tax-cuts-for-electric-vehicles-starting-in-2026/ |
| pae_measures | Ministry of Economy and Finance | — | 2026-08-11 | Official reform register: VAT reduction, selected electrification exemptions and urban-transport tax measure; eligibility is activity-specific. | https://pae.gov.mz/language/en/measures/ |
| pae_vat | Ministry of Economy and Finance | 2022-12-01 | 2026-08-11 | Official reform communication: standard VAT reduced from 17% to 16%; urban-transport IRPC reduction is not automatically applicable to an EV workshop. | https://pae.gov.mz/language/en/mozambique-reduces-vat-and-exempt-agriculture-and-electrification/ |
| pwc_cit | PwC | 2026-03-04 | 2026-08-11 | Professional current summary: standard resident corporate income tax 32%. Obtain Mozambican tax advice. | https://taxsummaries.pwc.com/mozambique/corporate/taxes-on-corporate-income |
| pwc_vat | PwC | 2026-03-04 | 2026-08-11 | Professional current summary: standard VAT 16%; treatment depends on registration and supplies. | https://taxsummaries.pwc.com/mozambique/corporate/other-taxes |
| kpmg_2026 | KPMG | 2026-01-07 | 2026-08-11 | Professional summary of laws published 29 December 2025 and effective 1 January 2026; current advice required. | https://kpmg.com/us/en/taxnewsflash/news/2026/01/tnf-mozambique-amendments-to-vat-corporate-and-individual-income-tax-excise-tax-and-customs-laws.html |
| investment_law | ABCC | 2023-07-19 | 2026-08-11 | Law-firm summary: new investment law effective September 2023 and potentially eligible guarantees/incentives; approval is not automatic. | https://www.abcc.co.mz/en/highlights/Investment-Law/328/ |
| investment_plmj | PLMJ | 2023-07-18 | 2026-08-11 | Independent legal summary of Law 8/2023; confirm regulations and eligibility with APIEX/local counsel. | https://www.plmj.com/pt/conhecimento/notas-informativas/Mocambique-Nova-Lei-de-Investimento-Privado/32782/ |
| apiex | APIEX | — | 2026-08-11 | Official investment-promotion route; obtain project-specific approval and incentive certificate. | https://apiex.gov.mz/ |
| inatro_vehicles | INATRO | — | 2026-08-11 | Official registration route requiring customs-clearance and inspection documents. | https://www.inatro.gov.mz/?page_id=1102 |
| inatro_law | INATRO | — | 2026-08-11 | Official repository for Road Code, technical inspection, automotive transport and dangerous-goods instruments. | https://www.inatro.gov.mz/?page_id=701 |
| inatro_offices | INATRO | — | 2026-08-11 | Official delegation network; relevant to Maputo/Matola, Beira, Nampula, Tete and other provincial workflows. | https://www.inatro.gov.mz/?page_id=972 |
| labour | National Social Security Institute (INSS) | 2023-08-25 | 2026-08-11 | Official download of current Labour Law; effective February 2024. Obtain employer, OSH and foreign-worker advice. | https://www.inss.gov.mz/sdm_downloads/20320/ |
| eia | Netherlands Commission for Environmental Assessment | 2025-01-01 | 2026-08-11 | Authoritative legal overview: Decree 54/2015 screening and A+/A/B/C categories; all potentially impactful activities require screening. | https://www.eia.nl/en/countries/mozambique/legislation-at-project-level/ |
| environment_law | GEF Mozambique / SIBMOZ | — | 2026-08-11 | Government-linked legal repository for Environmental Law 20/1997 and EIA Decree 54/2015. | https://sibmoz.gov.mz/legal-framework/ |
| haz_waste | Imprensa Nacional de Moçambique | 2014-12-31 | 2026-08-11 | Official gazette index for hazardous-waste management regulation and annexes. | https://www.inm.gov.mz/pt-br/content/conselho-de-ministros-suplemento-n%C2%BA-11-de-311214-pag-1940-43-76-br-n%C2%BA-105-boletim-da |
| intertek_psi | Intertek | — | 2026-08-11 | Government-contracted inspection information: all imported used vehicles require origin PSI under Ministerial Diploma 244/2011; uninspected arrivals face destination inspection and penalty. | https://www.intertek.com.co/gobierno-comercio-exterior/programa-evaluacion-conformidad/inspeccion-pre-embarque-para-la-exportacion-a-mozambique/ |
| intertek_coc | Intertek | 2025-07-01 | 2026-08-11 | Conformity-assessment programme requires CoC for regulated products from 27 June 2025; verify EV/parts/EVSE scope with INNOQ and Customs. | https://www.intertek.com/news/2025/intertek-ready-to-support-with-mozambiques-mandatory-import-requirements/ |
