Cabo Verde.
EVS Cabo Verde EV Service Centre Market Entry
Decision-grade market-entry report for an EVS service-centre model in Cabo Verde.
Active plug-in stock
—
No audited active passenger/light-commercial plug-in stock.
Public stations
40
Government final public-network station count.
Gate jobs
76
EVS gate annual jobs; not market estimate.
Base payback
15.873
Base simple payback on reversible capex.
01/The verdict in full
Executive summary
The market has material policy and charging progress, but a standalone centre is not justified without an audited serviceable parc.
02
Decision dashboard
Facts, proxies and open denominators are kept separate.
Decision dashboard
- Period
- June 2025
- Value
- 40
- Unit
- stations
- Status
- Across all inhabited islands; connector count, power and uptime were not published [climate_portal_pt].
- Period
- 2024
- Value
- 8
- Unit
- %
- Status
- Government light-vehicle denominator [climate_portal_pt].
- Period
- Project closeout
- Value
- 5.4
- Unit
- %
- Status
- MAF all-registration denominator; not directly comparable with the 8% measure [maf_closeout].
- Period
- Project closeout
- Value
- 409
- Unit
- vehicles
- Status
- Cumulative programme output across seven islands; not audited active stock [maf_closeout].
- Period
- Current
- Value
- —
- Unit
- vehicles
- Status
- No audited registry extract located; ~200 is a proxy only.
- Period
- Pre-gate
- Value
- 0
- Unit
- jobs/year
- Status
- Hard control until every launch gate passes.
03
Market size
The 25% ambition and 40-station network do not supply the missing active passenger/LCV denominator.
Market size
- Value
- 25
- Unit
- %
- Definition
- At least 25% of national fleet; denominator and path not published in source [climate_portal_pt].
- Value
- 40
- Unit
- stations
- Definition
- Final government network count; not connectors or confirmed live sites [climate_portal_pt].
- Value
- 200
- Unit
- vehicles
- Definition
- 40 stations × five EVs per public point; EVS inference, not audited stock [climate_portal_pt][evs_model].
- Value
- 409
- Unit
- vehicles
- Definition
- Cumulative Rebate Programme output across seven islands; not active stock and materially above the ratio proxy [maf_closeout].
- Value
- 491,233
- Unit
- people
- Definition
- Secondary report citing INE; demographic context only [census_2021].
04
BEV/PHEV adoption history
Available history mixes approximate stocks and registration shares with different denominators.
BEV/PHEV adoption history
- Measure
- Approximate EVs
- Value
- 100
- Unit
- vehicles
- Scope
- Historical government statement [government_2022].
- Measure
- EVs on Sal
- Value
- 20
- Unit
- vehicles
- Scope
- Historical island statement; eight ProMEC-supported [government_sal].
- Measure
- Approximate national EVs
- Value
- 200
- Unit
- vehicles
- Scope
- Secondary report citing authorities [rtp_network].
- Measure
- EV share of new light registrations
- Value
- 8
- Unit
- %
- Scope
- Government-defined light-vehicle registrations [climate_portal_pt].
- Measure
- EV share of all new registrations
- Value
- 5.4
- Unit
- %
- Scope
- MAF project KPI with different denominator [maf_closeout].
- Measure
- EVs financed through rebate programme
- Value
- 409
- Unit
- vehicles
- Scope
- Cumulative flow across seven islands; includes 14 electric taxis; not active stock [maf_closeout].
05
Definition reconciliation
These controls prevent false precision.
Definition reconciliation
- Use
- Government national-network count
- Not Equivalent To
- Connector, charging point, live site, power class or uptime.
- Use
- Directional stock proxy
- Not Equivalent To
- Audited active BEV/PHEV stock [climate_portal_pt].
- Use
- Cumulative programme-output flow
- Not Equivalent To
- 409 active passenger/LCV plug-ins; it also conflicts with the ~200 ratio proxy [maf_closeout].
- Use
- 2024 new light-vehicle adoption indicator
- Not Equivalent To
- 5.4% of all new registrations or fleet share.
- Use
- Government objective
- Not Equivalent To
- Forecast, funded delivery plan or serviceable parc.
- Use
- Availability/competition
- Not Equivalent To
- Sale or registration [bavaro][nammi][icar].
