Market IntelligenceAfrica

Senegal

EVS Senegal EV Service Centre Market Entry

Decision-grade Senegal assessment separating passenger/light-commercial plug-in data gaps, captive electric buses, hybrid taxis, electric-taxi procurement, policy targets, announced chargers and EVS assumptions.

Snapshot: 11 August 202636-page full report
Talk to the expansion team
Passenger plug-in stock

No current authoritative passenger BEV/PHEV stock series located.

Electric buses
121

Captive BRT concession fleet; not open passenger aftermarket.

Authoritative public connectors

No audited national public connector census located.

Gate SAM jobs/year
324

Only after 500 separated active Greater Dakar passenger/light-commercial plug-ins.

Base simple payback
3.488

Partner-clinic assumption on XOF30m reversible capex.

Executive summary

The verdict in full

Evidence, assumptions and operational implications are separated below.

Market headline

Evidence, assumptions and operational implications are separated below.

Market headline

Current passenger BEV/PHEV stock
Value
Unit
vehicles
Period
Current
Status
No authoritative separated registration series located.
Captive electric BRT buses
Value
121
Unit
buses
Period
2024–2026
Status
Operating concession fleet; excluded from passenger/light-commercial TAM [cetud_brt] [rts_brt].
Authoritative public connectors
Value
Unit
connectors
Period
Current
Status
No national connector/power/access/uptime census located.
Gate-planning SAM
Value
324
Unit
jobs/year
Period
EVS model
Status
Activates only after 500 separated active Greater Dakar passenger/light-commercial BEV/PHEVs.

Source: EVS Senegal decision-gate and pilot model

Market size and vehicle parc context

No current authoritative passenger/light-commercial plug-in denominator was located. Captive buses, hybrid taxis and electric-taxi procurement are kept out of TAM.

Market size and vehicle parc context

Current passenger/light-commercial BEV/PHEV stock
Value
Unit
vehicles
Period
Current
Scope
No authoritative active registration extract located.
Electric articulated BRT fleet
Value
121
Unit
buses
Period
Current
Scope
Captive heavy fleet, maintained by Dakar Mobilité; excluded from EVS passenger pool [cetud_brt] [sunubrt_121].
Electric taxis received in China
Value
100
Unit
vehicles
Period
May 2026
Scope
Procurement milestone within 1,000 programme; not assumed delivered, registered or operating in Senegal [rts_ev_taxis].
2030 EV ambition
Value
37,000
Unit
vehicles
Period
2030
Scope
Secondary ministry-attributed target; unclear vehicle-class scope [policy_2030].
Passenger/light-utility import age ceiling
Value
10
Unit
years
Period
From 24 October 2025 decree
Scope
All powertrains; not EV stock [rts_import_age].

Source: EVS Senegal decision-gate and pilot model

BEV/PHEV sales, stock and adoption history

No annual passenger BEV/PHEV sales or active-stock series was found. Events shown are ecosystem milestones, not a registration history.

EV ecosystem milestones kept outside passenger TAM

Captive buses, taxi pipeline and hybrid programme are definition-separated.

0
121
100
37,000
10
Current passenger/light-commercial BEV/PHEV stock
Electric articulated BRT fleet
Electric taxis received in China
2030 EV ambition
Passenger/light-utility import age ceiling

BEV/PHEV sales, stock and adoption history

2023
Passenger Bev Sales
Passenger Phev Sales
Active Passenger Bev Phev
Other Evidence
121 BRT buses received/project fleet; captive heavy class [cetud_121].
2024
Passenger Bev Sales
Passenger Phev Sales
Active Passenger Bev Phev
Other Evidence
BRT entered progressive commercial service; BYD/LOXEA market entry announced [rts_brt] [cfao_byd].
2025
Passenger Bev Sales
Passenger Phev Sales
Active Passenger Bev Phev
Other Evidence
Separate 1,000 hybrid-taxi programme; not classified as PHEV [rts_hybrid_taxis].
2026
Passenger Bev Sales
Passenger Phev Sales
Active Passenger Bev Phev
Other Evidence
First 100 electric taxis received in China, not proven active Senegal stock [rts_ev_taxis].

Source: EVS Senegal decision-gate and pilot model

Definition reconciliation

Evidence, assumptions and operational implications are separated below.

