Côte d'Ivoire
EVS Côte d'Ivoire EV Service Centre Market Entry
Decision-grade Côte d'Ivoire assessment separating passenger/light-commercial plug-in data gaps, all-vehicle parc, brand/distributor flows, conflicting policy-target definitions, one-site charging evidence, announced networks and EVS assumptions.
No current authoritative passenger BEV/PHEV stock series located.
Official lower bound for all road vehicles; not EV TAM.
Published count at one Yopougon site, not national total.
Only after 750 separated active Greater Abidjan passenger/light-commercial plug-ins.
Partner-clinic assumption on XOF45m reversible capex.
The verdict in full
Evidence, assumptions and operational implications are separated below.
Market headline
Evidence, assumptions and operational implications are separated below.
Market headline
| Metric | Value | Unit | Period | Status |
|---|---|---|---|---|
| Current passenger BEV/PHEV stock | — | vehicles | Current | No authoritative separated registration series located. |
| All-vehicle road parc | 1,200,000 | vehicles, lower bound | June 2026 | Official source says more than 1.2m; no propulsion split [transport_parc_2026]. |
| Verified published chargers at one Yopougon site | 13 | charger units | June 2025 | One site only; AIP power-unit wording requires field check [charging_yopougon]. |
| Gate-planning SAM | 486 | jobs/year | EVS model | Activates only after 750 separated active Greater Abidjan passenger/light-commercial BEV/PHEVs. |
- Value
- —
- Unit
- vehicles
- Period
- Current
- Status
- No authoritative separated registration series located.
- Value
- 1,200,000
- Unit
- vehicles, lower bound
- Period
- June 2026
- Status
- Official source says more than 1.2m; no propulsion split [transport_parc_2026].
- Value
- 13
- Unit
- charger units
- Period
- June 2025
- Status
- One site only; AIP power-unit wording requires field check [charging_yopougon].
- Value
- 486
- Unit
- jobs/year
- Period
- EVS model
- Status
- Activates only after 750 separated active Greater Abidjan passenger/light-commercial BEV/PHEVs.
Macroeconomic context
Evidence, assumptions and operational implications are separated below.
Macroeconomic context
| Metric | Value | Unit | Period | Scope |
|---|---|---|---|---|
| Real GDP growth | 6 | % | 2024 | World Bank current country overview [worldbank_country]. |
- Value
- 6
- Unit
- %
- Period
- 2024
- Scope
- World Bank current country overview [worldbank_country].
Market size and vehicle parc context
No current authoritative passenger/light-commercial plug-in denominator was located. All-vehicle parc and brand sales are kept out of TAM.
Market size and vehicle parc context
| Metric | Value | Unit | Period | Scope |
|---|---|---|---|---|
| All-vehicle road parc | 1,200,000 | vehicles, lower bound | June 2026 | Official page says more than 1.2m; passenger, commercial, two-wheel and propulsion composition not given [transport_parc_2026]. |
| Distributor new-vehicle sales | 29,995 | vehicles | 2025 | Company-report market total relayed by secondary source; all powertrains [abidjan_eco_cfao] [brvm_cfao_2025]. |
| Distributor new-vehicle sales | 26,271 | vehicles | 2024 | All powertrains; company-report relay [abidjan_eco_cfao] [brvm_cfao_2025]. |
| BYD distributor sales | 51 | vehicles | 2025 | One brand/distributor; BEV/PHEV mix not split and not active stock [abidjan_eco_cfao]. |
| BYD distributor sales | 15 | vehicles | 2024 | One brand/distributor; not total EV sales [abidjan_eco_cfao]. |
- Value
- 1,200,000
- Unit
- vehicles, lower bound
- Period
- June 2026
- Scope
- Official page says more than 1.2m; passenger, commercial, two-wheel and propulsion composition not given [transport_parc_2026].
- Value
- 29,995
- Unit
- vehicles
- Period
- 2025
- Scope
- Company-report market total relayed by secondary source; all powertrains [abidjan_eco_cfao] [brvm_cfao_2025].
- Value
- 26,271
- Unit
- vehicles
- Period
- 2024
- Scope
- All powertrains; company-report relay [abidjan_eco_cfao] [brvm_cfao_2025].
- Value
- 51
- Unit
- vehicles
- Period
- 2025
- Scope
- One brand/distributor; BEV/PHEV mix not split and not active stock [abidjan_eco_cfao].
- Value
- 15
- Unit
- vehicles
- Period
- 2024
- Scope
- One brand/distributor; not total EV sales [abidjan_eco_cfao].
BEV/PHEV sales, stock and adoption history
No annual national passenger BEV/PHEV sales or active-stock series was found. Brand flows are ecosystem signals, not registration history.
Observed market signals kept outside passenger TAM
All-vehicle parc, distributor market and BYD flows use different definitions.
BEV/PHEV sales, stock and adoption history
| Period | Passenger Bev Sales | Passenger Phev Sales | Active Passenger Bev Phev | Other Evidence |
|---|---|---|---|---|
| 2023 | — | — | — | No authoritative separated national series located. |
| 2024 | — | — | — | BYD launched through LOXEA; 15 BYD sales company-reported, unsplit by BEV/PHEV [cfao_byd_launch] [abidjan_eco_cfao]. |
| 2025 | — | — | — | 51 BYD sales company-reported, unsplit by BEV/PHEV; Tang availability and Yopougon charging milestone [aip_byd_tang] [charging_yopougon]. |
| 2026 | — | — | — | Policy/skills project active; no current national registration extract [transport_ev_training]. |
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- No authoritative separated national series located.
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- BYD launched through LOXEA; 15 BYD sales company-reported, unsplit by BEV/PHEV [cfao_byd_launch] [abidjan_eco_cfao].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- 51 BYD sales company-reported, unsplit by BEV/PHEV; Tang availability and Yopougon charging milestone [aip_byd_tang] [charging_yopougon].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- Policy/skills project active; no current national registration extract [transport_ev_training].
Definition reconciliation
Evidence, assumptions and operational implications are separated below.