| arene | Energy Regulatory Authority (ARENE) | — | 2026-08-11 | Official energy-regulator route. Published tariff table may be stale; obtain premises-specific current tariff, load and connection quote. | https://arene.org.mz/ |
| edm | EDM | — | 2026-08-11 | Distribution utility route for service capacity, earthing, protection, metering, tariff and outages. | https://www.edm.co.mz/ |
| data_policy | UN Economic Commission for Africa | 2025-12-05 | 2026-08-11 | Authoritative policy-development evidence; policy validation is not a comprehensive enacted data-protection law. | https://uneca.org/stories/mozambique-validates-landmark-data-governance-policy |
| data_bill | Afriwise | 2025-05-15 | 2026-08-11 | Legal-intelligence summary: no dedicated comprehensive law at publication; bill was draft. Constitution, Labour Law, Penal Code and Electronic Transactions Law still apply. | https://www.afriwise.com/blog/mozambique-releases-draft-personal-data-protection-law |
| toyota | Toyota Mozambique / CFAO | — | 2026-08-11 | Official OEM-backed dealership and aftersales footprint; no EV registration or HV-capability claim. | https://www.toyota.co.mz/pt/concessao/toyota-mocambique/cfao-motors-mozambique-maputo |
| ford | Ford Mozambique | — | 2026-08-11 | Official dealer/repair network in Maputo, Nampula, Beira, Tete, Chimoio and other cities; no passenger-EV capability claim. | https://ford.co.mz/locate-a-dealer/ |
| chery | Chery Mozambique | — | 2026-08-11 | Official Maputo dealer context; no audited EV sales or service capability. | https://chery.co.mz/en/locate-a-dealer/ |
| insurer_workshops | Global Alliance Seguros | — | 2026-08-11 | Insurer-published Maputo/Matola workshop list; useful partner long-list, not an EV/HV audit. | https://www.ga.co.mz/sinistros/sinistro-automovel/oficinas/ |
| shell_workshops | Shell Mozambique | — | 2026-08-11 | Operator workshop network context; conventional service list, not EV capability. | https://www.shell.co.mz/en_mz/motorists/oil-change-center.html |
| vims | World Bank | 2025-01-30 | 2026-08-11 | Explains active-status and data-quality controls needed before treating registration records as stock; not Mozambique market data. | https://blogs.worldbank.org/en/transport/vehicle-information-management-systems |
| iso_6469 | ISO | — | 2026-08-11 | International HV safety benchmark; confirm adopted edition/status with INNOQ and insurer. | https://www.iso.org/standard/45477.html |
| iso_17409 | ISO | — | 2026-08-11 | International conductive-charging benchmark; local electrical approvals control. | https://www.iso.org/standard/68474.html |
| iec_61851 | IEC | — | 2026-08-11 | International EVSE benchmark; not proof of Mozambican adoption. | https://webstore.iec.ch/en/publication/33644 |
| un_tests | UNECE | — | 2026-08-11 | UN 38.3 lithium-battery transport testing context; national, carrier and recipient permissions still apply. | https://unece.org/transport/dangerous-goods/rev8-files |
| basel | Basel Convention Secretariat | — | 2026-08-11 | Transboundary hazardous-waste controls; verify competent authority, classification and prior consent for traction batteries. | https://www.basel.int/TheConvention/Overview/tabid/1271/Default.aspx |
| ilo_osh | International Labour Organization | — | 2026-08-11 | International OSH-management benchmark; national labour/inspectorate requirements control. | https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001 |
| mixed_sources | EVS Worldwide | 2026-08-11 | 2026-08-11 | Rows retain individual bracketed source identifiers. | EVS://Mozambique/mixed-source-evidence |
| evs_model | EVS Worldwide | 2026-08-11 | 2026-08-11 | Internal planning assumptions and calculations; not sourced market facts. | EVS://Mozambique/market-entry-model |
- Publisher
- Ministry of Mineral Resources and Energy (MIREME)
- Publication Date
- 2023-12-29
- Accessed At
- 2026-08-11
- Scope
- Official strategy: EV transition begins in 2030; 1% of private road transport and 5% of road freight to grid-powered EVs, rising to 10% and 25% in 2040 and 50% each in 2050. Charging rollout is to begin gradually before 2030.