Definition reconciliation

Passenger/light-commercial BEV/PHEV sales and active stock
Treatment
Null
Reason
No authoritative annual or active-status series located.
121 BRT buses
Treatment
Separate captive heavy fleet
Reason
Concession maintenance and duty cycle are not open passenger-car aftermarket [cetud_brt] [sunubrt_121].
100 electric taxis received in China
Treatment
Pipeline only
Reason
Receipt abroad does not establish customs clearance, registration or operation in Senegal [rts_ev_taxis].
1,000 hybrid taxis
Treatment
Excluded
Reason
HEV/PHEV split not disclosed [rts_hybrid_taxis].
37,000 EVs / 15% by 2030
Treatment
Target-realisation sensitivity only
Reason
Scope/baseline unclear and source is ministry-attributed secondary reporting [policy_2030].
Two announced chargers
Treatment
Diligence leads
Reason
Site, connector count, power, public access and uptime require field verification [cfao_byd].
23 solar-powered BRT stations
Treatment
Passenger stations, not public charging points
Reason
No evidence that each station is vehicle EVSE [cetud_brt].

Source: EVS Senegal decision-gate and pilot model

Get the full Senegal analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

Cautious / base / high adoption cases

These are target-realisation sensitivities against a ministry-attributed 2030 ambition, not EVS forecasts of current stock.

2030 policy-target realisation sensitivities

EVS cases; not current-stock forecasts.

Cautious9,250
Base18,500
HighBase case37,000

Source: 1 000 taxis électriques made in China pour transformer la mobilité urbaine

Cautious / base / high adoption cases

Cautious
Target Realisation Pct
25
Vehicles 2030
9,250
Interpretation
25% of the stated 37,000 policy ambition; not a stock forecast and scope remains uncertain [policy_2030].
Base
Target Realisation Pct
50
Vehicles 2030
18,500
Interpretation
50% target-realisation sensitivity; not used for premises approval.
High
Target Realisation Pct
100
Vehicles 2030
37,000
Interpretation
Full policy ambition; stress case only, not EVS forecast.

Source: EVS Senegal decision-gate and pilot model

Charging infrastructure

No authoritative public connector census was found. Two announced charger locations are diligence leads only.

Charging infrastructure

Authoritative national public connectors
Value
Unit
connectors
Evidence
No auditable connector/power/access/uptime census located.
CFAO/TotalEnergies announced chargers
Value
2
Unit
charger sites/units announced
Evidence
One at BYD showroom Ngor Almadies and one at TotalEnergies motorway station; operationality and connector count require audit [cfao_byd].
BRT passenger stations
Value
23
Unit
stations
Evidence
Solar-powered passenger stations; not counted as public vehicle EVSE [cetud_brt].
2024 Senelec SAIDI
Value
6.673
Unit
hours/customer/year
Evidence
National average equivalent to 6h40m22s; not feeder/site guarantee [crse_stats].
Site electricity tariff
Value
Unit
XOF/kWh plus charges
Evidence
Obtain current professional category and subscribed-power quote [crse_tariff].

Source: EVS Senegal decision-gate and pilot model

Vehicle parc age and service demand

Evidence, assumptions and operational implications are separated below.

Vehicle parc age and service demand

Passenger plug-ins by age, warranty and location
Value
Unit
vehicles
Implication
No service-demand denominator; matched registry extract required.
Passenger/light-utility import age ceiling
Value
10
Unit
years
Implication
Used inflow can support chassis/12V/charging work, but EV share is unknown [rts_import_age].
BRT fleet
Value
121
Unit
buses
Implication
Specialist captive contract opportunity only; exclude from Phase 1 [sunubrt_121].
Electric-taxi pipeline
Value
100
Unit
vehicles received in China
Implication
Future fleet-service lead; do not count until active registry/contract proof [rts_ev_taxis].

Source: EVS Senegal decision-gate and pilot model

EVS assumptions

Evidence, assumptions and operational implications are separated below.

EVS assumptions

Greater Dakar launch threshold
Value
500
Unit
registered active passenger/light-commercial BEV/PHEV
Basis
EVS density gate, not estimate.
Active/available factor
Value
0.9
Unit
share
Basis
EVS planning haircut after registry proof.
Independent reach
Value
0.6
Unit
share
Basis
EVS assumption after captive, warranty and unsupported-VIN screening.
Service events
Value
1.2
Unit
jobs/vehicle/year
Basis
EVS blended diagnostic/chassis assumption.
Average repair order
Value
250,000
Unit
XOF/job
Basis
Replace with paid Senegal observations.
Reversible capex ceiling
Value
30,000,000
Unit
XOF
Basis
EVS board gate.
Executable SOM before gates
Value
0
Unit
jobs
Basis
Deliberately zero.

Source: EVS Senegal decision-gate and pilot model

Get the full Senegal analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

Transparent TAM / SAM / SOM

National passenger TAM is deliberately null and executable SOM is zero. The quantified Greater Dakar opportunity activates only after a matched registry gate.