Definition reconciliation
| Term | Treatment | Reason |
|---|---|---|
| Passenger/light-commercial BEV/PHEV sales and active stock | Null | No authoritative annual or active-status series located. |
| More than 1.2m road vehicles | All-vehicle lower bound only | No passenger/commercial, two-wheel or propulsion split [transport_parc_2026]. |
| BYD 15 / 51 sales | Brand/distributor flow proxy | Not national EV total; BEV/PHEV mix and active status not published [abidjan_eco_cfao]. |
| 10% EV by 2030 | Definition-conflicted policy target | June 2026 ministry page says national fleet; 2025 government relay says State fleet [transport_ev_training] [state_target]. |
| 13 Yopougon chargers | Verified published site inventory only | Not a national connector census; source uses kWh for charger rating [charging_yopougon]. |
| Every 150 km charging network | Announced plan | Private plan reported by AIP; not delivered infrastructure [charging_plan]. |
- Treatment
- Null
- Reason
- No authoritative annual or active-status series located.
- Treatment
- All-vehicle lower bound only
- Reason
- No passenger/commercial, two-wheel or propulsion split [transport_parc_2026].
- Treatment
- Brand/distributor flow proxy
- Reason
- Not national EV total; BEV/PHEV mix and active status not published [abidjan_eco_cfao].
- Treatment
- Definition-conflicted policy target
- Reason
- June 2026 ministry page says national fleet; 2025 government relay says State fleet [transport_ev_training] [state_target].
- Treatment
- Verified published site inventory only
- Reason
- Not a national connector census; source uses kWh for charger rating [charging_yopougon].
- Treatment
- Announced plan
- Reason
- Private plan reported by AIP; not delivered infrastructure [charging_plan].
Cautious / base / high adoption cases
These are policy-target realisation shares, not vehicle-stock forecasts. Absolute 2030 vehicles remain null because target scope and denominator conflict.
Cautious / base / high adoption cases
| Scenario | Ev Share 2030 Pct | Vehicles 2030 | Interpretation |
|---|---|---|---|
| Cautious | 2.5 | — | EVS 25% realisation of the 10% policy objective; absolute vehicles unavailable because target scope and 2030 denominator conflict. |
| Base | 5 | — | EVS 50% policy-realisation sensitivity; not a current-stock forecast. |
| High | 10 | — | Full policy objective; stress case only [transport_ev_training] [state_target]. |
- Ev Share 2030 Pct
- 2.5
- Vehicles 2030
- —
- Interpretation
- EVS 25% realisation of the 10% policy objective; absolute vehicles unavailable because target scope and 2030 denominator conflict.
- Ev Share 2030 Pct
- 5
- Vehicles 2030
- —
- Interpretation
- EVS 50% policy-realisation sensitivity; not a current-stock forecast.
- Ev Share 2030 Pct
- 10
- Vehicles 2030
- —
- Interpretation
- Full policy objective; stress case only [transport_ev_training] [state_target].
Charging infrastructure
The only source-backed installed count used is 13 charger units at one Yopougon site. It is not a national census and rating units require verification.
2030 policy-objective realisation sensitivities
EVS shares; absolute vehicles remain null.
Charging infrastructure
| Metric | Value | Unit | Evidence |
|---|---|---|---|
| Authoritative national public connectors | — | connectors | No auditable connector/power/access/uptime census located. |
| Yopougon Petro-Ivoire fast chargers | 3 | charger units | AIP reports “60 kWh”; likely rating-unit ambiguity, not silently corrected [charging_yopougon]. |
| Yopougon Petro-Ivoire slow chargers | 10 | charger units | AIP reports “22 kWh”; verify power, connectors, access and uptime [charging_yopougon]. |
| Yopougon solar/storage production | 620 | kWh/day | Site claim reported by AIP [charging_yopougon]. |
| National-highway interval plan | 150 | km | Private deployment intent only [charging_plan]. |
| Site electricity tariff | — | XOF/kWh plus charges | Obtain current CIE/ANARE professional category, subscribed-power and demand-charge quote [anare]. |
- Value
- —
- Unit
- connectors
- Evidence
- No auditable connector/power/access/uptime census located.
- Value
- 3
- Unit
- charger units
- Evidence
- AIP reports “60 kWh”; likely rating-unit ambiguity, not silently corrected [charging_yopougon].
- Value
- 10
- Unit
- charger units
- Evidence
- AIP reports “22 kWh”; verify power, connectors, access and uptime [charging_yopougon].
- Value
- 620
- Unit
- kWh/day
- Evidence
- Site claim reported by AIP [charging_yopougon].
- Value
- 150
- Unit
- km
- Evidence
- Private deployment intent only [charging_plan].
- Value
- —
- Unit
- XOF/kWh plus charges
- Evidence
- Obtain current CIE/ANARE professional category, subscribed-power and demand-charge quote [anare].
Grid and energy readiness
Evidence, assumptions and operational implications are separated below.
Grid and energy readiness
| Indicator | Value | Unit | Status |
|---|---|---|---|
| Songon planned combined-cycle capacity | 372 | MW | Financed project announced June 2026; not current feeder capacity [energy_project]. |
| Energy audit applicability | — | legal threshold | Confirm whether selected clinic falls within mandatory-audit scope [energy_audits]. |
| Workshop feeder capacity/reliability | — | kVA / outage record | Site study required; national projects do not prove premises capacity. |
- Value
- 372
- Unit
- MW
- Status
- Financed project announced June 2026; not current feeder capacity [energy_project].
- Value
- —
- Unit
- legal threshold
- Status
- Confirm whether selected clinic falls within mandatory-audit scope [energy_audits].
- Value
- —
- Unit
- kVA / outage record
- Status
- Site study required; national projects do not prove premises capacity.
Vehicle parc age and service demand
Evidence, assumptions and operational implications are separated below.
Vehicle parc age and service demand
| Indicator | Value | Unit | Implication |
|---|---|---|---|
| Passenger plug-ins by age, warranty and location | — | vehicles | No service-demand denominator; matched registration/import/service extract required. |
| All-vehicle parc lower bound | 1,200,000 | vehicles | Large conventional parc supports partner-workshop ecosystem, not EV TAM [transport_parc_2026]. |
| Passenger/taxi import-age ceiling | 5 | years | Constrains legal used-import age; imported EVs over one year also need technical certificate [customs_age] [decree_ch1]. |
| Distributor new-vehicle market | 29,995 | vehicles in 2025 | Commercial-scale new-car channel; EV share unavailable [abidjan_eco_cfao]. |
| BYD distributor flow | 51 | vehicles in 2025 | Early adoption signal, not sufficient standalone-centre denominator [abidjan_eco_cfao]. |
- Value
- —
- Unit
- vehicles
- Implication
- No service-demand denominator; matched registration/import/service extract required.