06
2030 scenarios
EVS sensitivities from a proxy; not official forecasts.
2030 scenarios
- Cagr Pct
- 12
- Modelled 2030 Active Plug Ins
- 352
- Basis
- EVS sensitivity from an approximately 200-vehicle 2025 proxy inferred from the official 40-station network and stated one-public-point-per-five-EVs ratio; not an audited stock or official forecast.
- Cagr Pct
- 22
- Modelled 2030 Active Plug Ins
- 541
- Basis
- EVS sensitivity from an approximately 200-vehicle 2025 proxy inferred from the official 40-station network and stated one-public-point-per-five-EVs ratio; not an audited stock or official forecast.
- Cagr Pct
- 32
- Modelled 2030 Active Plug Ins
- 801
- Basis
- EVS sensitivity from an approximately 200-vehicle 2025 proxy inferred from the official 40-station network and stated one-public-point-per-five-EVs ratio; not an audited stock or official forecast.
07
Charging infrastructure
Forty stations are official, while connectors, power and uptime remain open.
Charging infrastructure
- Count
- 40
- Unit
- stations
- Status
- Completed across all inhabited islands [climate_portal_pt].
- Decision
- Audit site, connector, power, access, tariff, uptime and operator.
- Count
- —
- Unit
- points
- Status
- Government states other points exist without count [climate_portal_pt].
- Decision
- Exclude from count pending inventory.
- Count
- —
- Unit
- current live stations
- Status
- Historical planned allocation and seven-year concession reported [rtp_network].
- Decision
- Obtain current operator asset register.
- Count
- 1
- Unit
- historical site
- Status
- Government inaugurated first site in March 2023 [government_enacol].
- Decision
- Verify current configuration and uptime.
08
Electricity and grid
High national coverage does not replace a site test.
Electricity and grid
- Value
- 98
- Unit
- %
- Date
- 2026 project baseline
- Interpretation
- High access, not site power-quality evidence [worldbank_energy].
09
Parc age and service demand
Age and out-of-warranty stock are open diligence items.
Parc age and service demand
- Value
- —
- Implication
- Cannot quantify out-of-warranty pool; obtain VIN first-registration dates.
- Unit
- —
- Value
- —
- Implication
- No authoritative series; do not infer from listings.
- Unit
- —
- Value
- 100
- Implication
- Some early vehicles may now need independent service, but active status is unknown [government_2022].
- Unit
- approximate vehicles
- Value
- —
- Implication
- Independent proposition must focus on documented non-warranty tasks [bavaro].
- Unit
- —
10
TAM / SAM / SOM
Current TAM is null and executable SOM is zero; the launch pool is a gate.
TAM / SAM / SOM
- Value
- —
- Unit
- active passenger/LCV plug-ins
- Type
- Sourced fact unavailable
- Formula
- Requires active BEV + PHEV registry/VIN extract.
- Value
- 200
- Unit
- vehicles
- Type
- EVS inference
- Formula
- 40 public stations × five EVs/point; materially below the 409 programme-financed flow and therefore not fit as active stock [climate_portal_pt][maf_closeout][evs_model].
- Value
- 409
- Unit
- vehicles
- Type
- Sourced programme output
- Formula
- MAF closeout; not active stock, passenger/LCV-only or a current island split [maf_closeout].
11
Customer segments
Paid evidence takes precedence over stated interest.
Customer segments
- Segment
- Praia owner-drivers and parallel imports
- Need
- Supported diagnostics, 12V, tyres/brakes/suspension, thermal screening and pre-purchase evidence.
- Validation
- Matched VIN list and paid bookings.
- Segment
- SMEs, taxis and professional users
- Need
- Uptime, predictable pricing and mobile triage.
- Validation
- Paid trial and vehicle roster.
- Segment
- Dealer overflow/non-warranty customers
- Need
- Transparent independent scope and referral.
- Validation
- Written task/warranty boundary [bavaro].
- Segment
- Inter-island used EV buyers
- Need
- Battery-health screening and provenance.
- Validation
- Island/VIN/age evidence.
12
Fleet segments
Public, taxi, hotel and rental fleets are validation targets.
Fleet segments
- Evidence
- ProMEC included public-sector acquisitions and training [maf_transport].
