Market IntelligenceAfrica

Zimbabwe

EVS Zimbabwe EV Service Centre Market Entry

Decision-grade Zimbabwe assessment separating stale registered-EV observations, unsplit hybrids, all-vehicle administrative counts, current passenger plug-in gaps, charging-site claims, fiscal measures and EVS assumptions.

Snapshot: 11 August 202634-page full report
Talk to the expansion team
Historic EV observation
30

30 registered EVs in September 2022; stale and unsegmented.

Authoritative public connectors

No audited national connector census located.

Gate SAM jobs/year
162

Only after 250 separated active-status Greater Harare plug-ins.

Base simple payback
4.098

Partner-clinic assumption on US$20,000 reversible capex.

Executive summary

The verdict in full

Evidence, assumptions and operational implications are separated below.

Market headline

Evidence, assumptions and operational implications are separated below.

Market headline

Historic registered EV observation
Value
30
Unit
EVs
Period
September 2022
Status
Stale ZERA-attributed observation; current value unknown [ev_2022].
Licensed vehicles
Value
827,000
Unit
vehicles
Period
2024
Status
All powertrains; licensing flow, not registered parc [zinara_2024].
Authoritative public connectors
Value
Unit
connectors
Period
Current
Status
No audited national census located.
Gate-planning SAM
Value
162
Unit
jobs/year
Period
EVS model
Status
Activates only after 250 separated active Greater Harare passenger/light-commercial BEV/PHEVs.

Source: EVS Zimbabwe decision-gate and pilot model

Market size and vehicle parc context

Zimbabwe has multiple incompatible all-vehicle counts and no current passenger BEV/PHEV denominator. None is used as EV TAM.

Historic EV observation and missing current series

2022 is stale; current passenger BEV/PHEV stock remains unavailable.

September 2022Base case30
2023–20260

Source: Zimbabwe crafting new policy in push for electric vehicles

Market size and vehicle parc context

Licensed vehicles
Value
827,000
Unit
vehicles
Period
2024
Scope
All powertrains [zinara_2024].
Licensed vehicles
Value
850,000
Unit
approx. vehicles
Period
February 2025
Scope
ZINARA-attributed snapshot [zinara_2025].
Registered motor-vehicle population
Value
1,700,000
Unit
approx. vehicles
Period
February 2025
Scope
ZINARA-attributed administrative register [zinara_2025].
Roadworthy/eligible vehicles
Value
1,200,000
Unit
approx. vehicles
Period
February 2025
Scope
ZINARA-attributed eligibility context [zinara_2025].
Current passenger BEV/PHEV stock
Value
Unit
vehicles
Period
Current
Scope
No accessible authoritative separated series.

Source: EVS Zimbabwe decision-gate and pilot model

BEV/PHEV sales, stock and adoption history

The only located registration observation is 30 EVs in 2022; the accompanying hybrid count is not powertrain-separated. Current annual sales and stock remain null.

BEV/PHEV sales, stock and adoption history

September 2022
Bev Phev
All Ev
30
Hybrid Unsplit
1,000
Definition
ZERA-attributed; hybrids may include HEV and PHEV, so excluded from plug-in stock [ev_2022].
2023–2026
Bev Phev
All Ev
Hybrid Unsplit
Definition
No authoritative annual passenger BEV/PHEV sales or active-stock series located.

Source: EVS Zimbabwe decision-gate and pilot model

Definition reconciliation

Evidence, assumptions and operational implications are separated below.

Definition reconciliation

Passenger BEV/PHEV sales and stock
Treatment
Current values null
Reason
No accessible annual or active-status series.
30 EVs in 2022
Treatment
Historic observation/floor only
Reason
Stale, unsegmented and not extrapolated into current TAM [ev_2022].
About 1,000 hybrids in 2022
Treatment
Excluded from plug-in pool
Reason
HEV/PHEV not separated [ev_2022].
827k / 850k licensed vehicles
Treatment
Context only
Reason
All powertrains; not registered active passenger parc [zinara_2024] [zinara_2025].
1.7m registered / 1.2m eligible
Treatment
Administrative context
Reason
Different status definitions and no propulsion split [zinara_2025].
Charging sites claimed commercially
Treatment
Excluded from headline count
Reason
Sites are not connector-, power-, access- or uptime-audited [charging_secondary].