- Value
- 1,200,000
- Unit
- vehicles
- Implication
- Large conventional parc supports partner-workshop ecosystem, not EV TAM [transport_parc_2026].
- Value
- 5
- Unit
- years
- Implication
- Constrains legal used-import age; imported EVs over one year also need technical certificate [customs_age] [decree_ch1].
- Value
- 29,995
- Unit
- vehicles in 2025
- Implication
- Commercial-scale new-car channel; EV share unavailable [abidjan_eco_cfao].
- Value
- 51
- Unit
- vehicles in 2025
- Implication
- Early adoption signal, not sufficient standalone-centre denominator [abidjan_eco_cfao].
EVS assumptions
Evidence, assumptions and operational implications are separated below.
EVS assumptions
| Assumption | Value | Unit | Basis |
|---|---|---|---|
| Greater Abidjan launch threshold | 750 | registered active passenger/light-commercial BEV/PHEV | EVS density gate, not estimate. |
| Active/available factor | 0.9 | share | EVS planning haircut after registry proof. |
| Independent reach | 0.6 | share | After captive, warranty and unsupported-VIN screening. |
| Service events | 1.2 | jobs/vehicle/year | EVS blended diagnostic/chassis assumption. |
| Average repair order | 275,000 | XOF/job | Replace with paid Côte d’Ivoire observations. |
| Reversible capex ceiling | 45,000,000 | XOF | EVS board gate. |
| Executable SOM before gates | 0 | jobs | Deliberately zero. |
- Value
- 750
- Unit
- registered active passenger/light-commercial BEV/PHEV
- Basis
- EVS density gate, not estimate.
- Value
- 0.9
- Unit
- share
- Basis
- EVS planning haircut after registry proof.
- Value
- 0.6
- Unit
- share
- Basis
- After captive, warranty and unsupported-VIN screening.
- Value
- 1.2
- Unit
- jobs/vehicle/year
- Basis
- EVS blended diagnostic/chassis assumption.
- Value
- 275,000
- Unit
- XOF/job
- Basis
- Replace with paid Côte d’Ivoire observations.
- Value
- 45,000,000
- Unit
- XOF
- Basis
- EVS board gate.
- Value
- 0
- Unit
- jobs
- Basis
- Deliberately zero.
Transparent TAM / SAM / SOM
National passenger TAM is deliberately null and executable SOM is zero. The quantified Greater Abidjan opportunity activates only after a matched registry gate.
Transparent TAM / SAM / SOM
| Layer | Vehicles | Jobs Per Year | Revenue Xof | Status |
|---|---|---|---|---|
| National passenger/light-commercial plug-in TAM | — | — | — | Not quantified: current active BEV/PHEV denominator unavailable. |
| All-road-vehicle context | 1,200,000 | — | — | Lower-bound all-powertrain parc; excluded from EV TAM [transport_parc_2026]. |
| Greater Abidjan gate SAM | 405 | 486 | 133,650,000 | 750 separated registrations × 90% active × 60% reach × 1.20 events. |
- Vehicles
- —
- Jobs Per Year
- —
- Revenue Xof
- —
- Status
- Not quantified: current active BEV/PHEV denominator unavailable.
- Vehicles
- 1,200,000
- Jobs Per Year
- —
- Revenue Xof
- —
- Status
- Lower-bound all-powertrain parc; excluded from EV TAM [transport_parc_2026].
- Vehicles
- 405
- Jobs Per Year
- 486
- Revenue Xof
- 133,650,000
- Status
- 750 separated registrations × 90% active × 60% reach × 1.20 events.
Customer and fleet segments
Evidence, assumptions and operational implications are separated below.
Customer and fleet segments
| Segment | Need | Priority |
|---|---|---|
| Private early adopters and lawful used imports | Pre-purchase report, scan, charging, 12V and chassis evidence | High only for supported VINs. |
| Corporate, rental, bank and hospitality fleets | Route/charging readiness and condition reporting | Highest through paid fleet trial [cfao_byd_launch]. |
| Ride-hailing and taxi operators | Uptime inspections, tyres, brakes and charging evidence | High after VIN-level active-fleet proof. |
| Public/State fleets | Tender-compliant reporting, charging and uptime SLAs | Contract only; State-fleet target definition may apply [state_target]. |
| Electric two/three-wheelers | Different tools, parts and battery logistics | Separate future workstream; excluded from passenger TAM. |
| Heavy electric buses | Depot tools, lifts, HV and OEM contract | Excluded from Phase 1; contract-only. |
- Need
- Pre-purchase report, scan, charging, 12V and chassis evidence
- Priority
- High only for supported VINs.
- Need
- Route/charging readiness and condition reporting
- Priority
- Highest through paid fleet trial [cfao_byd_launch].
- Need
- Uptime inspections, tyres, brakes and charging evidence
- Priority
- High after VIN-level active-fleet proof.
- Need
- Tender-compliant reporting, charging and uptime SLAs
- Priority
- Contract only; State-fleet target definition may apply [state_target].
- Need
- Different tools, parts and battery logistics
- Priority
- Separate future workstream; excluded from passenger TAM.
- Need
- Depot tools, lifts, HV and OEM contract
- Priority
- Excluded from Phase 1; contract-only.
Leading EV brands and models
Evidence, assumptions and operational implications are separated below.
Leading EV brands and models
| Brand | Model | Powertrain | Signal |
|---|---|---|---|
| BYD | Atto 3 / Dolphin / Dolphin Mini | BEV | Official LOXEA launch and aftersales ecosystem; no national volume split [cfao_byd_launch]. |
| BYD | Tang | BEV | Local availability reported by AIP [aip_byd_tang]. |
| BYD | Song Plus | PHEV by local media; VIN verification required | Do not infer PHEV volumes from aggregate BYD sales. |
| MG | Cyberster | BEV | Official dealer catalogue; no stock or sales volume disclosed [mg_models]. |
| MG | MG 3/HS/ZS Hybrid+ | HEV unless plug-in homologation proves otherwise | Exclude from PHEV stock [mg_models]. |
| ORA / mixed parallel imports | Unranked | BEV/PHEV by VIN | Market presence requires distributor, registration and tool-support audit. |
- Model
- Atto 3 / Dolphin / Dolphin Mini
- Powertrain
- BEV
- Signal
- Official LOXEA launch and aftersales ecosystem; no national volume split [cfao_byd_launch].