- Route
- Procurement/maintenance roster and paid inspection day.
- Evidence
- Large visitor flows on Sal and Boa Vista, but plug-in fleet count unavailable [tourism_2024].
- Route
- Interview and paid trial; no inferred EV stock.
- Evidence
- No verified active plug-in count.
- Route
- Santiago association roster and paid uptime trial.
- Evidence
- Multiple listed EV brands/models [bavaro][nammi][icar][golden_island].
- Route
- Overflow, PDI and non-warranty partnership diligence.
13
Brands and models
Listings evidence availability, not sales or registrations.
Brands and models
- Model
- Dealer-listed range
- Type
- Passenger BEV/PHEV availability
- Evidence
- Bávaro and Golden Island market presence [bavaro][golden_island].
- Sales Or Stock
- —
- Model
- Nammi Box 01
- Type
- Passenger BEV listing
- Evidence
- New 100% electric listing [nammi].
- Sales Or Stock
- —
- Model
- V23 2WD
- Type
- Passenger BEV listing
- Evidence
- 100 kW electric listing [icar].
- Sales Or Stock
- —
- Model
- Local dealer portfolios
- Type
- EV-capable brand presence unquantified
- Evidence
- Dealer brands; do not infer EV model stock [bavaro].
- Sales Or Stock
- —
14In the full report
OEM and dealer competitors
Partner/referral strategy is preferred.
This section is in the full report.
15In the full report
Independent competitors
Capability counts require a field audit.
This section is in the full report.
16In the full report
Priority cities and islands
Praia is the only fixed-pilot candidate.
This section is in the full report.
17In the full report
Consumer incentives
Current written tax/customs confirmation controls.
This section is in the full report.
18In the full report
Business and investment incentives
No unawarded benefit enters economics.
This section is in the full report.
19In the full report
Tax and payroll snapshot
Professional summaries are planning inputs, not opinions.
This section is in the full report.
20In the full report
Entity, licensing and premises
Every approval remains a pre-lease gate.
This section is in the full report.
21In the full report
Labour and competence
HV training evidence exists but no statutory credential is inferred.
This section is in the full report.
22In the full report
High-voltage safety
Manufacturer procedures and local approvals control.
This section is in the full report.
23In the full report
Battery, waste and transport
Traction-pack work is held.
This section is in the full report.
24
Data, consumer and warranty
Independent status and data controls must be explicit.
Data, consumer and warranty
- Control
- Purpose, minimization, lawful basis, rights, retention, security and processor contracts.
- Gate
- CNPD compliance file [cnpd_rights][cnpd_obligations].
- Control
- Map recipients, countries and safeguards before upload.
- Gate
- Consolidated legal opinion [data_amendment].
- Control
- Quote, consent, parts provenance, warranty, rework, custody and dispute route.
- Gate
- Portuguese/Crioulo customer documents.
- Control
- Do not imply BYD or other OEM authorization.
- Gate
- Referral and supported-task matrix [bavaro].
25In the full report
Recommended service portfolio
Launch with low-complexity, evidence-rich tasks.
This section is in the full report.
26In the full report
Operating model
A managed partner bay preserves reversibility.
This section is in the full report.
27In the full report
Franchise model
Standalone rollout is deferred.
This section is in the full report.
28In the full report
Annual pilot economics
All values are EVS assumptions in nominal CVE.
This section is in the full report.
29In the full report
90-day pilot economics
Continuation requires the base gate.
This section is in the full report.
30In the full report
Risks
Thin demand, fragmentation and safety drive the model.
This section is in the full report.
31
Mitigations
Controls are documentary and auditable.
Mitigations
- Action
- Match active registration status, VIN, island, class and propulsion; de-duplicate dealer/insurer records.
- Owner
- Country lead
- Evidence
- Signed data memo.
- Action
- 15 paid/refundable bookings plus one paid trial or binding 8+ vehicle LOI.
- Owner
- Commercial lead
- Evidence
- Receipts/contracts.
- Action
- Two assessed technicians, supported-tool proof and rescue drill.
- Owner
- Technical lead
- Evidence
- Assessment records.
- Action
- Entity, tax, labour, site, electrical, fire, waste, data, consumer and insurer pack.
- Owner
- Legal/operations
- Evidence
- Written approvals.
