Market intelligence/Africa/Report available
Mozambique.
EVS Mozambique EV Service Centre Market Entry
Decision-grade Mozambique assessment separating active passenger plug-in data gaps, all-powertrain parc, future policy targets, buses, two/three-wheel projects, charging evidence and EVS assumptions.
Active passenger plug-in stock
—
No authoritative active passenger BEV/PHEV stock series.
Public connectors
—
No verified public passenger connector census.
Gate SAM jobs/year
324
Only after 500 separated active Greater Maputo–Matola plug-ins.
Base simple payback
5.714
Partner-clinic assumption on MZN1.2m reversible capex.
01/The verdict in full
Executive summary
Evidence, assumptions and operational implications are separated below.
02
Market headline
Evidence, assumptions and operational implications are separated below.
Market headline
- Value
- 1,320,000
- Unit
- vehicles
- Status
- INE-attributed secondary relay; no propulsion split [ine_parc].
- Value
- 897,273
- Unit
- vehicles
- Status
- INE-attributed; not private-only and no powertrain split [ine_parc].
- Value
- —
- Unit
- vehicles
- Status
- No authoritative separated active-stock series located.
- Value
- —
- Unit
- connectors
- Status
- No authoritative national/site-level census located.
- Value
- 324
- Unit
- jobs/year
- Status
- Activates only after 500 active Greater Maputo–Matola plug-ins.
- Value
- 0
- Unit
- jobs
- Status
- Zero until every hard gate passes.
03
Macroeconomic context
Evidence, assumptions and operational implications are separated below.
Macroeconomic context
- Value
- 2.1
- Unit
- percent
- Period
- 2024
- Source
- IMF [imf_2026]
04
Market size and vehicle parc context
The 1.32m parc is all powertrains. No current active passenger/light-commercial plug-in denominator was located.
Market size and vehicle parc context
- Value
- 1,320,000
- Period
- 2024
- Treatment
- All powertrains; rounded public relay [ine_parc].
- Value
- 897,273
- Period
- 2024
- Treatment
- All powertrains; not passenger EV stock [ine_parc].
- Value
- 267,792
- Period
- 2024
- Treatment
- All powertrains [ine_parc].
- Value
- 100,695
- Period
- 2024
- Treatment
- All powertrains; separate workstream [ine_parc].
- Value
- 564,525
- Period
- 2024
- Treatment
- All powertrains [ine_parc].
- Value
- 496,707
- Period
- 2024
- Treatment
- All powertrains; territorial overlap/definition to verify [ine_parc].
- Value
- —
- Period
- Current
- Treatment
- TAM denominator unavailable.
05
BEV/PHEV sales, stock and adoption history
No authoritative annual BEV/PHEV sales or active-stock history was located; nulls are deliberate.
Vehicles; not EV stock.
Source: INE: Vehicle Fleet Grew 4.2% in 2024, Surpassing 1.3 Million Vehicles
BEV/PHEV sales, stock and adoption history
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- 1.2m all-powertrain parc reported; no propulsion split.
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- 1.27m all-powertrain vehicles reported; no EV split [lusa_imports].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- 1.32m all-powertrain parc and 897,273 light vehicles [ine_parc].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- One electric bus unveiled; duty exemption approved late year; no registry series [metrobus] [duty_zero].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- No authoritative active-stock or sales release located as of access date.
06
Definition reconciliation
Evidence, assumptions and operational implications are separated below.
Definition reconciliation
- Treatment
- All-powertrain administrative parc
- Reason
- No powertrain or active-status definition published in accessible relay [ine_parc].
- Treatment
- Official strategy target share
- Reason
- Target, not realised stock or forecast [ete].
- Treatment
- Observed launch signal only
- Reason
- Not passenger-car TAM or confirmed in-service fleet [metrobus].
- Treatment
- Announced pipeline
- Reason
- No delivery/registration evidence; excluded [metrobus] [bus_plan_2024].
- Treatment
- Project targets
- Reason
- Funder page describes pilot target, not active fleet [eep].
- Treatment
- Project target
- Reason
- Not public passenger-car charging [eep].
- Treatment
- Policy incentive for solely electric vehicles
- Reason
- Customs benefit, not adoption count; written classification required [duty_zero].