- Model
- Tang
- Powertrain
- BEV
- Signal
- Local availability reported by AIP [aip_byd_tang].
- Model
- Song Plus
- Powertrain
- PHEV by local media; VIN verification required
- Signal
- Do not infer PHEV volumes from aggregate BYD sales.
- Model
- Cyberster
- Powertrain
- BEV
- Signal
- Official dealer catalogue; no stock or sales volume disclosed [mg_models].
- Model
- MG 3/HS/ZS Hybrid+
- Powertrain
- HEV unless plug-in homologation proves otherwise
- Signal
- Exclude from PHEV stock [mg_models].
- Model
- Unranked
- Powertrain
- BEV/PHEV by VIN
- Signal
- Market presence requires distributor, registration and tool-support audit.
Independent and OEM competitors
Evidence, assumptions and operational implications are separated below.
Independent and OEM competitors
| Competitor | Type | Footprint | Threat | Response |
|---|---|---|---|---|
| LOXEA / CFAO / BYD | OEM-backed sale, rental, service, parts and charging | Airport/Abidjan and corporate fleet channel | High for warranty vehicles | Out-of-warranty, referral and overflow scope only [cfao_byd_launch]. |
| MG / HR Motors | OEM-backed sales and authorised aftersales | Zone 4, Boulevard de Marseille and Bingerville/Abatta | High for MG warranty vehicles | Supported non-warranty scope and referral [mg_service]. |
- Type
- OEM-backed sale, rental, service, parts and charging
- Footprint
- Airport/Abidjan and corporate fleet channel
- Threat
- High for warranty vehicles
- Response
- Out-of-warranty, referral and overflow scope only [cfao_byd_launch].
- Type
- OEM-backed sales and authorised aftersales
- Footprint
- Zone 4, Boulevard de Marseille and Bingerville/Abatta
- Threat
- High for MG warranty vehicles
- Response
- Supported non-warranty scope and referral [mg_service].
Priority cities and regions
Evidence, assumptions and operational implications are separated below.
Priority cities and regions
| Rank | Region | Rationale | Mode |
|---|---|---|---|
| 1 | Greater Abidjan: Cocody–Marcory/Zone 4–Yopougon–Airport corridor | Only evidenced OEM, corporate, charging and high-density mobility ecosystem [charging_yopougon] [cfao_byd_launch]. | Only candidate for scheduled partner clinic. |
- Region
- Greater Abidjan: Cocody–Marcory/Zone 4–Yopougon–Airport corridor
- Rationale
- Only evidenced OEM, corporate, charging and high-density mobility ecosystem [charging_yopougon] [cfao_byd_launch].
- Mode
- Only candidate for scheduled partner clinic.
Consumer incentives and policy
Evidence, assumptions and operational implications are separated below.
Consumer incentives and policy
| Instrument | Status | Action |
|---|---|---|
| EV purchase cash grant | No current official general consumer grant verified | Assume zero. |
| Automatic EV customs/VAT exemption | Not created by Decree 2024-326; Article 24 uses ordinary investment regime | Obtain written Customs/DGI ruling; assume zero [decree_ch3]. |
- Status
- No current official general consumer grant verified
- Action
- Assume zero.
- Status
- Not created by Decree 2024-326; Article 24 uses ordinary investment regime
- Action
- Obtain written Customs/DGI ruling; assume zero [decree_ch3].
Business, tax and investment incentives
Decree 2024-326 keeps EV investment under ordinary investment law. No automatic exemption, grant or approval is assumed.
Business, tax and investment incentives
| Item | Rate | Treatment |
|---|---|---|
| Standard VAT | Current rate not hard-coded in economics | Model is VAT-exclusive; obtain current DGI advice for services, parts and recovery. |
| Business-profit tax | 25% per DGI analysis of 2025 tax annex | Pre-tax model; confirm entity-specific current rate and minimum taxes [dgi_tax_2025]. |
- Rate
- Current rate not hard-coded in economics
- Treatment
- Model is VAT-exclusive; obtain current DGI advice for services, parts and recovery.
- Rate
- 25% per DGI analysis of 2025 tax annex
- Treatment
- Pre-tax model; confirm entity-specific current rate and minimum taxes [dgi_tax_2025].
Labour, licensing and workshop regulation
Every material approval is a launch gate; this is not legal, tax, engineering or insurance advice.
Labour, licensing and workshop regulation
| Gate | Authority | Evidence |
|---|---|---|
| Entity, IDU, tax and payroll | CEPICI / DGI / CNPS | Legal entity, RCCM/IDU, tax account and first-day worker declarations [service_idu] [cnps_employer]. |
| EV repair authorisation and competence | Transport / Commerce / vocational-training ministries | Legal entity, qualified staff and appropriate technical equipment; obtain Article 25 implementing order [decree_ch3]. |
- Authority
- CEPICI / DGI / CNPS
- Evidence
- Legal entity, RCCM/IDU, tax account and first-day worker declarations [service_idu] [cnps_employer].
- Authority
- Transport / Commerce / vocational-training ministries
- Evidence
- Legal entity, qualified staff and appropriate technical equipment; obtain Article 25 implementing order [decree_ch3].
High-voltage controls
Evidence, assumptions and operational implications are separated below.
High-voltage controls
| Control | Evidence |
|---|---|
| VIN/powertrain whitelist | Classify BEV, PHEV, HEV, MHEV, buses and conversions before booking. |
| Task-specific authorisation | Named technician, competence assessment, scope, expiry and supervision; local Article 25 controls [decree_ch3]. |
| Safe de-energisation | OEM procedure, lock/tag, proved tester and absence-of-voltage record [iso_6469]. |
| Controlled work zone | Barriers, insulated PPE/tools, rescue equipment and no lone HV work [ilo_osh]. |
| Charging interface | Licensed electrical work; IEC 61851/ISO 17409 as benchmarks only [iec_61851] [iso_17409]. |
| Release evidence | Pre/post scan, restoration, torque/QC, limitations and customer sign-off. |
- Evidence
- Classify BEV, PHEV, HEV, MHEV, buses and conversions before booking.
- Evidence
- Named technician, competence assessment, scope, expiry and supervision; local Article 25 controls [decree_ch3].