- Action
- Cap irreversible spend at CVE5m and no pack inventory.
- Owner
- Board
- Evidence
- Approved purchase ledger.
32In the full report
90-day entry plan
No irreversible commitment before gate review.
This section is in the full report.
33In the full report
Go / no-go gates
All launch gates are open; standalone is no-go.
This section is in the full report.
34
Methodology
Source facts and EVS assumptions remain distinct.
Methodology
- Method
- Freeze geography and definitions
- Detail
- Passenger/LCV BEV/PHEV active status; do not mix light/all registrations, HEVs, motorcycles, stations, connectors or targets.
- Method
- Prioritize primary sources
- Detail
- Government, BOE, regulator, statistics, project closeout and official dealer evidence.
- Method
- Triangulate and label
- Detail
- Reconcile conflicting denominators and the ~200 station-ratio proxy versus 409 financed vehicles; distinguish stock, flow, targets and EVS assumptions.
- Method
- Size only what evidence supports
- Detail
- Current TAM null; directional stock proxy; executable SOM zero.
- Method
- Model reversible economics
- Detail
- Nominal CVE, VAT-exclusive, pre-tax; no grant, FX or financing benefit.
- Method
- Convert uncertainty to gates
- Detail
- Paid demand, capability, compliance, site and continuation thresholds.
35
Priority data requests
The first 30 days are denominator-led.
Priority data requests
- Gap
- Active BEV/PHEV passenger/LCV stock by island, class, age and owner type
- Owner
- DGTR/registry
- Decision Effect
- TAM, location and service demand.
- Gap
- Annual BEV/PHEV registrations by denominator and used/new status
- Owner
- DGTR/INE
- Decision Effect
- Adoption trend and forecast.
- Gap
- Station/site/connector/power/access/tariff/uptime asset register
- Owner
- TECV/ARME/operators
- Decision Effect
- Charging-service opportunity.
- Gap
- Dealer/model/VIN/warranty/service and parts volumes
- Owner
- Dealers/importers
- Decision Effect
- Supported scope and competition.
- Gap
- Authorized hazardous-battery carrier/recipient and inter-island route
- Owner
- Environment/maritime/fire/insurer
- Decision Effect
- Pack-work boundary.
- Gap
- Candidate site load, phase, earthing, protection and outages
- Owner
- Licensed engineer/EDEC
- Decision Effect
- Safe launch and cost.
36
Complete linked source register
Every source records publication/access information, classification, link and decision use.
Complete linked source register
- Publisher
- Government of Cabo Verde Climate Portal
- Publication Date
- 2025-06-26
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://portaldoclima.gov.cv/2025/06/26/mobilidade-eletrica-um-motor-de-mudanca-para-cabo-verde/
- Decision Use
- Primary source: 40 stations across all inhabited islands, about one public point per five EVs, 8% of 2024 new light-vehicle registrations, 25% fleet objective by 2030 and programme outcomes.
- Publisher
- Government of Cabo Verde Climate Portal
- Publication Date
- 2025-06-27
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://portaldoclima.gov.cv/en/2025/06/27/electric-mobility-an-engine-for-change-in-cabo-verde/
- Decision Use
- English government version used to cross-check the Portuguese primary source; definitions remain controlled by the source wording.
- Publisher
- Mitigation Action Facility
- Publication Date
- 2026-01-15
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://mitigation-action.org/news/electric-vehicles-reach-5-4-of-new-registrations-as-cabo-verde-project-concludes/
- Decision Use
- Project closeout states 409 EVs financed through the rebate programme across seven islands, 14 electric taxis, 40 stations, 73 professionals trained and EVs at 5.4% of all new registrations. Programme-financed cumulative flow is not active stock.
- Publisher
- Mitigation Action Facility
- Publication Date
- 2025-03-01
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://mitigation-action.org/news/cabo-verde-accelerates-electric-mobility-transition-with-support-from-the-mitigation-action-facility/
- Decision Use
- Project update reported 30 of 40 commercial stations and 7 of 55 private stations at that point; project-stage figures are not the final network census.