Transparent TAM / SAM / SOM

National passenger/light-commercial plug-in TAM
Vehicles
Jobs Per Year
Revenue Xof
Status
Not quantified: current active BEV/PHEV denominator unavailable.
Captive electric-bus ecosystem
Vehicles
121
Jobs Per Year
Revenue Xof
Status
Separate heavy fleet, not open aftermarket [cetud_brt].
Greater Dakar gate SAM
Vehicles
270
Jobs Per Year
324
Revenue Xof
81,000,000
Status
500 separated registrations × 90% active × 60% reach × 1.20 events.
1 more row in the full report

Source: EVS Senegal decision-gate and pilot model

Customer and fleet segments

Evidence, assumptions and operational implications are separated below.

Customer and fleet segments

Private early adopters and used imports
Need
Pre-purchase report, scan, charging, 12V and chassis evidence
Priority
High only for supported VINs.
Electric taxi and ride-hailing fleets
Need
Uptime inspections, tyres/brakes/charging and audit trail
Priority
High after active-fleet proof and paid trial [rts_ev_taxis].
Corporate, rental and hospitality fleets
Need
Route/charging readiness and condition reporting
Priority
High through paid fleet trial.
BRT and heavy e-bus concession
Need
Specialist depot/contract support
Priority
Excluded from Phase 1; partnership-only [sunubrt_121].
Electric two/three-wheelers
Need
Different tools, parts and battery logistics
Priority
Separate future workstream; excluded from passenger TAM.
Public/municipal fleets
Need
Tender-compliant evidence and uptime SLAs
Priority
Contract only.

Source: EVS Senegal decision-gate and pilot model

Leading EV brands and models

Evidence, assumptions and operational implications are separated below.

Leading EV brands and models

BYD
Model
Passenger range via LOXEA
Powertrain
BEV/PHEV by VIN
Signal
Official sales/rental, service, maintenance and parts; no volume disclosed [cfao_byd].
BYD
Model
Atto 2
Powertrain
BEV
Signal
Commercial Dakar fleet use; not a market-share ranking [dakar_fleet].
BYD
Model
Dolphin
Powertrain
BEV
Signal
Commercial Dakar fleet use; no fleet size disclosed [dakar_fleet].
BRT supplier fleet
Model
Articulated electric bus
Powertrain
BEV heavy bus
Signal
121 captive units; separate equipment/contract [cetud_121].
Mixed used imports
Model
Unranked BEV/PHEV models
Powertrain
VIN-specific
Signal
No authoritative model registration ranking located.

Source: EVS Senegal decision-gate and pilot model

Independent and OEM competitors

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Independent and OEM competitors

LOXEA / CFAO / BYD Senegal
Type
OEM-backed sales, lease, service, parts and charging
Footprint
Hann Bel Air, Ngor/Virage, Thiès/AIBD
Threat
High for warranty vehicles
Response
Out-of-warranty/referral/overflow scope only [cfao_byd] [loxea_network].
Dakar Mobilité / SunuBRT depot system
Type
Captive concession maintenance
Footprint
BRT corridor/depot
Threat
Not open aftermarket
Response
Contract or supplier partnership only [sunubrt_121].
4 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

Priority cities and regions

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Priority cities and regions

1
Region
Greater Dakar: Ngor/Almadies–Hann–Diamniadio/AIBD
Rationale
Only evidenced OEM/lease, fleet and infrastructure corridor; EV density still unverified [cfao_byd] [loxea_network].
Mode
Only candidate for scheduled partner clinic.
4 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

Consumer incentives and policy

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Consumer incentives and policy

EV purchase grant
Status
No current official national cash grant verified
Action
Assume zero.
EV-specific customs/VAT exemption
Status
No official general exemption verified
Action
Use written HS valuation/ruling; general customs table controls [customs_rates] [customs_exemption].
3 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

Business, tax and investment incentives

No EV-specific exemption, grant or investment benefit is assumed. Written current rulings control.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Business, tax and investment incentives

Standard VAT
Rate
18% general rate in official customs calculations
Treatment
Economics VAT-exclusive; obtain DGID advice for services/parts and recovery [customs_rates].
Corporate income tax
Rate
Current CGI rate not hard-coded in model
Treatment
Pre-tax model; written DGID adviser memo required [dgid_is].
3 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

Labour, licensing and workshop regulation

Every material approval is a launch gate; this is not legal, tax, engineering or insurance advice.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Labour, licensing and workshop regulation