- Evidence
- OEM procedure, lock/tag, proved tester and absence-of-voltage record [iso_6469].
- Evidence
- Barriers, insulated PPE/tools, rescue equipment and no lone HV work [ilo_osh].
- Evidence
- Licensed electrical work; IEC 61851/ISO 17409 as benchmarks only [iec_61851] [iso_17409].
- Evidence
- Pre/post scan, restoration, torque/QC, limitations and customer sign-off.
Battery and waste controls
Evidence, assumptions and operational implications are separated below.
Battery and waste controls
| Stage | Rule | Route |
|---|---|---|
| Intact in-vehicle traction pack | Non-invasive diagnostics only | No opening, removal or routine storage. |
| Suspect/damaged pack arrival | Refuse routine indoor custody | Emergency/OEM/insurer and Environment Ministry plan. |
- Rule
- Non-invasive diagnostics only
- Route
- No opening, removal or routine storage.
- Rule
- Refuse routine indoor custody
- Route
- Emergency/OEM/insurer and Environment Ministry plan.
Recommended service portfolio
Evidence, assumptions and operational implications are separated below.
Recommended service portfolio
| Phase | Service | Include | Exclude |
|---|---|---|---|
| Launch | VIN-classified diagnostic scan | DTC/live data/12V/charge evidence | Secure coding, unsupported models or warranty decisions. |
| Launch | Pre-purchase EV condition report | Visual, scan, charging, thermal observation and chassis | Guaranteed battery capacity/life. |
| Launch | Charging and low-voltage triage | Cable, inlet, EVSE interface and 12V | Grid/electrical work without approved partner. |
| Launch | Tyres, brakes, suspension and alignment | EV load/torque evidence | Unsupported ADAS calibration. |
| Fleet | Corporate/rental/taxi uptime inspection | Paid fleet trial and SLA evidence | OEM HV warranty. |
| Fleet | Mobile collection and documented triage | Greater Abidjan only | Roadside HV intrusion. |
| Hold | Traction-pack/module work | None | Opening, removal, transport or custody. |
- Service
- VIN-classified diagnostic scan
- Include
- DTC/live data/12V/charge evidence
- Exclude
- Secure coding, unsupported models or warranty decisions.
- Service
- Pre-purchase EV condition report
- Include
- Visual, scan, charging, thermal observation and chassis
- Exclude
- Guaranteed battery capacity/life.
- Service
- Charging and low-voltage triage
- Include
- Cable, inlet, EVSE interface and 12V
- Exclude
- Grid/electrical work without approved partner.
- Service
- Tyres, brakes, suspension and alignment
- Include
- EV load/torque evidence
- Exclude
- Unsupported ADAS calibration.
- Service
- Corporate/rental/taxi uptime inspection
- Include
- Paid fleet trial and SLA evidence
- Exclude
- OEM HV warranty.
- Service
- Mobile collection and documented triage
- Include
- Greater Abidjan only
- Exclude
- Roadside HV intrusion.
- Service
- Traction-pack/module work
- Include
- None
- Exclude
- Opening, removal, transport or custody.
Operating model
Evidence, assumptions and operational implications are separated below.
Operating model
| Element | Recommendation |
|---|---|
| Format | Scheduled clinic days in one compliant Greater Abidjan partner workshop. |
| Ownership | Côte d’Ivoire legal entity or joint venture with accountable local operator and Article 25 evidence. |
| Territory/franchise | No franchise sale or exclusivity before 12 months of paid evidence. |
| Staffing | One assessed HV lead plus one technician; shared reception and approved electrical/waste partners. |
| Technology | Supported VIN/task matrix, lawful service information and evidence-grade job files. |
| Commercial | XOF menu pricing, deposits and paid fleet trials; no free-diagnostic demand proxy. |
| Expansion | Bingerville/Bassam collection day only after Greater Abidjan continuation gate. |
- Recommendation
- Scheduled clinic days in one compliant Greater Abidjan partner workshop.
- Recommendation
- Côte d’Ivoire legal entity or joint venture with accountable local operator and Article 25 evidence.
- Recommendation
- No franchise sale or exclusivity before 12 months of paid evidence.
- Recommendation
- One assessed HV lead plus one technician; shared reception and approved electrical/waste partners.
- Recommendation
- Supported VIN/task matrix, lawful service information and evidence-grade job files.
- Recommendation
- XOF menu pricing, deposits and paid fleet trials; no free-diagnostic demand proxy.
- Recommendation
- Bingerville/Bassam collection day only after Greater Abidjan continuation gate.
Franchise pathway
Evidence, assumptions and operational implications are separated below.
Franchise pathway
| Stage | Structure | Capital | Royalty | Gate |
|---|---|---|---|---|
| 0–90 days | EVS-managed partner clinic | Reversible tools only | None; direct pilot control | All compliance, demand and safety gates. |
| 3–12 months | Licensed operating affiliate / managed JV | Evidence-led | Negotiate after unit economics | 12 months paid data and audit. |
| After 12 months | Possible franchise prototype | Capped per validated density | Only with support/parts/software SLAs | No territory sale before replicated profitability. |
- Structure
- EVS-managed partner clinic
- Capital
- Reversible tools only
- Royalty
- None; direct pilot control
- Gate
- All compliance, demand and safety gates.
- Structure
- Licensed operating affiliate / managed JV
- Capital
- Evidence-led
- Royalty
- Negotiate after unit economics
- Gate
- 12 months paid data and audit.
- Structure
- Possible franchise prototype
- Capital
- Capped per validated density
- Royalty
- Only with support/parts/software SLAs
- Gate
- No territory sale before replicated profitability.
Pilot steady-state economics
All volumes, prices, margins, costs and capex are EVS assumptions in nominal XOF, VAT-exclusive and pre-tax.
Pilot steady-state economics
| Scenario | Jobs | Aro Xof | Gross Margin Pct | Opex Xof | Revenue Xof | Gross Profit Xof | Ebitda Xof | Payback Years |
|---|---|---|---|---|---|---|---|---|
| Cautious | 70 | 225,000 | 55 | 9,000,000 | 15,750,000 | 8,662,500 | -337,500 | — |
- Jobs
- 70
- Aro Xof
- 225,000
- Gross Margin Pct
- 55
- Opex Xof
- 9,000,000
- Revenue Xof
- 15,750,000
- Gross Profit Xof
- 8,662,500
- Ebitda Xof
- -337,500
- Payback Years
- —
90-day pilot economics
Evidence, assumptions and operational implications are separated below.