- Href
- https://mireme.gov.mz/wp-content/uploads/2026/04/RESOLUCAO_61-2023_ESTRATEGIA_TRANSICAO_ENERGETICA1.pdf
- Publisher
- 360 Mozambique / Lusa
- Publication Date
- 2026-02-18
- Accessed At
- 2026-08-11
- Scope
- Secondary relay of INE: 1.32m total vehicles in 2024, including 897,273 light vehicles, 267,792 heavy vehicles, 16,158 tractors and 100,695 motorcycles; no propulsion split.
- Href
- https://360mozambique.com/business/ine-vehicle-fleet-grew-4-2-in-2024-surpassing-1-3-million-vehicles/
- Publisher
- Lusa / Aman Alliance
- Publication Date
- 2026-03-18
- Accessed At
- 2026-08-11
- Scope
- Official-data relay: vehicle imports US$259.5m in Jan–Sep 2025; 2024 parc 1.32m. Import value is flow, not EV stock.
- Href
- https://www.aman-alliance.org/Home/ContentDetail/101317
- Publisher
- INE Maputo City / INATRO
- Publication Date
- 2024-01-01
- Accessed At
- 2026-08-11
- Scope
- Mirror of official tables: Maputo City parc 546,526 in 2023 and 22,018 vehicles newly registered; no propulsion split. Use only as secondary mirror.
- Href
- https://pt.scribd.com/document/833328170/Publicacao-de-Acidentes-de-Viacao-2023
- Publisher
- International Monetary Fund
- Publication Date
- 2026-02-17
- Accessed At
- 2026-08-11
- Scope
- Primary macro evidence: real GDP growth 2.1% in 2024 and 0.5% in 2025; end-period inflation 3.2% in 2025; FX and debt constraints.
- Href
- https://www.imf.org/en/news/articles/2026/02/14/pr-26052-mozambique-imf-executive-board-concludes-2025-article-iv-consultation-with-mozambique
- Publisher
- International Monetary Fund
- Publication Date
- 2026-06-12
- Accessed At
- 2026-08-11
- Scope
- Primary current risk update: weak growth, FX shortages, fiscal/debt vulnerabilities and climate/fuel-price risks.
- Href
- https://www.imf.org/en/news/articles/2026/06/12/pr26199-mozambique-imf-staff-concludes-visit
- Publisher
- World Bank
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Primary current macro and security context; World Bank estimates 2025 contraction and highlights northern security and climate risks.
- Href
- https://www.worldbank.org/ext/en/country/mozambique
- Publisher
- World Bank
- Publication Date
- 2025-03-21
- Accessed At
- 2026-08-11
- Scope
- Primary project evidence: electricity access rose from 31% in 2018 to 60% in 2024 according to EDM; not an EV-charging coverage statistic.
- Href
- https://www.worldbank.org/en/news/press-release/2025/03/21/mozambique-afe-new-energy-project-to-bring-electricity-access-to-nearly-one-million-people
- Publisher
- EEP Africa
- Publication Date
- 2025-04-25
- Accessed At
- 2026-08-11
- Scope
- Funder-confirmed active pilot through October 2026: targets 59 electric motorbikes, 20 scooters, 30 three-wheelers and five swap stations. Targets are not deployed passenger-car stock.
- Href
- https://eepafrica.org/portfolio/81169/electricity-mobility-mozambique
- Publisher
- Subnational Climate Fund
- Publication Date
- 2026-05-25
- Accessed At
- 2026-08-11
- Scope
- Project evidence for rural three-wheel EVs and solar/battery swapping; no passenger-car stock count.
- Href
- https://www.subnational.finance/advancing-rural-electric-mobility-for-smallholder-agriculture-in-mozambique/
- Publisher
- Africa Press
- Publication Date
- 2025-09-08
- Accessed At
- 2026-08-11
- Scope
- Secondary relay of operator announcement: one 18m CRRC bus unveiled, with 10 additional buses planned. Charger ratings were published using erroneous kW/h notation; commissioning count and service status are unverified.