- Publisher
- Mitigation Action Facility
- Publication Date
- 2024-12-18
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://mitigation-action.org/news/maf-cabo-verde-electric-vehicles-project-mechanics-from-cabo-verdean-institutions-attend-training-of-trainers-tot-in-high-voltage-vehicle-maintenance/
- Decision Use
- Eleven technicians from institutions and dealers trained in Lisbon during 18–28 November 2024; this is training evidence, not a statutory national credential.
- Publisher
- Mitigation Action Facility
- Publication Date
- 2024-03-01
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://mitigation-action.org/news/first-training-on-road-rescue-involving-electric-vehicles-delivered-in-cabo-verde/
- Decision Use
- Thirty-six professionals including 28 firefighters trained in Santiago and Sal in February 2024; use as emergency-capacity evidence only.
- Publisher
- Mitigation Action Facility
- Publication Date
- 2025-12-01
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://mitigation-action.org/news/driving-climate-action-in-transport/
- Decision Use
- Project summary mentions public-institution EVs, charging outputs and people trained. Its 44-point wording is not substituted for the government final 40-station network.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2022-01-31
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/cabo-verde-esta-a-trabalhar-com-metas-pragmaticas-e-realistas-na-introducao-da-mobilidade-eletrica-no-pais-ministro-alexandre-monteiro/
- Decision Use
- Historical government baseline of about 100 EVs and acquisition-share objectives; not current active stock.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2022-11-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/primeiro-posto-de-carregamento-publico-para-veiculos-eletricos-instalado-na-ilha-do-sal/
- Decision Use
- Historical government article reported about 20 EVs on Sal, eight supported by ProMEC, and the planned 40-station national network.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2023-03-06
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/ministro-alexandre-monteiro-preside-ato-de-inauguracao-do-primeiro-posto-de-carregamento-de-veiculos-eletricos-da-enacol/
- Decision Use
- Primary evidence of an Enacol public charger in Praia; one site does not establish current uptime or connector count.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2020-12-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/projeto-promocao-de-veiculos-eletricos-em-cabo-verde-recebe-donativo-da-nama-facility/
- Decision Use
- Historical project budget and output targets, including roughly CVE792m grant support; targets are not completed market stock.
- Publisher
- RTP citing Cabo Verde authorities
- Publication Date
- 2023-10-12
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.rtp.pt/noticias/economia/cabo-verde-tera-carregadores-publicos-para-carros-eletricos-em-todas-as-ilhas-em-2024_n1520279
- Decision Use
- Secondary historical report: roughly 200 EVs, planned island allocation, TECV concession and CVE40/kWh tariff. Allocation and tariff require current operator confirmation.
- Publisher
- Expresso das Ilhas
- Publication Date
- 2024-04-12
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://expressodasilhas.cv/economia/2024/04/12/cabo-verde-instala-mais-de-20-carregadores-publicos-para-carros-eletricos-em-tres-ilhas/90881
- Decision Use
- Secondary deployment-stage report of more than 200 cars, over 130 co-financed and more than 230 applications; not an audited active-stock extract.
- Publisher
- Ministry of Finance, Cabo Verde
- Publication Date
- 2022-01-01
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.mf.gov.cv/-/a-taxa-espec%C3%ADfica-de-200-mil-escudos-n%C3%A3o-abrange-a-importa%C3%A7%C3%A3o-de-ve%C3%ADculos-com-idade-at%C3%A9-10-anos-no-%C3%A2mbito-do-regresso-definitivo-de-n%C3%A3o-residentes-emigrantes-
- Decision Use
- Official explanation of VAT, customs and excise exemptions for EVs and new charging equipment, parking exemption and exclusion from the CVE200,000 specific vehicle tax.
- Publisher
- PwC Worldwide Tax Summaries
- Publication Date
- 2026-05-29
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://taxsummaries.pwc.com/cabo-verde/corporate/tax-credits-and-incentives
- Decision Use
- Current professional summary corroborates EV and charging-equipment exemptions; obtain written customs/tax treatment for each VIN and HS code.
- Publisher
- PwC Portugal
- Publication Date
- 2026-01-08
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.pwc.pt/pt/pwcinforfisco/flash/cabo-verde/cabo-verde-orcamento-estado-2026.html
- Decision Use
- Professional summary of Law 69/X/2025 effective 1 January 2026, including a 20% general corporate income-tax rate.