07
Cautious / base / high forecasts
These are EVS share sensitivities on the 2024 light parc. The high case mirrors the ETE 2030 private-transport target, but is not an official vehicle forecast.
Cautious / base / high forecasts
- Share Pct
- 0.25
- Modelled 2030 Plug In Count
- 2,243
- Basis
- EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy.
- Share Pct
- 0.5
- Modelled 2030 Plug In Count
- 4,486
- Basis
- EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy.
- Share Pct
- 1
- Modelled 2030 Plug In Count
- 8,973
- Basis
- EVS sensitivity applied to the 2024 all-powertrain light-vehicle parc. High case equals the ETE 2030 target share for private road transport; it is not a stock forecast and the denominator is only a proxy.
08
Charging infrastructure
Bus charging and two-wheel swapping are not a public passenger-car connector network. A passenger EVSE census remains null.
Charging infrastructure
- Count
- —
- Status
- No authoritative connector, power, access, tariff and uptime census located.
- Count
- —
- Status
- Operator-linked announcement identifies charger ratings but no commissioned count/site register; published kW/h units are technically invalid [metrobus].
- Count
- 5
- Status
- Pilot target for motorbikes/scooters/three-wheelers; not passenger-car EVSE [eep].
- Count
- —
- Status
- Obtain EDM/ARENE site-specific load, earthing, protection, metering, tariff and outage evidence [edm] [arene].
09
Electric two- and three-wheel ecosystem
Evidence, assumptions and operational implications are separated below.
EVS model on 2024 light parc; high case mirrors the ETE 1% target.
Electric two- and three-wheel ecosystem
- Assets
- 59
- Unit
- electric motorbikes target
- Status
- Pilot target to October 2026 [eep].
- Assets
- 20
- Unit
- electric scooters target
- Status
- Pilot target [eep].
- Assets
- 30
- Unit
- electric three-wheelers target
- Status
- Pilot target [eep].
- Assets
- 5
- Unit
- swap stations target
- Status
- Two/three-wheel infrastructure [eep].
- Assets
- —
- Unit
- rural three-wheel EVs
- Status
- Project evidence; quantity not publicly confirmed [scf].
10
Electric buses
Evidence, assumptions and operational implications are separated below.
Electric buses
- Value
- 1
- Unit
- bus
- Period
- FACIM 2025
- Status
- Secondary operator relay; service/registration status unverified [metrobus].
- Value
- 10
- Unit
- buses
- Period
- —
- Status
- Plan only [metrobus].
- Value
- 300
- Unit
- buses
- Period
- —
- Status
- Historical plan; not delivered stock [bus_plan_2024].
- Value
- 0
- Unit
- identified buses
- Period
- —
- Status
- Reported 390-bus mix was CNG/diesel/other, not electric [bus_procurement].
11
Vehicle parc age and service demand
Evidence, assumptions and operational implications are separated below.
Vehicle parc age and service demand
- Value
- 897,273
- Unit
- vehicles
- Implication
- Large mechanical-service base but not EV demand [ine_parc].
- Value
- 12
- Unit
- percent
- Implication
- Vehicle-service demand grows; EV share remains unknown [ine_parc].
- Value
- —
- Unit
- years
- Implication
- No current official age distribution located.
- Value
- 1
- Unit
- mandatory process
- Implication
- Import/service files should capture inspection and conformity evidence [intertek_psi].
- Value
- —
- Unit
- vehicles
- Implication
- Blocks current TAM and site density.
12
EVS assumptions
Evidence, assumptions and operational implications are separated below.
EVS assumptions
- Value
- 500
- Unit
- active passenger/light-commercial BEV/PHEV
- Basis
- EVS density gate, not estimate.
- Value
- 0.9
- Unit
- share
- Basis
- EVS planning haircut after registry proof.
- Value
- 0.6
- Unit
- share
- Basis
- After warranty, captive, unsupported-VIN and consent screening.
- Value
- 1.2
- Unit
- jobs/vehicle/year
- Basis
- EVS diagnostic/chassis blend.
- Value
- 12,500
- Unit
- MZN/job
- Basis
- Replace with paid observations.
- Value
- 1,200,000
- Unit
- MZN
- Basis
- EVS board gate.
- Value
- 0
- Unit
- jobs
- Basis
- Deliberately zero.