90-day pilot economics
| Scenario | Jobs 90d | Aro Xof | Gross Margin Pct | Opex Xof | Revenue Xof | Gross Profit Xof | Ebitda Xof |
|---|---|---|---|---|---|---|---|
| Cautious | 18 | 225,000 | 55 | 2,250,000 | 4,050,000 | 2,227,500 | -22,500 |
- Jobs 90d
- 18
- Aro Xof
- 225,000
- Gross Margin Pct
- 55
- Opex Xof
- 2,250,000
- Revenue Xof
- 4,050,000
- Gross Profit Xof
- 2,227,500
- Ebitda Xof
- -22,500
Risks and mitigations
Evidence, assumptions and operational implications are separated below.
Risks and mitigations
| Risk | Likelihood | Impact | Mitigation |
|---|---|---|---|
| Passenger BEV/PHEV denominator unavailable | High | High | Matched transport/customs/dealer extract; TAM stays null. |
| All-vehicle parc mixed into EV TAM | High | High | Keep >1.2m context separate from plug-ins. |
| BYD sales mistaken for national EV stock | High | High | Brand flow only; split BEV/PHEV and active status by VIN. |
| National versus State-fleet target conflict | High | High | Keep absolute forecast null; obtain official decree/roadmap clarification. |
| Site chargers mistaken for national network | High | Medium | Connector, power, access and uptime census. |
| Charger kWh/kW unit ambiguity | High | Medium | Nameplate/commissioning document audit; do not silently correct. |
| Feeder capacity/outage risk | Medium | High | Load/earthing study, tariff quote, backup and controlled charging. |
| OEM software, warranty and parts access | High | High | Supported VIN/task matrix, authorised-channel referrals and parts SLAs. |
| Battery fire or electric shock | Low | Critical | No pack work; isolation SOP, rescue gear and drills. |
| Waste route failure | Medium | Critical | No battery custody before written environmental route. |
| Tax/customs/incentive interpretation | Medium | High | Written DGI/Douanes/CEPICI advice; assume no special benefit. |
| Paid demand below partner-clinic threshold | High | High | Deposits, paid fleet trial and day-90 stop. |
| Data/privacy non-compliance | Medium | Medium | ARTCI formalities and privacy-by-design job records. |
- Likelihood
- High
- Impact
- High
- Mitigation
- Matched transport/customs/dealer extract; TAM stays null.
- Likelihood
- High
- Impact
- High
- Mitigation
- Keep >1.2m context separate from plug-ins.
- Likelihood
- High
- Impact
- High
- Mitigation
- Brand flow only; split BEV/PHEV and active status by VIN.
- Likelihood
- High
- Impact
- High
- Mitigation
- Keep absolute forecast null; obtain official decree/roadmap clarification.
- Likelihood
- High
- Impact
- Medium
- Mitigation
- Connector, power, access and uptime census.
- Likelihood
- High
- Impact
- Medium
- Mitigation
- Nameplate/commissioning document audit; do not silently correct.
- Likelihood
- Medium
- Impact
- High
- Mitigation
- Load/earthing study, tariff quote, backup and controlled charging.
- Likelihood
- High
- Impact
- High
- Mitigation
- Supported VIN/task matrix, authorised-channel referrals and parts SLAs.
- Likelihood
- Low
- Impact
- Critical
- Mitigation
- No pack work; isolation SOP, rescue gear and drills.
- Likelihood
- Medium
- Impact
- Critical
- Mitigation
- No battery custody before written environmental route.
- Likelihood
- Medium
- Impact
- High
- Mitigation
- Written DGI/Douanes/CEPICI advice; assume no special benefit.
- Likelihood
- High
- Impact
- High
- Mitigation
- Deposits, paid fleet trial and day-90 stop.
- Likelihood
- Medium
- Impact
- Medium
- Mitigation
- ARTCI formalities and privacy-by-design job records.
90-day entry plan
Evidence, assumptions and operational implications are separated below.
90-day entry plan
| Days | Objective | Actions | Owner | Deliverable |
|---|---|---|---|---|
| 0–15 | Registry and legal gate | Obtain matched transport/customs/dealer extract by propulsion, class, age, owner, location and active status; obtain Decree 2024-326 implementing orders; map entity, environmental, fire, electricity, waste, data and insurance. | EVS board / Côte d’Ivoire counsel | Definition and compliance file. |
- Objective
- Registry and legal gate
- Actions
- Obtain matched transport/customs/dealer extract by propulsion, class, age, owner, location and active status; obtain Decree 2024-326 implementing orders; map entity, environmental, fire, electricity, waste, data and insurance.
- Owner
- EVS board / Côte d’Ivoire counsel
- Deliverable
- Definition and compliance file.
Explicit go / no-go gates
Evidence, assumptions and operational implications are separated below.
Explicit go / no-go gates
| Gate | Go | No Go |
|---|---|---|
| Market denominator | Matched extract proves at least 750 registered active passenger/light-commercial BEVs/PHEVs in Greater Abidjan, separately identified | Classes/status/location cannot be separated or count is below 750. |
- Go
- Matched extract proves at least 750 registered active passenger/light-commercial BEVs/PHEVs in Greater Abidjan, separately identified
- No Go
- Classes/status/location cannot be separated or count is below 750.
Methodology
Evidence, assumptions and operational implications are separated below.
Greater Abidjan partner-clinic EBITDA
XOF; EVS steady-state assumptions.
Methodology
| Step | Method |
|---|---|
| 1. Evidence hierarchy | Primary Côte d’Ivoire authorities and listed-company/project operators first; secondary figures explicitly labelled. |
| 2. Definition control | Separate passenger BEV/PHEV, all-vehicle parc, brand sales, policy targets, site chargers and plans. |
| 3. Market denominator | Leave national passenger TAM null until matched active-registration extract. |
| 4. Forecasts | 2.5%/5%/10% policy-realisation shares; absolute vehicles null due target-scope and 2030 denominator conflict. |
| 5. Gate SAM | 750 Greater Abidjan plug-ins × 90% active × 60% reach × 1.20 events. |
| 6. SOM | Zero before hard gates. |
| 7. Economics | Nominal XOF, VAT-exclusive EVS assumptions; annual volumes remain below gate SAM. |
| 8. Regulation | No incentive, permit or technical standard assumed without current written authority confirmation. |
| 9. Validation | JSON, schema, formulas, citations, links, branding, definitions and template residue. |
- Method
- Primary Côte d’Ivoire authorities and listed-company/project operators first; secondary figures explicitly labelled.