Source: EVS Zimbabwe decision-gate and pilot model

Get the full Zimbabwe analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

Cautious/base/high capacity cases

These are capacity-sensitivity cases grown from a stale historic observation, not a forecast of today’s fleet.

Five-year capacity sensitivity cases

EVS cases from stale 30-EV observation; not a current-stock forecast.

Cautious111
Base315
HighBase case960

Source: EVS Zimbabwe decision-gate and pilot model

Cautious/base/high capacity cases

Cautious
Annual Growth Pct
30
Five Year Capacity Case
111
Interpretation
Case grown from stale 30-EV observation; not current stock forecast.
2 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Charging infrastructure

No authoritative connector census was found. Commercial site claims are retained only as diligence leads.

Charging infrastructure

Authoritative public connectors
Value
Unit
connectors
Evidence
No auditable national census located.
Commercially claimed sites
Value
15
Unit
private/commercial sites
Evidence
Secondary claim for August 2024; not verified connectors/uptime [charging_secondary].
Solar EVSE customs rebate
Value
Unit
eligible equipment list
Evidence
SI 35 relay; only ZERA-approved operators, written confirmation required [si35].
Site supply reliability
Value
Unit
hours/availability
Evidence
No current feeder-specific evidence; audit load, phase, earthing, outage history and backup.

Source: EVS Zimbabwe decision-gate and pilot model

Vehicle parc age and service demand

Evidence, assumptions and operational implications are separated below.

Vehicle parc age and service demand

Passenger BEV/PHEV by age/warranty/location
Value
Unit
vehicles
Implication
No national service-demand denominator.
Used import age ceiling
Value
10
Unit
years
Implication
General private import rule supports a younger inflow but does not prove EV age mix [zimra_vehicle_import].
Roadworthy/eligible all-vehicle context
Value
1,200,000
Unit
approx. vehicles
Implication
Cannot be used as plug-in denominator [zinara_2025].
OEM-supported local EV models
Value
Unit
sales
Implication
Availability and service presence, not volume [byd] [byd_service].

Source: EVS Zimbabwe decision-gate and pilot model

EVS assumptions

Evidence, assumptions and operational implications are separated below.

EVS assumptions

Greater Harare launch threshold
Value
250
Unit
registered active passenger/light-commercial BEV/PHEV
Basis
EVS density gate, not estimate.
Active/available factor
Value
0.9
Unit
share
Basis
EVS planning haircut after registry proof.
Independent reach
Value
0.6
Unit
share
Basis
EVS assumption after warranty/fleet screening.
Service events
Value
1.2
Unit
jobs/vehicle/year
Basis
EVS blended diagnostic/chassis assumption.
Average repair order
Value
300
Unit
USD/job
Basis
Replace with paid Zimbabwe observations.
Reversible capex ceiling
Value
20,000
Unit
USD
Basis
EVS board gate.
Executable SOM before gates
Value
0
Unit
jobs
Basis
Deliberately zero.

Source: EVS Zimbabwe decision-gate and pilot model

Get the full Zimbabwe analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

Transparent TAM / SAM / SOM

National passenger TAM is deliberately null and executable SOM is zero. The only quantified opportunity is a post-gate Harare capacity case.

Transparent TAM / SAM / SOM

National passenger plug-in TAM
Vehicles
Jobs Per Year
Revenue Usd
Status
Not quantified: current active passenger/light-commercial BEV/PHEV denominator unavailable.
Historic-observation proxy
Vehicles
30
Jobs Per Year
Revenue Usd
Status
30 EVs in 2022 is stale and unsegmented; not current service pool.
Greater Harare gate SAM
Vehicles
135
Jobs Per Year
162
Revenue Usd
48,600
Status
250 separated registrations × 90% active × 60% reach × 1.20 events.
1 more row in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Customer and fleet segments

Evidence, assumptions and operational implications are separated below.

Customer and fleet segments

Private early adopters and used imports
Need
Pre-purchase report, scan, charging, 12V and chassis evidence
Priority
High only for supported VINs.
Corporate/mining light fleets
Need
Uptime inspections and audit trail
Priority
High through paid fleet trial.
Tourism, rental and hospitality fleets
Need
Route/charging readiness and condition reporting
Priority
Medium; Victoria Falls later.
Public and municipal fleets
Need
Documented procurement and safe diagnostics
Priority
Contract only.
Buses, motorcycles, heavy EVs
Need
Separate equipment and competence
Priority
Excluded from Phase 1.