13
Transparent TAM / SAM / SOM
Current national TAM remains null and executable SOM zero. The quantified opportunity is a board gate, not a market estimate.
Transparent TAM / SAM / SOM
- Vehicles
- —
- Jobs Per Year
- —
- Revenue Mzn
- —
- Status
- Not quantified: authoritative active denominator unavailable.
- Vehicles
- 8,973
- Jobs Per Year
- —
- Revenue Mzn
- —
- Status
- 1% × 2024 light parc; illustrative, not current TAM or official forecast [ete] [ine_parc].
- Vehicles
- 270
- Jobs Per Year
- 324
- Revenue Mzn
- 4,050,000
- Status
- 500 × 90% active × 60% reach × 1.20 events.
14
Customer and fleet segments
Evidence, assumptions and operational implications are separated below.
Customer and fleet segments
- Need
- Pre-purchase, scan, charging, 12V and chassis evidence
- Priority
- High only for supported VINs.
- Need
- Route/charging readiness and condition reporting
- Priority
- Highest through paid fleet trial.
- Need
- Uptime, tyres, brakes, charging and 12V
- Priority
- Passenger cars/vans only; motorcycles separate.
- Need
- Procurement-compliant reporting and SLA
- Priority
- Contract only.
- Need
- Swap-battery tools and operator partnership
- Priority
- Separate workstream [eep] [scf].
- Need
- Depot tools, lifts and OEM contract
- Priority
- Excluded absent verified fleet contract.
15
Leading EV brands and models
Evidence, assumptions and operational implications are separated below.
Leading EV brands and models
- Model
- VIN-level discovery required
- Powertrain
- BEV/PHEV mixed
- Signal
- No official brand/model registration ranking located; commercial availability does not prove stock.
- Model
- Conventional and hybrid ecosystem
- Powertrain
- Mixed
- Signal
- Strong local aftersales footprint; no passenger plug-in volume or HV-capability claim [toyota].
- Model
- Conventional commercial/passenger ecosystem
- Powertrain
- Mixed
- Signal
- National repair network; no local EV volume proof [ford].
- Model
- Passenger/SUV ecosystem
- Powertrain
- Mixed
- Signal
- Maputo dealer presence; no audited EV sales [chery].
- Model
- 18m articulated bus
- Powertrain
- BEV bus
- Signal
- One vehicle unveiled; service status unverified [metrobus].
16In the full report
Independent and OEM competitors
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
17In the full report
Priority cities and regions
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
18In the full report
Consumer incentives and policy
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
19In the full report
Business, tax and investment incentives
Reported EV duty relief and investment incentives require written current classification/approval; economics assumes no benefit.
This section is in the full report.
20In the full report
Labour, licensing and workshop regulation
Every material authorisation is a launch gate; this is not legal, tax, engineering or insurance advice.
This section is in the full report.
21In the full report
High-voltage controls
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
22In the full report
Battery and waste controls
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
23In the full report
Recommended service portfolio
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
24In the full report
Operating model
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
25In the full report
Franchise pathway
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
26In the full report
Pilot steady-state economics
All volumes, prices, margins, costs and capex are EVS assumptions in nominal MZN, VAT-exclusive and pre-tax.
This section is in the full report.
27In the full report
90-day pilot economics
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
28In the full report
Risks and mitigations
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
29In the full report
90-day entry plan
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
30In the full report
Explicit go / no-go gates
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
31
Methodology
Evidence, assumptions and operational implications are separated below.
MZN; EVS steady-state assumptions.
Methodology
- Method
- Primary Mozambican authorities/operators and multilaterals first; relays and company announcements explicitly labelled.
- Method
- Separate active passenger BEV/PHEV, all-powertrain parc, policy targets, bus announcements, two/three-wheel projects, swap stations and passenger EVSE.
- Method
- Leave current national passenger TAM null until matched active-registration extract.
- Method
- Apply 0.25%/0.5%/1.0% scenario shares to the 2024 all-powertrain light parc. High case equals the ETE private-transport target but remains an EVS proxy.
- Method
- 500 Greater Maputo–Matola plug-ins × 90% active × 60% reach × 1.20 events.
- Method
- Zero before hard gates.
- Method
- Nominal MZN, VAT-exclusive/pre-tax EVS assumptions; annual volumes remain within gate SAM.