Entity, NINEA, tax and payroll
Authority
APIX/BCE, DGID, labour/social-security bodies
Evidence
Company/RCCM, NINEA, tax account, payroll registrations and compliant importer status [business_48h] [dgid_is] [pcf].
Premises, zoning, construction, signage and fire
Authority
Municipality / civil protection
Evidence
Written workshop use and any building/occupancy/fire approvals [building_permit].
5 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

High-voltage controls

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

High-voltage controls

VIN/powertrain whitelist
Evidence
Classify BEV, PHEV, HEV, MHEV, buses and conversions before booking.
Task-specific authorisation
Evidence
Named technician, competence assessment, scope, expiry and supervision.
Safe de-energisation
Evidence
OEM procedure, lock/tag, proved tester and absence-of-voltage record [iso_6469].
Controlled work zone
Evidence
Barriers, insulated PPE/tools, rescue equipment and no lone HV work [ilo_osh].
Charging interface
Evidence
Licensed electrical work; IEC 61851/ISO 17409 as benchmarks only [iec_61851] [iso_17409].
Release evidence
Evidence
Pre/post scan, restoration, torque/QC, limitations and customer sign-off.

Source: EVS Senegal decision-gate and pilot model

Battery and waste controls

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Battery and waste controls

Intact in-vehicle traction pack
Rule
Non-invasive diagnostics only
Route
No opening, removal or storage.
Suspect/damaged pack arrival
Rule
Refuse routine indoor custody
Route
Emergency/OEM/insurer and DEEC plan.
3 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

Franchise and operating model

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Franchise and operating model

Format
Recommendation
Scheduled clinic days in one compliant Greater Dakar partner workshop.
Ownership
Recommendation
Senegal entity or joint venture with verified registrations and accountable local operator.
Territory/franchise
Recommendation
No franchise sale or exclusivity before 12 months of paid evidence.
Staffing
Recommendation
One assessed HV lead plus one technician; shared reception and licensed electrical/waste partners.
Technology
Recommendation
Supported VIN/task matrix, lawful service information and evidence-grade job files.
Commercial
Recommendation
XOF menu pricing, deposits and paid fleet trials; no free diagnostic demand proxy.
Expansion
Recommendation
Thiès/AIBD or Saly collection days only after Dakar continuation gate.

Source: EVS Senegal decision-gate and pilot model

Pilot steady-state economics

All volumes, prices, margins, costs and capex are EVS assumptions in nominal XOF, VAT-exclusive and pre-tax.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Pilot steady-state economics

Cautious
Jobs
45
Aro Xof
200,000
Gross Margin Pct
55
Opex Xof
7,000,000
Revenue Xof
9,000,000
Gross Profit Xof
4,950,000
Ebitda Xof
-2,050,000
Payback Years
2 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

90-day pilot economics

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

90-day pilot economics

Cautious
Jobs 90d
12
Aro Xof
200,000
Gross Margin Pct
55
Opex Xof
1,750,000
Revenue Xof
2,400,000
Gross Profit Xof
1,320,000
Ebitda Xof
-430,000
2 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

Risks and mitigations

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Risks and mitigations

Passenger BEV/PHEV denominator unavailable
Likelihood
High
Impact
High
Mitigation
Matched road-transport/customs extract; TAM stays null.
BRT buses mixed into passenger aftermarket
Likelihood
High
Impact
High
Mitigation
Separate heavy captive class and contract economics.
Taxi pipeline mistaken for active stock
Likelihood
High
Impact
High
Mitigation
Count only customs-cleared, registered, active Greater Dakar VINs.
Hybrids mistaken for PHEVs
Likelihood
High
Impact
High
Mitigation
VIN-level propulsion classification.
Policy target treated as forecast
Likelihood
High
Impact
High
Mitigation
Target-realisation cases only; not used for capex.
Announced sites mistaken for connectors/uptime
Likelihood
High
Impact
Medium
Mitigation
Physical connector, power, access and uptime audit.
Feeder capacity/outage risk
Likelihood
Medium
Impact
High
Mitigation
Load/earthing study, tariff quote, backup and controlled charging.
OEM software, warranty and parts access
Likelihood
High
Impact
High
Mitigation
Supported VIN/task matrix, LOXEA/OEM referral and parts SLAs.
Battery fire or electric shock
Likelihood
Low
Impact
Critical
Mitigation
No pack work; isolation SOP, rescue gear and drills.
Waste route failure
Likelihood
Medium
Impact
Critical
Mitigation
No battery custody before written DEEC route.
Tax/customs/incentive interpretation
Likelihood
Medium
Impact
High
Mitigation
Written DGID/Douanes/APIX advice; assume no special benefit.
Paid demand below partner-clinic threshold
Likelihood
High
Impact
High
Mitigation
Deposits, paid fleet trial and day-90 stop.