Source: EVS Zimbabwe decision-gate and pilot model

Leading EV brands and models

Evidence, assumptions and operational implications are separated below.

Leading EV brands and models

BYD
Model
Dolphin Surf
Powertrain
BEV
Signal
Official local availability; no sales volume [byd].
BYD
Model
Atto 3
Powertrain
BEV
Signal
Official local availability and authorised service [byd] [byd_service].
BYD
Model
Sealion 6
Powertrain
Plug-in/super hybrid; verify VIN
Signal
Official local availability; classify by VIN before booking [byd].
BYD
Model
Shark 6
Powertrain
Plug-in/super hybrid; verify VIN
Signal
Official local availability; classify by VIN before booking [byd].
Mixed used imports
Model
Nissan Leaf / other BEV/PHEV
Powertrain
VIN-specific
Signal
No authoritative model ranking; availability does not establish share.

Source: EVS Zimbabwe decision-gate and pilot model

Independent and OEM competitors

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Independent and OEM competitors

BYD Zimbabwe
Type
OEM-authorised sales/service
Footprint
Eastlea and Hatfield, Harare
Threat
High for warranty vehicles
Response
Out-of-warranty, chassis and written overflow scope only [byd_service].
Franchised OEM dealer networks
Type
Authorised workshop
Footprint
Harare and major cities
Threat
High for warranty/parts
Response
Partner/referral; verify EV competence brand by brand.
2 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Priority cities and regions

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Priority cities and regions

1
Region
Greater Harare
Rationale
Capital, two BYD locations and largest likely early-adopter/fleet concentration; density still unverified.
Mode
Only candidate for scheduled partner clinic [byd_service].
4 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Consumer incentives and policy

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Consumer incentives and policy

EV customs duty
Status
25% measure reported effective 1 January 2025, down from 40%
Action
Obtain written ZIMRA HS ruling; do not infer hybrid or parts treatment [budget_ev] [duty_crosscheck].
Hybrid customs duty
Status
40% reported in secondary cross-check
Action
Powertrain/HS classification controls [duty_crosscheck].
3 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Business, tax and investment incentives

The model assumes no grant, reduced rate or customs rebate. Exact eligibility must be confirmed in writing.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Business, tax and investment incentives

Standard VAT
Rate
15.5%
Treatment
Economics VAT-exclusive; compulsory registration threshold US$25,000/ZiG equivalent [zimra_vat] [zimra_vat_reg].
Company income tax
Rate
25%
Treatment
Pre-tax model; AIDS levy adds 3% of tax chargeable [zimra_tax].
3 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Labour, licensing and workshop regulation

Every material approval is a launch gate; this report is not legal, tax, engineering or insurance advice.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Labour, licensing and workshop regulation

Entity, tax and payroll
Authority
Companies Registry / ZIMRA / NSSA
Evidence
Company, TIN, tax clearance, VAT/PAYE if applicable and employer registration [zida] [nssa].
Premises, trading, zoning and fire
Authority
City of Harare / fire authority
Evidence
Written workshop use, business licence, occupancy, fire and signage approval [zida] [harare_licence].
4 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

High-voltage controls

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

High-voltage controls

VIN/powertrain whitelist
Evidence
Classify BEV, PHEV, HEV, MHEV and conversions before booking.
Task-specific authorisation
Evidence
Named technician, assessment, scope, expiry and supervision.
Safe de-energisation
Evidence
OEM procedure, lock/tag, proved tester and absence-of-voltage record [iso_6469].
Controlled work zone
Evidence
Barriers, insulated PPE/tools, rescue equipment and no lone HV work.
Charging interface
Evidence
Licensed electrical work; IEC 61851/ISO 17409 as benchmarks only [iec_61851] [iso_17409].
Release evidence
Evidence
Pre/post scan, restoration, torque/QC, limitations and customer sign-off.