- Method
- No incentive, permit, technician credential or standard assumed without written current confirmation.
- Method
- JSON, schema, formulas, citations, links, branding, definition control and template residue.
32
Evidence gaps
Evidence, assumptions and operational implications are separated below.
Evidence gaps
- Needed
- Matched INATRO/Customs/dealer extract by VIN, propulsion, class, age, city and active status
- Decision Effect
- Blocks TAM, standalone site and franchise.
- Needed
- VIN/homologation classification and annual registration history
- Decision Effect
- Blocks brand/model/service mix.
- Needed
- Site, connector, standard, kW, access, tariff, uptime and commissioning record
- Decision Effect
- Blocks network-service claim.
- Needed
- Registrations, in-service buses, depot, charger count and OEM maintenance contract
- Decision Effect
- Prevents announced fleet inflation.
- Needed
- Written Labour/INATRO/INNOQ/insurer requirements and adopted editions
- Decision Effect
- Blocks repair launch.
- Needed
- Written classification, storage, carrier and recipient approvals
- Decision Effect
- Holds pack work.
- Needed
- Supported VIN list, utilisation, charging pattern, warranty and paid trial
- Decision Effect
- Blocks commercial continuation.
33
Complete linked source register
Every material quantitative claim is linked or explicitly labelled as an EVS assumption.
Complete linked source register
- Publisher
- Ministry of Mineral Resources and Energy (MIREME)
- Publication Date
- 2023-12-29
- Accessed At
- 2026-08-11
- Scope
- Official strategy: EV transition begins in 2030; 1% of private road transport and 5% of road freight to grid-powered EVs, rising to 10% and 25% in 2040 and 50% each in 2050. Charging rollout is to begin gradually before 2030.
- Href
- https://mireme.gov.mz/wp-content/uploads/2026/04/RESOLUCAO_61-2023_ESTRATEGIA_TRANSICAO_ENERGETICA1.pdf
- Publisher
- 360 Mozambique / Lusa
- Publication Date
- 2026-02-18
- Accessed At
- 2026-08-11
- Scope
- Secondary relay of INE: 1.32m total vehicles in 2024, including 897,273 light vehicles, 267,792 heavy vehicles, 16,158 tractors and 100,695 motorcycles; no propulsion split.
- Href
- https://360mozambique.com/business/ine-vehicle-fleet-grew-4-2-in-2024-surpassing-1-3-million-vehicles/
- Publisher
- Lusa / Aman Alliance
- Publication Date
- 2026-03-18
- Accessed At
- 2026-08-11
- Scope
- Official-data relay: vehicle imports US$259.5m in Jan–Sep 2025; 2024 parc 1.32m. Import value is flow, not EV stock.
- Href
- https://www.aman-alliance.org/Home/ContentDetail/101317
- Publisher
- INE Maputo City / INATRO
- Publication Date
- 2024-01-01
- Accessed At
- 2026-08-11
- Scope
- Mirror of official tables: Maputo City parc 546,526 in 2023 and 22,018 vehicles newly registered; no propulsion split. Use only as secondary mirror.
- Href
- https://pt.scribd.com/document/833328170/Publicacao-de-Acidentes-de-Viacao-2023
- Publisher
- International Monetary Fund
- Publication Date
- 2026-02-17
- Accessed At
- 2026-08-11
- Scope
- Primary macro evidence: real GDP growth 2.1% in 2024 and 0.5% in 2025; end-period inflation 3.2% in 2025; FX and debt constraints.
- Href
- https://www.imf.org/en/news/articles/2026/02/14/pr-26052-mozambique-imf-executive-board-concludes-2025-article-iv-consultation-with-mozambique
- Publisher
- International Monetary Fund
- Publication Date
- 2026-06-12
- Accessed At
- 2026-08-11
- Scope
- Primary current risk update: weak growth, FX shortages, fiscal/debt vulnerabilities and climate/fuel-price risks.
- Href
- https://www.imf.org/en/news/articles/2026/06/12/pr26199-mozambique-imf-staff-concludes-visit
- Publisher
- World Bank
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Primary current macro and security context; World Bank estimates 2025 contraction and highlights northern security and climate risks.