- Href
- https://www.africa-press.net/mozambique/all-news/metrobus-launches-mozambiques-first-electric-bus-fleet
- Publisher
- Club of Mozambique
- Publication Date
- 2025-09-03
- Accessed At
- 2026-08-11
- Scope
- Secondary corroboration of the same operator announcement; not independent deployment evidence.
- Href
- https://clubofmozambique.com/news/metrobus-powers-the-future-of-mobility-mozambiques-first-electric-bus-fleet-and-charging-network/
- Publisher
- Africa Press
- Publication Date
- 2024-06-25
- Accessed At
- 2026-08-11
- Scope
- Historical company/IFC plan for 300 buses. Later evidence shows only one bus unveiled in 2025; planned quantities are not counted.
- Href
- https://www.africa-press.net/mozambique/all-news/electric-buses-maputo-set-to-see-its-first-10-in-october
- Publisher
- Further Africa
- Publication Date
- 2025-03-06
- Accessed At
- 2026-08-11
- Scope
- Secondary procurement breakdown shows 150 CNG, 100 diesel medium, 100 rural mixed-use and 40 institutional buses; no electric buses. Prevents green-mobility misclassification.
- Href
- https://furtherafrica.com/2025/03/06/mozambique-adds-390-buses-to-public-transport-fleet-pushing-for-greener-mobility/
- Publisher
- 360 Mozambique
- Publication Date
- 2025-12-16
- Accessed At
- 2026-08-11
- Scope
- Secondary relay of final parliamentary approval: customs duty for vehicles powered solely by electricity reduced from 20% to zero. Obtain current tariff-code ruling.
- Href
- https://360mozambique.com/business/20-import-duty-on-electric-vehicles-removed/
- Publisher
- Africa Press
- Publication Date
- 2025-12-16
- Accessed At
- 2026-08-11
- Scope
- Secondary corroboration of duty exemption for solely electric vehicles; not evidence of VAT or hybrid treatment.
- Href
- https://www.africa-press.net/mozambique/all-news/mozambique-exempts-electric-vehicle-imports-from-duties
- Publisher
- 360 Mozambique
- Publication Date
- 2025-11-01
- Accessed At
- 2026-08-11
- Scope
- Reports a draft specific-consumption-tax measure including electric/hybrid vehicles. Treat as proposal unless final gazette and tariff schedule are obtained.
- Href
- https://360mozambique.com/development/sustainability/executive-proposes-tax-cuts-for-electric-vehicles-starting-in-2026/
- Publisher
- Ministry of Economy and Finance
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official reform register: VAT reduction, selected electrification exemptions and urban-transport tax measure; eligibility is activity-specific.
- Href
- https://pae.gov.mz/language/en/measures/
- Publisher
- Ministry of Economy and Finance
- Publication Date
- 2022-12-01
- Accessed At
- 2026-08-11
- Scope
- Official reform communication: standard VAT reduced from 17% to 16%; urban-transport IRPC reduction is not automatically applicable to an EV workshop.
- Href
- https://pae.gov.mz/language/en/mozambique-reduces-vat-and-exempt-agriculture-and-electrification/
- Publisher
- PwC
- Publication Date
- 2026-03-04
- Accessed At
- 2026-08-11
- Scope
- Professional current summary: standard resident corporate income tax 32%. Obtain Mozambican tax advice.
- Href
- https://taxsummaries.pwc.com/mozambique/corporate/taxes-on-corporate-income
- Publisher
- PwC
- Publication Date
- 2026-03-04
- Accessed At
- 2026-08-11
- Scope
- Professional current summary: standard VAT 16%; treatment depends on registration and supplies.
- Href
- https://taxsummaries.pwc.com/mozambique/corporate/other-taxes
- Publisher
- KPMG
- Publication Date
- 2026-01-07
- Accessed At
- 2026-08-11
- Scope
- Professional summary of laws published 29 December 2025 and effective 1 January 2026; current advice required.
- Href
- https://kpmg.com/us/en/taxnewsflash/news/2026/01/tnf-mozambique-amendments-to-vat-corporate-and-individual-income-tax-excise-tax-and-customs-laws.html
- Publisher
- ABCC
- Publication Date
- 2023-07-19
- Accessed At
- 2026-08-11
- Scope
- Law-firm summary: new investment law effective September 2023 and potentially eligible guarantees/incentives; approval is not automatic.