Source: EVS Zimbabwe decision-gate and pilot model

Battery and waste controls

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Battery and waste controls

Intact in-vehicle traction pack
Rule
Non-invasive diagnostics only
Route
No opening, removal or storage.
Suspect/damaged pack arrival
Rule
Refuse routine indoor custody
Route
Emergency/OEM/insurer plan.
3 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Franchise and operating model

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Franchise and operating model

Format
Recommendation
Scheduled clinic days in one compliant Greater Harare partner workshop.
Ownership
Recommendation
Zimbabwe company/joint venture with verified registrations and local operating partner.
Territory
Recommendation
No franchise sale or exclusivity before 12 months paid evidence.
Staffing
Recommendation
One assessed HV lead plus one technician; shared front desk/support.
Technology
Recommendation
Supported VIN/task matrix and lawful service information.
Commercial
Recommendation
USD menu prices, deposits and paid fleet trials; reprice local-currency costs weekly.
Expansion
Recommendation
Bulawayo/Victoria Falls collection days only after Harare continuation gate.

Source: EVS Zimbabwe decision-gate and pilot model

Pilot steady-state economics

All volumes, pricing, margins, costs and capex are EVS assumptions in USD, VAT-exclusive and pre-tax.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Pilot steady-state economics

Cautious
Jobs
30
Aro Usd
250
Gross Margin Pct
55
Opex Usd
7,000
Revenue Usd
7,500
Gross Profit Usd
4,125
Ebitda Usd
-2,875
Payback Years
2 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

90-day pilot economics

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

90-day pilot economics

Cautious
Jobs 90d
8
Aro Usd
250
Gross Margin Pct
55
Opex Usd
1,750
Revenue Usd
2,000
Gross Profit Usd
1,100
Ebitda Usd
-650
2 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Risks and mitigations

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Risks and mitigations

Current passenger-BEV/PHEV denominator unavailable
Likelihood
High
Impact
High
Mitigation
Matched CVR/ZINARA extract; TAM remains null.
Stale 30-EV observation treated as current stock
Likelihood
High
Impact
High
Mitigation
Use only as historic floor; no extrapolated TAM.
Hybrids mistaken for PHEVs
Likelihood
High
Impact
High
Mitigation
VIN-level propulsion classification.
Charging sites mistaken for connectors/uptime
Likelihood
High
Impact
Medium
Mitigation
Physical connector, power, access and uptime audit.
Grid interruption/site capacity
Likelihood
Medium
Impact
High
Mitigation
Load study, solar/backup design and no uncontrolled public charging.
OEM software, warranty and parts access
Likelihood
High
Impact
High
Mitigation
Supported VIN/task matrix and referral network.
Battery fire or electric shock
Likelihood
Low
Impact
Critical
Mitigation
No pack work; isolation SOP, rescue gear and drills.
Waste route failure
Likelihood
Medium
Impact
Critical
Mitigation
No traction-battery custody before written EMA route.
Currency/tax/incentive interpretation
Likelihood
High
Impact
Medium
Mitigation
USD planning, short validity, written ZIMRA/ZERA advice.
Very small paid demand
Likelihood
High
Impact
High
Mitigation
Clinic format, deposits and hard day-90 stop.

Source: EVS Zimbabwe decision-gate and pilot model

90-day entry plan

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

90-day entry plan

0–15
Objective
Registry and legal gate
Actions
Obtain CVR/ZINARA extract by propulsion/body/age/owner/location/status; map entity, premises, factory, fire, electricity, standards, waste, data and insurance.
Owner
EVS board / Zimbabwe counsel
Deliverable
Definition and compliance file.
4 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Explicit go / no-go gates

Evidence, assumptions and operational implications are separated below.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Explicit go / no-go gates

Market denominator
Go
Matched extract proves at least 250 registered active-status passenger/light-commercial BEVs/PHEVs in Greater Harare, separately identified
No Go
Classes/status/location cannot be separated or count is below 250.
5 more rows in the full report

Source: EVS Zimbabwe decision-gate and pilot model

Methodology

Evidence, assumptions and operational implications are separated below.

Greater Harare partner-clinic EBITDA

USD; EVS steady-state assumptions.

Cautious-3k
Base5k
HighBase case14k

Source: EVS Zimbabwe decision-gate and pilot model

Methodology

1. Evidence hierarchy
Method
Primary Zimbabwe authorities first; attributed figures labelled where direct tables were unavailable.
2. Definition control
Method
Separate registered, licensed, roadworthy, active, passenger BEV/PHEV, unsplit hybrids and charger-site claims.
3. Market denominator
Method
Leave national passenger TAM null until matched CVR/ZINARA extract.
4. Historic observation
Method
30 EVs in 2022 remains a stale floor, not a current-stock estimate.
5. Gate SAM
Method
250 separated Greater Harare plug-ins × 90% active × 60% reach × 1.20 events.
6. SOM
Method
Zero before hard gates.
7. Forecasts
Method
Five-year capacity cases from the stale observation; not official forecasts.
8. Economics
Method
USD, VAT-exclusive EVS assumptions; base/high capacity below gate SAM.
9. Validation
Method
JSON, schema, formulas, citations, links, branding, definitions and template residue.