- Href
- https://www.worldbank.org/ext/en/country/mozambique
- Publisher
- World Bank
- Publication Date
- 2025-03-21
- Accessed At
- 2026-08-11
- Scope
- Primary project evidence: electricity access rose from 31% in 2018 to 60% in 2024 according to EDM; not an EV-charging coverage statistic.
- Href
- https://www.worldbank.org/en/news/press-release/2025/03/21/mozambique-afe-new-energy-project-to-bring-electricity-access-to-nearly-one-million-people
- Publisher
- EEP Africa
- Publication Date
- 2025-04-25
- Accessed At
- 2026-08-11
- Scope
- Funder-confirmed active pilot through October 2026: targets 59 electric motorbikes, 20 scooters, 30 three-wheelers and five swap stations. Targets are not deployed passenger-car stock.
- Href
- https://eepafrica.org/portfolio/81169/electricity-mobility-mozambique
- Publisher
- Subnational Climate Fund
- Publication Date
- 2026-05-25
- Accessed At
- 2026-08-11
- Scope
- Project evidence for rural three-wheel EVs and solar/battery swapping; no passenger-car stock count.
- Href
- https://www.subnational.finance/advancing-rural-electric-mobility-for-smallholder-agriculture-in-mozambique/
- Publisher
- Africa Press
- Publication Date
- 2025-09-08
- Accessed At
- 2026-08-11
- Scope
- Secondary relay of operator announcement: one 18m CRRC bus unveiled, with 10 additional buses planned. Charger ratings were published using erroneous kW/h notation; commissioning count and service status are unverified.
- Href
- https://www.africa-press.net/mozambique/all-news/metrobus-launches-mozambiques-first-electric-bus-fleet
- Publisher
- Club of Mozambique
- Publication Date
- 2025-09-03
- Accessed At
- 2026-08-11
- Scope
- Secondary corroboration of the same operator announcement; not independent deployment evidence.
- Href
- https://clubofmozambique.com/news/metrobus-powers-the-future-of-mobility-mozambiques-first-electric-bus-fleet-and-charging-network/
- Publisher
- Africa Press
- Publication Date
- 2024-06-25
- Accessed At
- 2026-08-11
- Scope
- Historical company/IFC plan for 300 buses. Later evidence shows only one bus unveiled in 2025; planned quantities are not counted.
- Href
- https://www.africa-press.net/mozambique/all-news/electric-buses-maputo-set-to-see-its-first-10-in-october
- Publisher
- Further Africa
- Publication Date
- 2025-03-06
- Accessed At
- 2026-08-11
- Scope
- Secondary procurement breakdown shows 150 CNG, 100 diesel medium, 100 rural mixed-use and 40 institutional buses; no electric buses. Prevents green-mobility misclassification.
- Href
- https://furtherafrica.com/2025/03/06/mozambique-adds-390-buses-to-public-transport-fleet-pushing-for-greener-mobility/
- Publisher
- 360 Mozambique
- Publication Date
- 2025-12-16
- Accessed At
- 2026-08-11
- Scope
- Secondary relay of final parliamentary approval: customs duty for vehicles powered solely by electricity reduced from 20% to zero. Obtain current tariff-code ruling.
- Href
- https://360mozambique.com/business/20-import-duty-on-electric-vehicles-removed/
- Publisher
- Africa Press
- Publication Date
- 2025-12-16
- Accessed At
- 2026-08-11
- Scope
- Secondary corroboration of duty exemption for solely electric vehicles; not evidence of VAT or hybrid treatment.
- Href
- https://www.africa-press.net/mozambique/all-news/mozambique-exempts-electric-vehicle-imports-from-duties
- Publisher
- 360 Mozambique
- Publication Date
- 2025-11-01
- Accessed At
- 2026-08-11
- Scope
- Reports a draft specific-consumption-tax measure including electric/hybrid vehicles. Treat as proposal unless final gazette and tariff schedule are obtained.
- Href
- https://360mozambique.com/development/sustainability/executive-proposes-tax-cuts-for-electric-vehicles-starting-in-2026/
- Publisher
- Ministry of Economy and Finance
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official reform register: VAT reduction, selected electrification exemptions and urban-transport tax measure; eligibility is activity-specific.