- Href
- https://www.abcc.co.mz/en/highlights/Investment-Law/328/
- Publisher
- PLMJ
- Publication Date
- 2023-07-18
- Accessed At
- 2026-08-11
- Scope
- Independent legal summary of Law 8/2023; confirm regulations and eligibility with APIEX/local counsel.
- Href
- https://www.plmj.com/pt/conhecimento/notas-informativas/Mocambique-Nova-Lei-de-Investimento-Privado/32782/
- Publisher
- APIEX
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official investment-promotion route; obtain project-specific approval and incentive certificate.
- Href
- https://apiex.gov.mz/
- Publisher
- INATRO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official registration route requiring customs-clearance and inspection documents.
- Href
- https://www.inatro.gov.mz/?page_id=1102
- Publisher
- INATRO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official repository for Road Code, technical inspection, automotive transport and dangerous-goods instruments.
- Href
- https://www.inatro.gov.mz/?page_id=701
- Publisher
- INATRO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official delegation network; relevant to Maputo/Matola, Beira, Nampula, Tete and other provincial workflows.
- Href
- https://www.inatro.gov.mz/?page_id=972
- Publisher
- National Social Security Institute (INSS)
- Publication Date
- 2023-08-25
- Accessed At
- 2026-08-11
- Scope
- Official download of current Labour Law; effective February 2024. Obtain employer, OSH and foreign-worker advice.
- Href
- https://www.inss.gov.mz/sdm_downloads/20320/
- Publisher
- Netherlands Commission for Environmental Assessment
- Publication Date
- 2025-01-01
- Accessed At
- 2026-08-11
- Scope
- Authoritative legal overview: Decree 54/2015 screening and A+/A/B/C categories; all potentially impactful activities require screening.
- Href
- https://www.eia.nl/en/countries/mozambique/legislation-at-project-level/
- Publisher
- GEF Mozambique / SIBMOZ
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Government-linked legal repository for Environmental Law 20/1997 and EIA Decree 54/2015.
- Href
- https://sibmoz.gov.mz/legal-framework/
- Publisher
- Imprensa Nacional de Moçambique
- Publication Date
- 2014-12-31
- Accessed At
- 2026-08-11
- Scope
- Official gazette index for hazardous-waste management regulation and annexes.
- Href
- https://www.inm.gov.mz/pt-br/content/conselho-de-ministros-suplemento-n%C2%BA-11-de-311214-pag-1940-43-76-br-n%C2%BA-105-boletim-da
- Publisher
- Intertek
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Government-contracted inspection information: all imported used vehicles require origin PSI under Ministerial Diploma 244/2011; uninspected arrivals face destination inspection and penalty.
- Href
- https://www.intertek.com.co/gobierno-comercio-exterior/programa-evaluacion-conformidad/inspeccion-pre-embarque-para-la-exportacion-a-mozambique/
- Publisher
- Intertek
- Publication Date
- 2025-07-01
- Accessed At
- 2026-08-11
- Scope
- Conformity-assessment programme requires CoC for regulated products from 27 June 2025; verify EV/parts/EVSE scope with INNOQ and Customs.
- Href
- https://www.intertek.com/news/2025/intertek-ready-to-support-with-mozambiques-mandatory-import-requirements/
- Publisher
- Energy Regulatory Authority (ARENE)
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official energy-regulator route. Published tariff table may be stale; obtain premises-specific current tariff, load and connection quote.
- Href
- https://arene.org.mz/
- Publisher
- EDM
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Distribution utility route for service capacity, earthing, protection, metering, tariff and outages.
- Href
- https://www.edm.co.mz/
- Publisher
- UN Economic Commission for Africa
- Publication Date
- 2025-12-05
- Accessed At
- 2026-08-11
- Scope
- Authoritative policy-development evidence; policy validation is not a comprehensive enacted data-protection law.
- Href
- https://uneca.org/stories/mozambique-validates-landmark-data-governance-policy
- Publisher
- Afriwise
- Publication Date
- 2025-05-15
- Accessed At
- 2026-08-11
- Scope
- Legal-intelligence summary: no dedicated comprehensive law at publication; bill was draft. Constitution, Labour Law, Penal Code and Electronic Transactions Law still apply.