- Publisher
- PwC Worldwide Tax Summaries
- Publication Date
- 2026-05-29
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://taxsummaries.pwc.com/Cabo-Verde/Corporate/Significant-developments
- Decision Use
- Professional update states the 2026 budget maintains electric-mobility incentives and the general corporate tax rate is 20%.
- Publisher
- PwC Worldwide Tax Summaries
- Publication Date
- 2026-05-29
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://taxsummaries.pwc.com/cabo-verde/individual/other-taxes
- Decision Use
- Professional summary reports employer INPS contribution 16%, employee 8.5% and standard VAT 15%; written local confirmation controls.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2024-12-30
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/ajuste-salario-minimo-2025/
- Decision Use
- Primary source: national minimum wage CVE17,000 and public-sector minimum CVE19,000 from 1 January 2025.
- Publisher
- Banco BAI Cabo Verde
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.bancobai.cv/particulares/produtos-e-servicos/solucoes-de-credito/credito-bai-mobilidade-eletrica
- Decision Use
- Current bank product page reports illustrative fixed 5.95% nominal rate and 6.87% APR; customer finance is not an EVS subsidy.
- Publisher
- Banco BAI Cabo Verde
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.bancobai.cv/empresas/produtos-e-servicos/solucoes-de-credito-1/credito-bai-mobilidade-eletrica-1
- Decision Use
- Current business finance page reports illustrative fixed 6.5% rate and 7.82% APR; terms require bank confirmation.
- Publisher
- UGPE Cabo Verde / World Bank
- Publication Date
- 2026-01-08
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://backend-ugpe.gov.cv/noticias/banco-mundial-reforca-apoio-a-transicao-energetica-e-ao-acesso-universal-em-cabo-verde/
- Decision Use
- Official project source reports 98% electricity coverage, financing package and a 100% renewable-energy ambition for 2040; site quality remains untested.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2026-01-02
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/empresas-e-os-cabo-verdianos-vao-pagar-cerca-de-7-menos-na-tarifa-de-eletricidade-em-2026/
- Decision Use
- Government announcement reports 2026 tariffs about 7% lower and 27% below 2024. Actual commercial tariff and demand charges require invoice verification.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2026-02-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/ministro-alexandre-monteiro-preside-5a-reuniao-do-comite-de-pilotagem-do-programa-de-apoio-a-transicao-energetica/
- Decision Use
- Government trajectory of more than 30% renewable in 2026, over 50% in 2030 and 100% in 2040; targets are not workshop supply evidence.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2024-01-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/anuncio-reforma-do-setor-eletrico-de-cabo-verde/
- Decision Use
- Official sector-restructuring context naming EPEC, EDEC and ONSEC; candidate connection counterparty and rules require current confirmation.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2020-03-23
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/View?id=45111
- Decision Use
- Primary legal route for low-voltage installation requirements; licensed engineering interpretation and current amendments control.
- Publisher
- Government of Cabo Verde
- Publication Date
- 2019-08-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.governo.cv/cabo-verde-tem-novo-codigo-de-rede-eletrica/
- Decision Use
- Official summary of Decree-Law 31/2019; obtain current connection and protection requirements from the competent entities.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2025-05-09
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/View/86958
- Decision Use
- Primary current-law route for road transport and road-code amendments; workshop and road-test applicability requires legal confirmation.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2022-06-10
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/Details/A2025/S1/BO77/23689
- Decision Use
- Official legal route referenced by the 2025 amendment; use counsel-confirmed consolidated text.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2020-04-13
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/View/45200
- Decision Use
- Primary vehicle-registration framework; EV registry extraction must preserve vehicle class, propulsion and active status.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2019-06-13
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/View/41940
- Decision Use
- Official electrical-equipment compliance route; exact tooling/EVSE scope requires conformity review.
- Publisher
- IGQPI
- Publication Date
- 2024-08-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://igqpi.cv/cabo-verde-adota-mais-9-normas-internacionais-da-iec/
- Decision Use
- Official standards-body article states 78 IEC standards had been adopted; exact EV/HV standards and legal effect must be checked individually.