Source: EVS Zimbabwe decision-gate and pilot model

Complete linked source register

Each material number is linked to a source or explicitly labelled as an EVS assumption.

Complete linked source register

zinara_2025
Publisher
Zimbabwe Independent
Publication Date
2025-02-14
Accessed At
2026-08-11
Scope
ZINARA-attributed context: about 850,000 licensed; about 1.7m registered; about 1.2m roadworthy/eligible. Definitions differ and no propulsion split was published.
Href
https://www.theindependent.co.zw/local-news/article/200038263/zinara-targets-one-million-licensed-vehicles
zinara_2024
Publisher
The Herald
Publication Date
2025-07-01
Accessed At
2026-08-11
Scope
Transport ministry statement that about 827,000 vehicles were licensed in 2024; all powertrains.
Href
https://www.heraldonline.co.zw/zinara-licensed-827-000-vehicles-last-year/
vehicle_2023
Publisher
Zimbabwe News Now
Publication Date
2024-03-01
Accessed At
2026-08-11
Scope
ZINARA board-chair attribution: CVR had 1.2m registered vehicles and about 800,000 licensed; dated 2023 context.
Href
https://www.zimlive.com/400k-vehicles-being-driven-on-zimbabwean-roads-with-no-licences-zinara/
ev_2022
Publisher
Mail & Guardian
Publication Date
2022-09-28
Accessed At
2026-08-11
Scope
ZERA CEO attribution: 30 EVs and about 1,000 second-hand hybrids registered. Stale; hybrid category is not separated into HEV/PHEV.
Href
https://mg.co.za/the-green-guardian/2022-09-28-zimbabwe-crafting-new-policy-in-push-for-electric-vehicles/
zinara
Publisher
ZINARA
Publication Date
Accessed At
2026-08-11
Scope
Primary road-user fee and licensing authority route.
Href
https://zinara.co.zw/
vehicle_licensing
Publisher
ZINARA
Publication Date
Accessed At
2026-08-11
Scope
Primary vehicle-licensing route; no public propulsion-level table located.
Href
https://www.zinara.co.zw/vehicle-licensing/
vid
Publisher
Ministry of Transport and Infrastructural Development
Publication Date
Accessed At
2026-08-11
Scope
Official roadworthiness inspection and driver testing mandate across 23 branches.
Href
https://testdomain8.gov.zw/service/vid/
zimra_vehicle_import
Publisher
Zimbabwe Revenue Authority
Publication Date
Accessed At
2026-08-11
Scope
Primary import declaration and ten-year age restriction.
Href
https://zimra.co.zw/customs/importation-of-motor-vehicles-by-private-individuals
zimra_customs
Publisher
Zimbabwe Revenue Authority
Publication Date
Accessed At
2026-08-11
Scope
Primary tariff, valuation, suspensions, rebates and agreement route; written HS ruling controls.
Href
https://www.zimra.co.zw/customs/customs-and-excise-duties
zimra_forex
Publisher
Zimbabwe Revenue Authority
Publication Date
Accessed At
2026-08-11
Scope
Passenger vehicles are designated for duty payment in foreign currency, subject to listed exceptions.
Href
https://www.zimra.co.zw/customs/goods-designated-to-pay-duty-in-forex
budget_ev
Publisher
Xinhua via Zimbabwe Star
Publication Date
2024-11-28
Accessed At
2026-08-11
Scope
2025 budget proposal/measure: EV customs duty from 40% to 25% effective 1 January 2025; solar-EVSE rebate and 33% 2030 ambition. Current ZIMRA classification still controls.
Href
https://www.zimbabwestar.com/news/274800444/zimbabwe-plans-to-slash-import-duty-on-evs-to-boost-demand
duty_crosscheck
Publisher
Techzim
Publication Date
2024-12-02
Accessed At
2026-08-11
Scope
Secondary cross-check: EV duty 25%, hybrids remain 40%; do not substitute for written ruling.
Href
https://www.techzim.co.zw/2024/12/zimbabwe-slashes-ev-import-duty-by-15-offers-charging-station-rebates/
si35
Publisher
Business Daily
Publication Date
2025-04-28
Accessed At
2026-08-11
Scope
SI 35 of 2025 relay: rebate for specified solar EVSE equipment imported by ZERA-approved operators; transfer restrictions apply.
Href
https://www.businessdaily.co.zw/index-id-national-zk-49651.html
zimra_vat