- Method
- Separate passenger BEV/PHEV, all-vehicle parc, brand sales, policy targets, site chargers and plans.
- Method
- Leave national passenger TAM null until matched active-registration extract.
- Method
- 2.5%/5%/10% policy-realisation shares; absolute vehicles null due target-scope and 2030 denominator conflict.
- Method
- 750 Greater Abidjan plug-ins × 90% active × 60% reach × 1.20 events.
- Method
- Zero before hard gates.
- Method
- Nominal XOF, VAT-exclusive EVS assumptions; annual volumes remain below gate SAM.
- Method
- No incentive, permit or technical standard assumed without current written authority confirmation.
- Method
- JSON, schema, formulas, citations, links, branding, definitions and template residue.
Evidence gaps
Evidence, assumptions and operational implications are separated below.
Evidence gaps
| Gap | Needed | Decision Effect |
|---|---|---|
| Active passenger/light-commercial BEV and PHEV count | Matched DGTTC/customs registration extract by VIN, propulsion, class, age, location and active status | Blocks TAM, standalone site and franchise. |
| 2030 target legal denominator | Official decree/roadmap and ministry clarification of national versus State fleet | Keeps absolute forecast null. |
| Public charger census | Site, connector, standard, kW, access, tariff, uptime and commissioning record | Blocks network-service claim. |
| Article 25 competence modules/order | Current implementing order and accepted technician evidence | Blocks repair launch. |
| Battery/waste route | Written classification, storage, carrier and recipient approvals | Holds traction-pack work. |
- Needed
- Matched DGTTC/customs registration extract by VIN, propulsion, class, age, location and active status
- Decision Effect
- Blocks TAM, standalone site and franchise.
- Needed
- Official decree/roadmap and ministry clarification of national versus State fleet
- Decision Effect
- Keeps absolute forecast null.
- Needed
- Site, connector, standard, kW, access, tariff, uptime and commissioning record
- Decision Effect
- Blocks network-service claim.
- Needed
- Current implementing order and accepted technician evidence
- Decision Effect
- Blocks repair launch.
- Needed
- Written classification, storage, carrier and recipient approvals
- Decision Effect
- Holds traction-pack work.
Complete linked source register
Every material number is linked to a source or explicitly labelled as an EVS assumption.
Complete linked source register
| Source Id | Publisher | Publication Date | Accessed At | Scope | Href |
|---|---|---|---|---|---|
| transport_parc_2026 | Ministère des Transports et des Affaires Maritimes | 2026-06-06 | 2026-08-11 | Official current context: road transport exceeds 90% of national travel, the fleet exceeds 1.2 million vehicles, much of it is old, and the renewal programme represents more than XOF700bn. No powertrain split. | https://transports.gouv.ci/actualites/renouvellement-du-parc-automobile-le-ministere-des-transports-offre-une-nouvelle |
| transport_reg_2026 | Ministère des Transports et des Affaires Maritimes | 2026-06-19 | 2026-08-11 | Official administrative-flow evidence: 306,416 plates installed over three years, including 35,487 in 2023 and 108,425 in 2024. Plate activity is not annual vehicle sales or active stock. | https://transports.gouv.ci/actualites/nouvelle-immatriculation-initiale-des-vehicules-toure-souleymane-dresse-un-bilan-positif |
| transport_ev_training | Ministère des Transports et des Affaires Maritimes | 2026-06-14 | 2026-08-11 | Official latest interpretation: Decree 2024-326 is linked to a 10% EV objective in the national vehicle fleet by 2030; GEF project of USD1,607,535 targets six pilot areas. Target is not a stock forecast. | https://www.transports.gouv.ci/actualites/mobilite-electriquele-ministere-des-transports-lance-la-formation-nationale-abidjan |
| transport_ev_committee | Ministère des Transports et des Affaires Maritimes | 2026-02-17 | 2026-08-11 | Official preparatory work on pilot charging sites, renewable energy, standards, regulation, finance and maintenance. Planning is not installed infrastructure. | https://transports.gouv.ci/actualites/mobilite-durable-en-cote-divoirele-comite-technique-lance-les-travaux-de-l-integration |
| jorci_decree_index | Secrétariat Général du Gouvernement / ONECI | 2024-06-27 | 2026-08-11 | Official journal index for Decree 2024-326 of 22 May 2024 on electric transport and charging infrastructure. | https://jorci.oneci.ci/journaux-officiels/99 |
| decree_ch1 | LoiDici legal-text mirror | 2024-11-21 | 2026-08-11 | Text mirror: decree covers EVs, charging, importers, infrastructure operators and EV garages/personnel; EVs older than one year at import require technical-control certificate. Verify against official gazette before contracting. | https://loidici.biz/2024/11/21/chapitre-1-dispositions-generales-34/lois-article-par-article/plus-de-textes-de-lois/60172/naty/ |
| decree_ch2 | LoiDici legal-text mirror | 2024-11-21 | 2026-08-11 | Text mirror: battery/waste treatment is State-regulated; private public-charging operators need technical/financial capacity, certification, Energy Ministry approval, grid connection and semiannual reporting. Verify implementing orders. | https://loidici.biz/2024/11/21/chapitre-2-dispositions-relatives-aux-moyens-de-transport-electriques/lois-article-par-article/plus-de-textes-de-lois/60174/naty/ |
| decree_ch3 | LoiDici legal-text mirror | 2024-11-21 | 2026-08-11 | Text mirror: EV/charging investment follows ordinary investment law; repairs require a legal entity, qualified personnel and appropriate equipment. Competency implementing order must be obtained. | https://loidici.biz/2024/11/21/chapitre-3-dispositions-diverses-transitoires-et-finales/lois-article-par-article/plus-de-textes-de-lois/60176/naty/ |