- Publisher
- IGQPI
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://igqpi.cv/
- Decision Use
- Official route for national standards, conformity assessment and metrology.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2025-02-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/View/86058
- Decision Use
- Primary source for ARME responsibilities in energy and passenger transport regulation, inspection and licensing.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2020-04-19
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/View/45366
- Decision Use
- Primary domestic waste framework; hazardous traction batteries require separate written classification and recipient evidence.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2024-03-22
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/Details/A2024/S1/BO26/5675
- Decision Use
- Primary national implementation route for transboundary waste controls; approvals must precede traction-battery shipment.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2023-08-29
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/View/60672
- Decision Use
- Environmental-planning context only; obtain written project-specific screening from the competent environmental and municipal authorities.
- Publisher
- National Data Protection Commission
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.cnpd.cv/direitos/
- Decision Use
- Official route summarizing rights under Law 133/V/2001 as amended; service intake, VIN and telemetry processing must comply.
- Publisher
- National Data Protection Commission
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.cnpd.cv/obrigacoes/
- Decision Use
- Official compliance route for processing, security, notification/authorization and controller duties.
- Publisher
- Official Bulletin of Cabo Verde
- Publication Date
- 2021-03-16
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://boe.incv.cv/Bulletins/View/49460
- Decision Use
- Primary legal amendment route; obtain a current consolidated data-protection opinion for cloud diagnostics and transfers.
- Publisher
- Government of Cabo Verde
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.dge.gov.cv/
- Decision Use
- Official employment-administration route for contracts, employment policy and labour compliance inquiries.
- Publisher
- National Statistics Institute
- Publication Date
- 2026-04-27
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://ine.cv/divulgacao-detalhe/Publica%C3%A7%C3%B5es/4459
- Decision Use
- Official national statistical publication route; no decision-grade current BEV/PHEV stock or age table was extracted.
- Publisher
- Balai citing INE Cabo Verde
- Publication Date
- 2022-01-01
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.balai.cv/noticias/ine-cabo-verde-tinha-491-233-residentes-em-2021/
- Decision Use
- Secondary report of official census results, including Praia concentration; used only for regional context, not EV demand sizing.
- Publisher
- A Nação citing INE Cabo Verde
- Publication Date
- 2025-04-12
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.anacao.cv/noticia/2025/04/12/cabo-verde-acolheu-quase-12-milhoes-de-turistas-em-2024/
- Decision Use
- Secondary report of tourism scale and island shares; supports fleet interview priorities, not plug-in stock.
- Publisher
- Bávaro Motors
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.bavaro.cv/
- Decision Use
- Official dealer site lists brands including BYD, BMW, Nissan and Hyundai and advertises workshop/parts capability; no EV sales volume is published.
- Publisher
- Multimarcas Auto Cabo Verde
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://multimarcasauto.com/viaturas/nammi-box-01/
- Decision Use
- Current commercial listing for a new 100% electric model; listing is availability evidence, not a completed sale or active registration.
- Publisher
- Multimarcas Auto Cabo Verde
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://multimarcasauto.com/viaturas/icar-v23-2wd/
- Decision Use
- Current commercial listing for a 100 kW electric model; inventory and authorization require field verification.
- Publisher
- Golden Island BYD
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://goldenislandbyd.com/
- Decision Use
- Dealer self-description for São Vicente and Santo Antão with model listings; authorization, sales and after-sales scope require documentary verification.
- Publisher
- ISO
- Publication Date
- 2021-01-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.iso.org/standard/45477.html
- Decision Use
- International benchmark; Cabo Verde adoption and legal effect are not assumed.
- Publisher
- ISO
- Publication Date
- 2020-01-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.iso.org/standard/68474.html
- Decision Use
- International charging-safety benchmark; not a local electrical approval.
- Publisher
- IEC
- Publication Date
- 2017-02-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://webstore.iec.ch/en/publication/33644
- Decision Use
- International EVSE benchmark; exact Cabo Verde adoption must be confirmed through IGQPI.
- Publisher
- UNECE
- Publication Date
- 2022-03-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://unece.org/transport/documents/2022/03/standards/un-regulation-no-100-rev3
- Decision Use
- Vehicle electric-powertrain safety benchmark; national applicability requires confirmation.
- Publisher
- UNECE
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://unece.org/transport/dangerous-goods/rev8-files
- Decision Use
- Battery transport testing framework; carrier and competent-authority approvals remain necessary.