Publisher
Zimbabwe Revenue Authority
Publication Date
Accessed At
2026-08-11
Scope
Official standard VAT rate 15.5%; generally applies unless zero-rated/exempt.
Href
https://www.zimra.co.zw/domestic-taxes/vat/mechanics-of-vat
zimra_vat_reg
Publisher
Zimbabwe Revenue Authority
Publication Date
Accessed At
2026-08-11
Scope
Compulsory registration threshold US$25,000 or ZiG equivalent over 12 months.
Href
https://www.zimra.co.zw/domestic-taxes/vat/vat-registration
zimra_tax
Publisher
Zimbabwe Revenue Authority
Publication Date
Accessed At
2026-08-11
Scope
Official company income tax 25%; AIDS levy 3% of tax chargeable; incentives depend on licensed status/activity.
Href
https://www.zimra.co.zw/domestic-taxes/corporate/tax-rates
zida
Publisher
Zimbabwe Investment and Development Authority
Publication Date
Accessed At
2026-08-11
Scope
Official procedures for companies, investment licensing, social security, local licences, OSH and environmental permits.
Href
https://eregulations.zidainvest.com/
zida_investment
Publisher
Zimbabwe Investment and Development Authority
Publication Date
Accessed At
2026-08-11
Scope
Official licence route and investor protections; valid 1–3 years depending on investment type.
Href
https://eregulations.zidainvest.com/objective/29
zida_environment
Publisher
Zimbabwe Investment and Development Authority
Publication Date
Accessed At
2026-08-11
Scope
Official checklist includes factory registration, environmental approvals, hazardous-substance and hazardous-waste licences.
Href
https://eregulations.zidainvest.com/objective/49
harare_licence
Publisher
City of Harare
Publication Date
2025-11-03
Accessed At
2026-08-11
Scope
Local-authority evidence that annual business/shop licensing remains required; exact workshop category and current tariff need confirmation.
Href
https://www.hararecity.co.zw/news/read/city-reduces-business-licence-fees
ema
Publisher
EMA Zimbabwe
Publication Date
Accessed At
2026-08-11
Scope
Primary environmental regulator under the Environmental Management Act [Chapter 20:27].
Href
https://ema.co.zw/
ema_hazard
Publisher
EMA Zimbabwe
Publication Date
Accessed At
2026-08-11
Scope
Official licence requirements for hazardous-substance storage/use, import/export and transport; inspection precedes new licences.
Href
https://ema.co.zw/hazardous-substances/
ema_effluent
Publisher
EMA Zimbabwe
Publication Date
Accessed At
2026-08-11
Scope
Official effluent licence requirements, inspection and quarterly reporting route.
Href
https://ema.co.zw/water-and-effluent/
zera
Publisher
ZERA
Publication Date
Accessed At
2026-08-11
Scope
Primary energy regulator and approval route.
Href
https://www.zera.co.zw/
zera_publications
Publisher
ZERA
Publication Date
Accessed At
2026-08-11
Scope
Primary policy repository including energy-efficiency and renewable-energy documents; no audited EV connector census located.
Href
https://www.zera.co.zw/publications/
zera_regulations
Publisher
ZERA
Publication Date
Accessed At
2026-08-11
Scope
Primary legal/regulatory document route.
Href
https://www.zera.co.zw/investment-regulations/
solar_standards
Publisher
ZERA
Publication Date
Accessed At
2026-08-11
Scope
Official standards list for PV, inverters and batteries, including IEC 62619, IEC 62281 and UN 38.3 for lithium batteries.
Href
https://solarprs.zera.co.zw/
byd
Publisher
BYD Zimbabwe
Publication Date
Accessed At
2026-08-11
Scope
Official local lineup: Dolphin Surf and Atto 3 BEVs; Sealion 6 and Shark 6 marketed as super hybrids.
Href
https://www.bydzimbabwe.co.zw/
byd_service
Publisher
BYD Zimbabwe
Publication Date
Accessed At
2026-08-11
Scope
Official manufacturer-backed service, battery monitoring, trained technicians, parts and two Harare branches.
Href
https://www.bydzimbabwe.co.zw/service-support
charging_secondary
Publisher
EV24.africa
Publication Date