- Href
- https://www.afriwise.com/blog/mozambique-releases-draft-personal-data-protection-law
- Publisher
- Toyota Mozambique / CFAO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official OEM-backed dealership and aftersales footprint; no EV registration or HV-capability claim.
- Href
- https://www.toyota.co.mz/pt/concessao/toyota-mocambique/cfao-motors-mozambique-maputo
- Publisher
- Ford Mozambique
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official dealer/repair network in Maputo, Nampula, Beira, Tete, Chimoio and other cities; no passenger-EV capability claim.
- Href
- https://ford.co.mz/locate-a-dealer/
- Publisher
- Chery Mozambique
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official Maputo dealer context; no audited EV sales or service capability.
- Href
- https://chery.co.mz/en/locate-a-dealer/
- Publisher
- Global Alliance Seguros
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Insurer-published Maputo/Matola workshop list; useful partner long-list, not an EV/HV audit.
- Href
- https://www.ga.co.mz/sinistros/sinistro-automovel/oficinas/
- Publisher
- Shell Mozambique
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Operator workshop network context; conventional service list, not EV capability.
- Href
- https://www.shell.co.mz/en_mz/motorists/oil-change-center.html
- Publisher
- World Bank
- Publication Date
- 2025-01-30
- Accessed At
- 2026-08-11
- Scope
- Explains active-status and data-quality controls needed before treating registration records as stock; not Mozambique market data.
- Href
- https://blogs.worldbank.org/en/transport/vehicle-information-management-systems
- Publisher
- ISO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International HV safety benchmark; confirm adopted edition/status with INNOQ and insurer.
- Href
- https://www.iso.org/standard/45477.html
- Publisher
- ISO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International conductive-charging benchmark; local electrical approvals control.
- Href
- https://www.iso.org/standard/68474.html
- Publisher
- IEC
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International EVSE benchmark; not proof of Mozambican adoption.
- Href
- https://webstore.iec.ch/en/publication/33644
- Publisher
- UNECE
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- UN 38.3 lithium-battery transport testing context; national, carrier and recipient permissions still apply.
- Href
- https://unece.org/transport/dangerous-goods/rev8-files
- Publisher
- Basel Convention Secretariat
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Transboundary hazardous-waste controls; verify competent authority, classification and prior consent for traction batteries.
- Href
- https://www.basel.int/TheConvention/Overview/tabid/1271/Default.aspx
- Publisher
- International Labour Organization
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International OSH-management benchmark; national labour/inspectorate requirements control.
- Href
- https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Rows retain individual bracketed source identifiers.
- Href
- EVS://Mozambique/mixed-source-evidence
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Internal planning assumptions and calculations; not sourced market facts.
- Href
- EVS://Mozambique/market-entry-model
Validation register
Evidence, assumptions and operational implications are separated below.
Validation register
| Check | Status | Detail |
|---|---|---|
| JSON / UTF-8 | Pass | Generated and reparsed. |
| Schema | Pass | Required blocks, datasets, calculations and source registry present. |
| Calculations | Pass | Policy-share sensitivities, gate SAM and annual/90-day economics recomputed. |
| Definition control | Pass | Active plug-ins, all-powertrain parc, future targets, buses, motorcycles, swap stations and passenger EVSE remain separate. |
| Branding | Pass | EVS Green #5BCC12, Silver #A7B3BB, black/charcoal, white/light grey and Inter; no blue. |
| Decision | Pass | Current national TAM null, executable SOM zero and hard gates explicit. |
- Status
- Pass
- Detail
- Generated and reparsed.
- Status
- Pass
- Detail
- Required blocks, datasets, calculations and source registry present.
- Status
- Pass
- Detail
- Policy-share sensitivities, gate SAM and annual/90-day economics recomputed.
- Status
- Pass
- Detail
- Active plug-ins, all-powertrain parc, future targets, buses, motorcycles, swap stations and passenger EVSE remain separate.
- Status
- Pass
- Detail
- EVS Green #5BCC12, Silver #A7B3BB, black/charcoal, white/light grey and Inter; no blue.
- Status
- Pass
- Detail
- Current national TAM null, executable SOM zero and hard gates explicit.
EVS Board Position
CONDITIONAL GO for evidence-gated diligence and scheduled Greater Maputo–Matola partner-clinic days; NO-GO standalone/franchise; HOLD traction-pack work.
Source register
52 primary and derived sources
ShowHide
Source register
52 primary and derived sources