Source: EVS Senegal decision-gate and pilot model

90-day entry plan

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

90-day entry plan

0–15
Objective
Registry and legal gate
Actions
Obtain matched road-transport/customs extract by propulsion, class, age, owner, location and active status; map entity, ICPE, fire, electricity, waste, data and insurance.
Owner
EVS board / Senegal counsel
Deliverable
Definition and compliance file.
4 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

Explicit go / no-go gates

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Explicit go / no-go gates

Market denominator
Go
Matched extract proves at least 500 registered active passenger/light-commercial BEVs/PHEVs in Greater Dakar, separately identified
No Go
Classes/status/location cannot be separated or count is below 500.
5 more rows in the full report

Source: EVS Senegal decision-gate and pilot model

Methodology

Evidence, assumptions and operational implications are separated below.

Greater Dakar partner-clinic EBITDA

XOF; EVS steady-state assumptions.

Cautious-2.05m
Base8.6m
HighBase case18.9m

Source: EVS Senegal decision-gate and pilot model

Methodology

1. Evidence hierarchy
Method
Primary Senegal authorities and project operators first; attributed/secondary figures explicitly labelled.
2. Definition control
Method
Separate passenger BEV/PHEV, captive buses, hybrid taxis, taxi pipeline, policy target and charger announcements.
3. Market denominator
Method
Leave national passenger TAM null until matched active-registration extract.
4. Forecasts
Method
25%/50%/100% realisation of the ministry-attributed 37,000 target; not current-stock forecasts.
5. Gate SAM
Method
500 Greater Dakar plug-ins × 90% active × 60% reach × 1.20 events.
6. SOM
Method
Zero before hard gates.
7. Economics
Method
Nominal XOF, VAT-exclusive EVS assumptions; annual volumes remain below gate SAM.
8. Regulation
Method
No incentive, permit or technical standard assumed without current written authority confirmation.
9. Validation
Method
JSON, schema, formulas, citations, links, branding, definitions and template residue.

Source: EVS Senegal decision-gate and pilot model

Complete linked source register

Every material number is linked to a source or explicitly labelled as an EVS assumption.