2026-04-01
Accessed At
2026-08-11
Scope
Commercial secondary claim of one public fast charger in 2022 and about 15 private/commercial sites by August 2024; not auditable connector census and excluded from headline count.
Href
https://www.ev24.africa/electric-vs-hybrid-zimbabwe-which-makes-sense/
data_official
Publisher
Zimbabwe Revenue Authority
Publication Date
2026-01-01
Accessed At
2026-08-11
Scope
Official implementation evidence for Cyber and Data Protection Act [Chapter 12:07] and SI 155 of 2024; DPO appointment required for entities processing information.
Href
https://www.zimra.co.zw/news/2347%3Aknow-your-data-protection-officers-safeguarding-zimra-s-data-integrity
data_reg
Publisher
TechnoMag
Publication Date
2026-03-27
Accessed At
2026-08-11
Scope
POTRAZ regulatory-notice relay: data-controller licensing under SI 155 of 2024; validate scope directly with POTRAZ.
Href
https://technomag.co.zw/potraz-issues-warning-to-unlicensed-data-controllers-as-compliance-deadline-lapses/
nssa
Publisher
National Social Security Authority
Publication Date
Accessed At
2026-08-11
Scope
Official NSSA employer self-service route.
Href
https://selfservice.nssa.org.zw/Identity/Account/Register
iso_6469
Publisher
ISO
Publication Date
Accessed At
2026-08-11
Scope
International safety benchmark; Zimbabwe law and adopted standards control.
Href
https://www.iso.org/standard/45477.html
iso_17409
Publisher
ISO
Publication Date
Accessed At
2026-08-11
Scope
International conductive charging safety benchmark; local adoption/approval required.
Href
https://www.iso.org/standard/68474.html
iec_61851
Publisher
IEC
Publication Date
Accessed At
2026-08-11
Scope
International EVSE benchmark; not evidence of local adoption.
Href
https://webstore.iec.ch/en/publication/33644
un_tests
Publisher
UNECE
Publication Date
Accessed At
2026-08-11
Scope
UN 38.3 lithium-battery transport testing context.
Href
https://unece.org/transport/dangerous-goods/rev8-files
basel
Publisher
Basel Convention Secretariat
Publication Date
Accessed At
2026-08-11
Scope
Transboundary hazardous-waste control context.
Href
https://www.basel.int/TheConvention/Overview/tabid/1271/Default.aspx
ilo_osh
Publisher
International Labour Organization
Publication Date
Accessed At
2026-08-11
Scope
Occupational-safety management benchmark; does not replace Zimbabwe law.
Href
https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001
evs_model
Publisher
EVS Worldwide
Publication Date
2026-08-11
Accessed At
2026-08-11
Scope
Internal assumptions/calculations; no assumption is presented as sourced fact.
Href
EVS://Zimbabwe/market-entry-model

Validation register

Evidence, assumptions and operational implications are separated below.

Validation register

JSON / UTF-8
Status
Pass
Detail
Generated and reparsed.
Schema
Status
Pass
Detail
Required blocks, datasets, calculations and source registry present.
Calculations
Status
Pass
Detail
Gate SAM, capacity cases and economics recomputed.
Definition control
Status
Pass
Detail
Registered/licensed/eligible vehicles, current plug-ins, unsplit hybrids and charger claims remain separate.
Branding
Status
Pass
Detail
EVS Green #5BCC12, Silver #A7B3BB, charcoal/black, white/light grey and Inter; no blue.
Decision
Status
Pass
Detail
National TAM null, executable SOM zero and hard gates explicit.

Source: EVS Zimbabwe decision-gate and pilot model

Get the full Zimbabwe analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

EVS Board Position

CONDITIONAL GO for diligence and a scheduled Greater Harare partner clinic; NO-GO standalone/franchise; HOLD traction-pack work.

Source register

40 primary and derived sources

Show

Get the full Zimbabwe report

The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.

We use your details only to send the report and follow up about EVS franchise opportunities.