- Href
- https://pae.gov.mz/language/en/measures/
- Publisher
- Ministry of Economy and Finance
- Publication Date
- 2022-12-01
- Accessed At
- 2026-08-11
- Scope
- Official reform communication: standard VAT reduced from 17% to 16%; urban-transport IRPC reduction is not automatically applicable to an EV workshop.
- Href
- https://pae.gov.mz/language/en/mozambique-reduces-vat-and-exempt-agriculture-and-electrification/
- Publisher
- PwC
- Publication Date
- 2026-03-04
- Accessed At
- 2026-08-11
- Scope
- Professional current summary: standard resident corporate income tax 32%. Obtain Mozambican tax advice.
- Href
- https://taxsummaries.pwc.com/mozambique/corporate/taxes-on-corporate-income
- Publisher
- PwC
- Publication Date
- 2026-03-04
- Accessed At
- 2026-08-11
- Scope
- Professional current summary: standard VAT 16%; treatment depends on registration and supplies.
- Href
- https://taxsummaries.pwc.com/mozambique/corporate/other-taxes
- Publisher
- KPMG
- Publication Date
- 2026-01-07
- Accessed At
- 2026-08-11
- Scope
- Professional summary of laws published 29 December 2025 and effective 1 January 2026; current advice required.
- Href
- https://kpmg.com/us/en/taxnewsflash/news/2026/01/tnf-mozambique-amendments-to-vat-corporate-and-individual-income-tax-excise-tax-and-customs-laws.html
- Publisher
- ABCC
- Publication Date
- 2023-07-19
- Accessed At
- 2026-08-11
- Scope
- Law-firm summary: new investment law effective September 2023 and potentially eligible guarantees/incentives; approval is not automatic.
- Href
- https://www.abcc.co.mz/en/highlights/Investment-Law/328/
- Publisher
- PLMJ
- Publication Date
- 2023-07-18
- Accessed At
- 2026-08-11
- Scope
- Independent legal summary of Law 8/2023; confirm regulations and eligibility with APIEX/local counsel.
- Href
- https://www.plmj.com/pt/conhecimento/notas-informativas/Mocambique-Nova-Lei-de-Investimento-Privado/32782/
- Publisher
- APIEX
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official investment-promotion route; obtain project-specific approval and incentive certificate.
- Href
- https://apiex.gov.mz/
- Publisher
- INATRO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official registration route requiring customs-clearance and inspection documents.
- Href
- https://www.inatro.gov.mz/?page_id=1102
- Publisher
- INATRO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official repository for Road Code, technical inspection, automotive transport and dangerous-goods instruments.
- Href
- https://www.inatro.gov.mz/?page_id=701
- Publisher
- INATRO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official delegation network; relevant to Maputo/Matola, Beira, Nampula, Tete and other provincial workflows.
- Href
- https://www.inatro.gov.mz/?page_id=972
- Publisher
- National Social Security Institute (INSS)
- Publication Date
- 2023-08-25
- Accessed At
- 2026-08-11
- Scope
- Official download of current Labour Law; effective February 2024. Obtain employer, OSH and foreign-worker advice.
- Href
- https://www.inss.gov.mz/sdm_downloads/20320/
- Publisher
- Netherlands Commission for Environmental Assessment
- Publication Date
- 2025-01-01
- Accessed At
- 2026-08-11
- Scope
- Authoritative legal overview: Decree 54/2015 screening and A+/A/B/C categories; all potentially impactful activities require screening.
- Href
- https://www.eia.nl/en/countries/mozambique/legislation-at-project-level/
- Publisher
- GEF Mozambique / SIBMOZ
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Government-linked legal repository for Environmental Law 20/1997 and EIA Decree 54/2015.
- Href
- https://sibmoz.gov.mz/legal-framework/
- Publisher
- Imprensa Nacional de Moçambique
- Publication Date
- 2014-12-31
- Accessed At
- 2026-08-11
- Scope
- Official gazette index for hazardous-waste management regulation and annexes.
- Href
- https://www.inm.gov.mz/pt-br/content/conselho-de-ministros-suplemento-n%C2%BA-11-de-311214-pag-1940-43-76-br-n%C2%BA-105-boletim-da
- Publisher
- Intertek
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Government-contracted inspection information: all imported used vehicles require origin PSI under Ministerial Diploma 244/2011; uninspected arrivals face destination inspection and penalty.