Complete linked source register

cetud_brt
Publisher
Conseil exécutif des Transports urbains durables (CETUD)
Publication Date
Accessed At
2026-08-11
Scope
Official project page: 18 km, 23 solar-powered passenger stations and 121 articulated 100% electric buses. Stations are not counted as public EV charging sites.
Href
https://cetud.sn/reseaux-de-transport/bus-regional-transit-brt/
cetud_121
Publisher
CETUD
Publication Date
2024-02-17
Accessed At
2026-08-11
Scope
Official receipt of 121 articulated electric BRT buses; 158 planned at ramp-up. Captive heavy fleet, excluded from passenger/light-commercial service pool.
Href
https://cetud.sn/reception-de-121-bus-articules/
sunubrt_121
Publisher
SunuBRT
Publication Date
2023-10-20
Accessed At
2026-08-11
Scope
Operator project evidence: 121 buses, stated 250 km range and Dakar Mobilité maintenance responsibility.
Href
https://www.sunubrt.sn/reception-de-la-flotte-des-121-bus-articules-brt-100-electriques/
rts_brt
Publisher
RTS
Publication Date
2024-05-15
Accessed At
2026-08-11
Scope
State broadcaster confirms progressive commercial service; 14 of 23 passenger stations at launch.
Href
https://www.rts.sn/actualite/detail/a-la-une/transports-publics-le-brt-officiellment-mis-en-service
eeas_brt
Publisher
European External Action Service
Publication Date
Accessed At
2026-08-11
Scope
Financing evidence: 121 buses; €85.4m loans, a separate €6.4m battery-replacement facility after eight years, €7m EU grant and €9m technical assistance. Captive concession economics, not EVS TAM.
Href
https://www.eeas.europa.eu/delegations/senegal/dakar-mobilit%C3%A9-r%C3%A9unit-les-financements-du-tout-premier-syst%C3%A8me-de-bus-brt-100-%C3%A9lectrique-en-afrique_fr?s=117
rts_ev_taxis
Publisher
RTS
Publication Date
2026-05-18
Accessed At
2026-08-11
Scope
State broadcaster: first 100 electric taxis received in China within a 1,000-vehicle programme; chargers planned. Procurement/pipeline evidence, not proof of Senegal registration or operation.
Href
https://www.rts.sn/actualite/detail/transports/mobilite-urbaine-le-fdtt-mise-sur-1-000-taxis-electriques-pour-moderniser-le-transport
rts_hybrid_taxis
Publisher
RTS
Publication Date
2025-11-26
Accessed At
2026-08-11
Scope
Separate 1,000 hybrid-taxi programme; hybrid technology was not identified as PHEV and is excluded from plug-in stock.
Href
https://www.rts.sn/actualite/detail/a-la-une/modernisation-des-transports-publics-un-programme-de-1-000-taxis-hybrides-voit-le-jour
policy_2030
Publisher
La Tribune Afrique
Publication Date
2026-05-21
Accessed At
2026-08-11
Scope
Secondary ministry-attributed ambition: 37,000 EVs or 15% of fleet by 2030. Scope and baseline are not reconciled; treated as target, not official forecast.
Href
https://www.latribune.fr/article/afrique/6932301038119214/senegal-1-000-taxis-electriques-made-in-china-pour-transformer-la-mobilite-urbaine-mobilite-urbaine-au-senagal-la-solution-est-made-in-china
cfao_byd
Publisher
CFAO Group
Publication Date
2024-07-16
Accessed At
2026-08-11
Scope
Official commercial entry: BYD sale/rental, charger installation, solar generation, servicing, maintenance and parts; two chargers announced with TotalEnergies Senegal.
Href
https://www.cfaogroup.com/en/loxea-in-senegal-now-offers-electric-vehicles-from-the-byd-brand/
loxea_network
Publisher
LOXEA Senegal
Publication Date
Accessed At
2026-08-11
Scope
Official locations: Dakar/Hann Bel Air, Thiès/AIBD and BYD Senegal at Ngor Virage. Presence, not EV sales volume.
Href
https://senegal.loxea.com/en/loxea-network/
dakar_fleet
Publisher
Dakar Fleet
Publication Date
Accessed At
2026-08-11
Scope
Commercial evidence of BYD Atto 2 and Dolphin use; no auditable fleet size, so models are signals only.
Href
https://www.dakarfleet.com/en
ald_autoelec
Publisher
ALD Auto Elec
Publication Date
Accessed At
2026-08-11
Scope
Commercial independent hybrid/electrical specialist in Greater Dakar; capability and volume require audit.
Href
https://www.aldautoelec.com/
customs_rates
Publisher
Direction générale des Douanes du Sénégal
Publication Date
Accessed At
2026-08-11
Scope
Official general vehicle customs tables: duties, levies, 18% VAT and registration duty vary by new/used vehicle and route. No EV-specific exemption is inferred.
Href
https://www.douanes.sn/ndn103/
customs_cmc
Publisher
Direction générale des Douanes du Sénégal
Publication Date
Accessed At
2026-08-11
Scope
Official customs-release documentation route for imported vehicle registration.
Href
https://www.douanes.sn/request-a-certificate-of-release-for-home-use-cmc-of-an-imported-vehicle/
customs_exemption
Publisher
Direction générale des Douanes du Sénégal
Publication Date
Accessed At
2026-08-11
Scope
Exemption route requires qualifying convention, approval or ministerial instrument; ordinary clinic receives no assumed benefit.
Href
https://www.douanes.sn/demander-un-titre-dexoneration-pour-les-importations
rts_import_age
Publisher
RTS
Publication Date
2025-11-05