- Publisher
- International Labour Organization
- Publication Date
- 2001-01-01
- Accessed At
- 2026-08-11
- Classification
- Primary / authoritative
- Url
- https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001
- Decision Use
- Management-system benchmark; not a substitute for Cabo Verde labour, fire and electrical law.
- Publisher
- Basel Convention Secretariat
- Publication Date
- —
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.basel.int/TheConvention/Overview/TextoftheConvention/tabid/1275/Default.aspx
- Decision Use
- International hazardous-waste movement framework; Cabo Verde competent-authority procedure controls.
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Classification
- Professional, project or secondary corroboration
- Url
- https://www.evsworldwide.com/
- Decision Use
- All gates, market sensitivities and economics are EVS assumptions unless explicitly attributed to another source.
Method / Sources and confidence
Where every figure
comes from.
Registrations, charging and legal requirements are read from primary sources. Where no official dataset exists, the model and its assumptions are published instead of a single unexplained number. This report is a dated snapshot: August 2026.
- 01Electric mobility: an engine for change in Cabo Verde
- 02Electric mobility: an engine for change in Cabo Verde
- 03Electric vehicles reach 5.4% of new registrations as Cabo Verde project concludes
- 04Cabo Verde accelerates electric mobility transition
- 05Mechanics attend training of trainers in high-voltage vehicle maintenance
- 06First training on road rescue involving electric vehicles delivered
- 07Driving climate action in transport
- 08Cabo Verde works with pragmatic electric-mobility targets
- 09First public EV charging station installed on Sal
- 10First Enacol EV charging station inaugurated
- 11Electric vehicle promotion project receives NAMA Facility grant
- 12Public EV chargers planned for every island
- 13More than 20 public chargers installed on three islands
- 14Tax treatment of vehicle imports and electric mobility
- 15Cabo Verde corporate tax credits and incentives
- 16Cabo Verde State Budget 2026
- 17Cabo Verde significant tax developments
- 18Cabo Verde individual other taxes
- 19Adjustment of national minimum wage for 2025
- 20BAI electric mobility credit for individuals
- 21BAI electric mobility credit for businesses
- 22World Bank reinforces energy transition and universal access support
- 23Electricity tariffs approximately 7% lower in 2026
- 24Energy transition programme steering committee
- 25Reform of Cabo Verde electricity sector announced
- 26Decree-Law 15/2020: low-voltage electrical installations
- 27New Cabo Verde electricity grid code
- 28Decree-Law 27/2025 amending motorized transport and road code
- 29Decree-Law 19/2022 general motorized transport regime
- 30Decree-Law 19/2020 vehicle registration code
- 31Decree-Law 25/2019 electrical equipment labelling
- 32Cabo Verde adopts nine more IEC international standards
- 33Institute for Quality Management and Intellectual Property
- 34ARME organic and regulatory framework
- 35Decree-Law 26/2020 urban-waste regime
- 36Decree-Law 15/2024 implementing Basel waste-transfer obligations
- 37Decree-Law 23/2023 strategic environmental assessment
- 38Data-subject rights in Cabo Verde
- 39Controller obligations in Cabo Verde
- 402021 amendment to personal-data legislation
- 41Directorate-General for Employment
- 42Cabo Verde Statistical Yearbook 2023
- 43Cabo Verde had 491,233 residents in 2021
- 44Cabo Verde received nearly 1.2 million hotel guests in 2024
- 45Bávaro Motors Cabo Verde
- 46Dongfeng Nammi Box 01 listing
- 47iCar V23 2WD listing
- 48Golden Island BYD Cabo Verde
- 49ISO 6469-3 electrically propelled road vehicles—electrical safety
- 50ISO 17409 conductive power transfer—safety requirements
- 51IEC 61851-1 electric vehicle conductive charging system
- 52UN Regulation No. 100 Rev.3
- 53UN Manual of Tests and Criteria, Rev.8
- 54ILO-OSH 2001 guidelines
- 55Basel Convention text
- 56EVS Cabo Verde decision model
Reports are commercial research, not legal, tax or investment advice.
Get the full Cabo Verde report
The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.
Other markets in Africa.
Compare these markets04 / Not in your country yet?
Bring EVS
to your market.
Tell us your territory. We'll send the market research alongside the franchise pack and connect you with the team behind every EVS centre.