- Href
- https://www.intertek.com.co/gobierno-comercio-exterior/programa-evaluacion-conformidad/inspeccion-pre-embarque-para-la-exportacion-a-mozambique/
- Publisher
- Intertek
- Publication Date
- 2025-07-01
- Accessed At
- 2026-08-11
- Scope
- Conformity-assessment programme requires CoC for regulated products from 27 June 2025; verify EV/parts/EVSE scope with INNOQ and Customs.
- Href
- https://www.intertek.com/news/2025/intertek-ready-to-support-with-mozambiques-mandatory-import-requirements/
- Publisher
- Energy Regulatory Authority (ARENE)
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official energy-regulator route. Published tariff table may be stale; obtain premises-specific current tariff, load and connection quote.
- Href
- https://arene.org.mz/
- Publisher
- EDM
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Distribution utility route for service capacity, earthing, protection, metering, tariff and outages.
- Href
- https://www.edm.co.mz/
- Publisher
- UN Economic Commission for Africa
- Publication Date
- 2025-12-05
- Accessed At
- 2026-08-11
- Scope
- Authoritative policy-development evidence; policy validation is not a comprehensive enacted data-protection law.
- Href
- https://uneca.org/stories/mozambique-validates-landmark-data-governance-policy
- Publisher
- Afriwise
- Publication Date
- 2025-05-15
- Accessed At
- 2026-08-11
- Scope
- Legal-intelligence summary: no dedicated comprehensive law at publication; bill was draft. Constitution, Labour Law, Penal Code and Electronic Transactions Law still apply.
- Href
- https://www.afriwise.com/blog/mozambique-releases-draft-personal-data-protection-law
- Publisher
- Toyota Mozambique / CFAO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official OEM-backed dealership and aftersales footprint; no EV registration or HV-capability claim.
- Href
- https://www.toyota.co.mz/pt/concessao/toyota-mocambique/cfao-motors-mozambique-maputo
- Publisher
- Ford Mozambique
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official dealer/repair network in Maputo, Nampula, Beira, Tete, Chimoio and other cities; no passenger-EV capability claim.
- Href
- https://ford.co.mz/locate-a-dealer/
- Publisher
- Chery Mozambique
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official Maputo dealer context; no audited EV sales or service capability.
- Href
- https://chery.co.mz/en/locate-a-dealer/
- Publisher
- Global Alliance Seguros
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Insurer-published Maputo/Matola workshop list; useful partner long-list, not an EV/HV audit.
- Href
- https://www.ga.co.mz/sinistros/sinistro-automovel/oficinas/
- Publisher
- Shell Mozambique
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Operator workshop network context; conventional service list, not EV capability.
- Href
- https://www.shell.co.mz/en_mz/motorists/oil-change-center.html
- Publisher
- World Bank
- Publication Date
- 2025-01-30
- Accessed At
- 2026-08-11
- Scope
- Explains active-status and data-quality controls needed before treating registration records as stock; not Mozambique market data.
- Href
- https://blogs.worldbank.org/en/transport/vehicle-information-management-systems
- Publisher
- ISO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International HV safety benchmark; confirm adopted edition/status with INNOQ and insurer.
- Href
- https://www.iso.org/standard/45477.html
- Publisher
- ISO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International conductive-charging benchmark; local electrical approvals control.
- Href
- https://www.iso.org/standard/68474.html
- Publisher
- IEC
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International EVSE benchmark; not proof of Mozambican adoption.
- Href
- https://webstore.iec.ch/en/publication/33644
- Publisher
- UNECE
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- UN 38.3 lithium-battery transport testing context; national, carrier and recipient permissions still apply.
- Href
- https://unece.org/transport/dangerous-goods/rev8-files
- Publisher
- Basel Convention Secretariat
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Transboundary hazardous-waste controls; verify competent authority, classification and prior consent for traction batteries.
- Href
- https://www.basel.int/TheConvention/Overview/tabid/1271/Default.aspx
- Publisher
- International Labour Organization
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International OSH-management benchmark; national labour/inspectorate requirements control.
- Href
- https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Rows retain individual bracketed source identifiers.
- Href
- EVS://Mozambique/mixed-source-evidence
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Internal planning assumptions and calculations; not sourced market facts.