Accessed At
2026-08-11
Scope
Decree signed 24 October 2025: passenger/light utility import age ceiling raised from 8 to 10 years; heavy/passenger transport from 10 to 15 years.
Href
https://www.rts.sn/actualite/detail/transports/modernisation-du-parc-automobile-le-senegal-releve-la-limite-dage-des-vehicules-importes
ansd_trade
Publisher
Agence Nationale de la Statistique et de la Démographie
Publication Date
2025-07-22
Accessed At
2026-08-11
Scope
Official trade context: 2024 imports fell 0.6%; other land vehicles -28.4% and trucks/vans -15.9%. No propulsion or active-parc split.
Href
https://www.ansd.sn/Indicateur/note-danalyse-du-commerce-exterieur-nace
crse_tariff
Publisher
Commission de Régulation du Secteur de l’Énergie
Publication Date
Accessed At
2026-08-11
Scope
Official current tariff route. Site economics require exact supply category, subscribed power and demand charges.
Href
https://www.crse.sn/crse_document/grille-tarifaire-de-senelec-applicable-a-compter-du-1er-janvier-2026/
crse_stats
Publisher
Commission de Régulation du Secteur de l’Énergie
Publication Date
Accessed At
2026-08-11
Scope
Official 2024 figures include 7,464.88 GWh available, 6,770.18 GWh Senelec sales, 2,370,926 customers and SAIDI 6h40m22s; national system, not feeder guarantee.
Href
https://www.crse.sn/secteurs/secteur-electricite/
crse_autoproduction
Publisher
Commission de Régulation du Secteur de l’Énergie
Publication Date
Accessed At
2026-08-11
Scope
Official declaration/licence framework for self-generation and surplus injection; relevant to workshop solar/backup design.
Href
https://www.crse.sn/crse_document/decret-relatif-a-lactivite-dautoproduction-delectricite/
rts_capacity
Publisher
RTS
Publication Date
2026-05-03
Accessed At
2026-08-11
Scope
Minister-attributed system context: about 1,902 MW current capacity and more than 1,250 MW planned by 2027; not a site-capacity guarantee.
Href
https://www.rts.sn/actualite/detail/a-la-une/energie-plus-de-1-250-megawatts-supplementaires-attendus-dici-2027
rts_access
Publisher
RTS
Publication Date
2025-02-03
Accessed At
2026-08-11
Scope
State broadcaster: 65.67% rural electrification and about 86% national access; supports Dakar-first siting, not reliability claims.
Href
https://www.rts.sn/actualite/detail/a-la-une/acces-a-lelectricite-vers-une-acceleration-de-lelectrification-rurale-au-senegal
apix_main
Publisher
APIX-S.A.
Publication Date
Accessed At
2026-08-11
Scope
Official one-stop investor support and current investment-code documentation route.
Href
https://investinsenegal.sn/
apix_guichet
Publisher
APIX-S.A.
Publication Date
Accessed At
2026-08-11
Scope
Official incentive approval route; Code thresholds and sector eligibility vary. Workshop eligibility is not assumed.
Href
https://investinsenegal.sn/services/guichet-unique/
apix_faq
Publisher
APIX-S.A.
Publication Date
Accessed At
2026-08-11
Scope
Approval under investment regimes can provide customs/fiscal benefits; three-year approval validity stated. Benefits require application and approval.
Href
https://investinsenegal.sn/apix-s-a/faq/
business_48h
Publisher
Sénégal Services
Publication Date
Accessed At
2026-08-11
Scope
Official administrative reform context; registry/NINEA formation does not replace sector approvals.
Href
https://www.servicepublic.gouv.sn/actualite/creation-dentreprises-au-senegal-le-delai-passe-de-58-jours-a-48-heures
building_permit
Publisher
Sénégal Services
Publication Date
Accessed At
2026-08-11
Scope
Official municipal building-permit route for construction/adaptation.
Href
https://www.servicepublic.gouv.sn/demarche/demander-une-autorisation-de-construire-permis-de-construire
dgid_is
Publisher
Direction générale des Impôts et des Domaines
Publication Date
2026-02-06
Accessed At
2026-08-11
Scope
Official current corporate-tax compliance route; the report does not rely on this page for a rate.
Href
https://www.dgid.sn/2026/02/06/rappel-de-lecheance-de-paiement-du-premier-acompte-provisionnel-relatif-a-limpot-sur-les-societes-is-et-limpot-sur-le-revenu-ir/
pcf
Publisher
Direction générale des Impôts et des Domaines
Publication Date
Accessed At
2026-08-11
Scope
Official 12% import levy for non-compliant importers; compliant/registered importers may be exempt. Maintain tax compliance before importing tools/parts.
Href
https://pcf.dgid.sn/
icpe
Publisher
Sénégal Services
Publication Date
Accessed At
2026-08-11
Scope
Official DEEC ICPE authorisation/declaration route; classification must be confirmed before premises commitment.
Href
https://bo.senegalservices.sn/demarche/demander-lautorisation-dexploiter-une-installation-classee-pour-la-protection-de-lenvironnement
env_cert
Publisher
Sénégal Services
Publication Date
Accessed At
2026-08-11
Scope
Projects within ICPE/environmental-assessment schedules require DEEC screening; promoter bears assessment cost.
Href
https://bo.senegalservices.sn/demarche/demander-un-certificat-de-conformite-environnementale
battery_storage