- Href
- EVS://Mozambique/market-entry-model
34
Validation register
Evidence, assumptions and operational implications are separated below.
Validation register
- Status
- Pass
- Detail
- Generated and reparsed.
- Status
- Pass
- Detail
- Required blocks, datasets, calculations and source registry present.
- Status
- Pass
- Detail
- Policy-share sensitivities, gate SAM and annual/90-day economics recomputed.
- Status
- Pass
- Detail
- Active plug-ins, all-powertrain parc, future targets, buses, motorcycles, swap stations and passenger EVSE remain separate.
- Status
- Pass
- Detail
- EVS Green #5BCC12, Silver #A7B3BB, black/charcoal, white/light grey and Inter; no blue.
- Status
- Pass
- Detail
- Current national TAM null, executable SOM zero and hard gates explicit.
35
EVS Board Position
CONDITIONAL GO for evidence-gated diligence and scheduled Greater Maputo–Matola partner-clinic days; NO-GO standalone/franchise; HOLD traction-pack work.
Method / Sources and confidence
Where every figure
comes from.
Registrations, charging and legal requirements are read from primary sources. Where no official dataset exists, the model and its assumptions are published instead of a single unexplained number. This report is a dated snapshot: August 2026.
- 01Resolution 61/2023 — Just Energy Transition Strategy
- 02INE: Vehicle Fleet Grew 4.2% in 2024, Surpassing 1.3 Million Vehicles
- 03Mozambique: Vehicle imports worth US$1m per day by end-Q3 2025
- 04Maputo road-accident and vehicle statistics 2023
- 05IMF Executive Board Concludes 2025 Article IV Consultation with Mozambique
- 06IMF Staff Concludes Visit to Mozambique
- 07Mozambique Overview
- 08New Energy Project to Bring Electricity Access to Nearly One Million People
- 09Epsilon Mobilidade — Electric Mobility Mozambique
- 10Advancing Rural Electric Mobility for Smallholder Agriculture
- 11MetroBus Launches Mozambique’s First Electric Bus Fleet
- 12MetroBus powers the future of mobility
- 13Electric buses: Maputo set to see its first 10 in October
- 14Mozambique adds 390 buses to public transport fleet
- 1520% Import Duty on Electric Vehicles Removed
- 16Mozambique exempts electric vehicle imports from duties
- 17Executive proposes tax cuts for electric vehicles starting in 2026
- 18Economic Acceleration Package — Measures
- 19Mozambique reduces VAT and exempts agriculture and electrification
- 20Mozambique — Taxes on corporate income
- 21Mozambique — Other taxes
- 22Mozambique: 2026 tax-law amendments
- 23Mozambique Investment Law — Law 8/2023
- 24Mozambique New Private Investment Law
- 25APIEX Investment and Export Promotion Agency
- 26Vehicle registration requirements
- 27Road-transport legislation repository
- 28Provincial delegations
- 29Labour Law No. 13/2023
- 30Mozambique environmental-assessment framework
- 31Mozambique environmental legal framework
- 32Decree 83/2014 — Hazardous Waste Management Regulation
- 33Pre-shipment inspection for exports to Mozambique
- 34Intertek ready to support Mozambique mandatory import requirements
- 35ARENE energy tariffs and regulation
- 36Electricidade de Moçambique
- 37Mozambique validates National Data Governance Policy
- 38Mozambique releases draft personal-data-protection law
- 39CFAO Mobility Mozambique — Maputo
- 40Ford Mozambique dealer network
- 41Chery Mozambique dealer location
- 42Approved automotive workshops
- 43Oil Change Center workshop list
- 44Why Vehicle Information Management Systems Are Crucial
- 45ISO 6469 electrified road-vehicle safety
- 46ISO 17409 conductive power transfer
- 47IEC 61851-1 conductive charging system
- 48UN Manual of Tests and Criteria
- 49Basel Convention overview
- 50ILO-OSH 2001 guidelines
- 51Mozambique mixed-source evidence tables
- 52EVS Mozambique decision-gate and pilot model
Reports are commercial research, not legal, tax or investment advice.
Get the full Mozambique report
The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.
Other markets in Africa.
Compare these markets04 / Not in your country yet?
Bring EVS
to your market.
Tell us your territory. We'll send the market research alongside the franchise pack and connect you with the team behind every EVS centre.