Publisher
Sénégal Services
Publication Date
Accessed At
2026-08-11
Scope
Official DEEC route requires site plan and ICPE authorisation; stated 1–3 month period. No traction-battery custody at launch.
Href
https://senegalservices.sn/demarche/demander-une-autorisation-de-collecte-et-de-stockage-des-batteries-usagees
used_oil
Publisher
Sénégal Services
Publication Date
Accessed At
2026-08-11
Scope
Official route for used-oil elimination; authorisation does not replace ICPE approval.
Href
https://bo.senegalservices.sn/demarche/obtenir-un-agrement-pour-lelimination-des-huiles-usagees
environment_code
Publisher
État du Sénégal / Vie-Publique.sn
Publication Date
2023-08-02
Accessed At
2026-08-11
Scope
State legal text: pollution prevention, waste management, ICPE authorisation/declaration and environmental evaluation framework.
Href
https://www.vie-publique.sn/documents/10997/code-de-lenvironnement-du-senegal-loi-2023-15-du-02-aout-2023
labour_code
Publisher
Ministère du Travail
Publication Date
Accessed At
2026-08-11
Scope
Official Labour Code route; contracts, hours, employee representation and inspection obligations require local counsel.
Href
https://www.travail.gouv.sn/index.php/en/Connaitre_le_droit_du_travail_s%C3%A9n%C3%A9galais
osh_programme
Publisher
Ministère du Travail
Publication Date
Accessed At
2026-08-11
Scope
Official OSH programme and training/compliance context.
Href
https://travail.gouv.sn/en/S%C3%A9curit%C3%A9_%20_et_Sant%C3%A9_au_Travail_le_programme_national_valid%C3%A9
cdp
Publisher
CDP Sénégal
Publication Date
Accessed At
2026-08-11
Scope
Official personal-data regulator and formalities route.
Href
https://www.cdp.sn/
cdp_obligations
Publisher
CDP Sénégal
Publication Date
Accessed At
2026-08-11
Scope
Official duties include notice, access/opposition/rectification, confidentiality, security, retention and processor controls.
Href
https://www.cdp.sn/obligations-entreprises
asn
Publisher
Association Sénégalaise de Normalisation
Publication Date
Accessed At
2026-08-11
Scope
Official standards authority; confirms national electrotechnical and automotive standards portfolio. Obtain adopted editions in writing.
Href
https://www.asn.sn/fr/content/processus-d%E2%80%99%C3%A9laboration-des-normes
iso_6469
Publisher
ISO
Publication Date
Accessed At
2026-08-11
Scope
International HV safety benchmark; Senegal law and adopted standards control.
Href
https://www.iso.org/standard/45477.html
iso_17409
Publisher
ISO
Publication Date
Accessed At
2026-08-11
Scope
International conductive charging interface benchmark; not proof of Senegal adoption.
Href
https://www.iso.org/standard/68474.html
iec_61851
Publisher
IEC
Publication Date
Accessed At
2026-08-11
Scope
International EVSE benchmark; local utility, installer and authority approval required.
Href
https://webstore.iec.ch/en/publication/33644
un_tests
Publisher
UNECE
Publication Date
Accessed At
2026-08-11
Scope
UN 38.3 lithium-battery transport testing context.
Href
https://unece.org/transport/dangerous-goods/rev8-files
basel
Publisher
Basel Convention Secretariat
Publication Date
Accessed At
2026-08-11
Scope
Transboundary hazardous-waste controls; national DEEC permits and recipient-country rules also apply.
Href
https://www.basel.int/TheConvention/Overview/tabid/1271/Default.aspx
ilo_osh
Publisher
International Labour Organization
Publication Date
Accessed At
2026-08-11
Scope
OSH management benchmark; does not replace Senegal law.
Href
https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001
evs_model
Publisher
EVS Worldwide
Publication Date
2026-08-11
Accessed At
2026-08-11
Scope
Internal assumptions and calculations; no assumption is presented as sourced fact.
Href
EVS://Senegal/market-entry-model

Validation register

Evidence, assumptions and operational implications are separated below.

Validation register

JSON / UTF-8
Status
Pass
Detail
Generated and reparsed.
Schema
Status
Pass
Detail
Required blocks, datasets, calculations and source registry present.
Calculations
Status
Pass
Detail
Target cases, gate SAM and annual/90-day economics recomputed.
Definition control
Status
Pass
Detail
Passenger plug-ins, buses, hybrid taxis, electric-taxi pipeline, target and chargers remain separate.
Branding
Status
Pass
Detail
EVS Green #5BCC12, Silver #A7B3BB, charcoal/black, white/light grey and Inter; no blue.
Decision
Status
Pass
Detail
National TAM null, executable SOM zero and hard gates explicit.

Source: EVS Senegal decision-gate and pilot model

Get the full Senegal analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

EVS Board Position

CONDITIONAL GO for evidence-gated diligence and scheduled Greater Dakar partner-clinic days; NO-GO standalone/franchise; HOLD traction-pack work.

Source register

46 primary and derived sources

Show

Get the full Senegal report

The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.

We use your details only to send the report and follow up about EVS franchise opportunities.