| customs_age | Direction générale des Douanes de Côte d’Ivoire | — | 2026-08-11 | Official FAQ under Decree 2017-792: 5 years for passenger cars/taxis, 7 for minibuses and trucks up to 5t, and 10 for larger buses/trucks, subject to stated exceptions. | https://www.douanes.ci/tribune/faq.php |
| customs_decree | Direction générale des Douanes de Côte d’Ivoire | 2017-12-06 | 2026-08-11 | Official legal record of import-age limits. | https://www.douanes.ci/node/42795 |
| customs_battery_export | Direction générale des Douanes de Côte d’Ivoire | 2025-03-12 | 2026-08-11 | Official customs legal index lists Decree 2025-181 suspending export of waste and scrap used lead-acid batteries. Scope is not automatically lithium traction batteries. | https://www.douanes.ci/info/decret |
| charging_yopougon | Agence Ivoirienne de Presse | 2025-06-30 | 2026-08-11 | Government press agency reports 3 fast and 10 slow chargers at Petro-Ivoire Yopougon and 620 kWh/day solar/storage output. It labels charger ratings as kWh; unit ambiguity is preserved and requires field verification. | https://www.aip.ci/213388/cote-divoire-aip-une-nouvelle-station-de-recharge-pour-vehicules-electriques-inauguree-a-yopougon/ |
| charging_plan | Agence Ivoirienne de Presse | 2025-11-17 | 2026-08-11 | Private operator announcement reported by AIP: planned stations every 150 km. Plan, not delivered infrastructure. | https://www.aip.ci/279769/aip-vers-le-deploiement-dun-reseau-national-de-bornes-de-recharge-pour-accelerer-ladoption-des-vehicules-electriques-en-cote-divoire/ |
| cfao_byd_launch | CFAO Group | 2024-03-27 | 2026-08-11 | Official market entry: Atto 3 immediately, Dolphin and Dolphin Mini later, via sale or long-term rental. | https://www.cfaogroup.com/fr/la-concession-loxea-dabidjan-propose-desormais-a-ses-clients-les-vehicules-byd/ |
| cfao_green_tour | CFAO Group | 2024-07-15 | 2026-08-11 | Official evidence of Abidjan–Bouaké BYD demonstration and charging-system promotion; not sales or stock. | https://www.cfaogroup.com/en/promoting-green-mobility-in-cote-divoire/ |
| aip_byd_tang | Agence Ivoirienne de Presse | 2025-02-22 | 2026-08-11 | AIP reports BYD Tang alongside Atto 3 and Dolphin distribution through LOXEA; model availability, not national ranking. | https://www.aip.ci/cote-divoire-aip-un-nouveau-modele-de-vehicule-electrique-sur-le-marche-ivoirien/ |
| brvm_cfao_2025 | BRVM | 2026-07-13 | 2026-08-11 | Primary listed-company report. Searchable relay used for detailed sales figures where the PDF was not text-extractable in this workflow. | https://www.brvm.org/sites/default/files/20260713_-_rapport_annuel_-_exercice_2025_-_cfao_motors_ci.pdf |
| abidjan_eco_cfao | Abidjan Eco | 2026-07-16 | 2026-08-11 | Secondary relay of company annual report: distributor new-vehicle market 29,995 in 2025 versus 26,271 in 2024; CFAO 12,486; BYD 51 versus 15. BYD total is not split BEV/PHEV and is not national EV sales or active stock. | https://www.abidjan-eco.com/fr/article/cfao-mobility-cote-divoire-le-benefice-net-bondit-de-80-en-2025-grace-au-boom-automobile |
| mg_models | MG Motor Côte d’Ivoire / HR Motors | — | 2026-08-11 | Official dealer model catalogue includes the all-electric Cyberster and hybrids. Availability/stock and sales volumes are not disclosed. | https://mgmotorci.com/models |
| mg_service | MG Motor Côte d’Ivoire / HR Motors | — | 2026-08-11 | Official dealer aftersales and workshop locations; warranty work must remain inside authorised channel. | https://mgmotorci.com/mg-care |
| state_target | Centre d’Information et de Communication Gouvernementale relay | 2025-03-01 | 2026-08-11 | Government-communications relay describes a narrower 10% target for the State fleet, conflicting with the June 2026 ministry page’s national-fleet framing. Both definitions are retained. | https://news.abidjan.net/articles/739787/transports-transition-energetique-durable-le-gouvernement-ivoirien-vise-dici-a-2030-a-atteindre-10-de-vehicules-electriques-dans-le-parc-automobile-de-letat |
| le360_target | Le360 / AFP | 2025-03-03 | 2026-08-11 | Independent corroboration of State-fleet framing and €5.9m Low Carbon Transition project, 2023–2026. Secondary source. | https://afrique.le360.ma/societe/la-cote-divoire-ambitionne-datteindre-10-de-vehicules-electriques-dans-le-parc-automobile-de-letat_IYUASMD5EFAB5NFSK46JM2LQUM/ |
| gef_project | Commission Nationale du Fonds pour l’Environnement Mondial | 2025-08-13 | 2026-08-11 | Official commission page: project financed at about USD1.6m; project activity, not a grant automatically available to EVS. | https://cnfem.finances.gouv.ci/2025/08/13/integration-de-la-mobilite-electrique-aux-energies-renouvelables-dans-les-zones-periurbaines-et-rurales/ |
| fdtr_platform | Portail officiel du Gouvernement | 2026-06-04 | 2026-08-11 | Official vehicle-fleet renewal financing and traceability context; not EV-specific demand. | https://www.gouv.ci/actualite/lancement-de-la-plateforme-de-renouvellement-du-parc-automobile-le-fdtr-engage-une-nouvelle-dynamique-de-modernisation-et-de-financement-du-transport-routier-2285 |
| registration_fast | Ministère des Transports et des Affaires Maritimes | 2026-02-16 | 2026-08-11 | Official digital new-vehicle registration procedure expanded to accredited dealers from 1 March 2026; useful route for future data diligence. | https://transports.gouv.ci/actualites/immatriculation-acceleree-des-vehicules-neufsl-operation-demarre-des-le-1er-mars-2026 |
| worldbank_country | World Bank | — | 2026-08-11 | Current macro context: 6% real GDP growth in 2024 and 6.2% projected for 2025; not an EV-demand forecast. | https://www.worldbank.org/ext/en/country/cotedivoire |
| imf_2025 | International Monetary Fund | 2025-04-08 | 2026-08-11 | Macroeconomic context and medium-term growth outlook; not EV market data. | https://www.elibrary.imf.org/view/journals/002/2025/091/article-A001-en.xml |
| worldbank_mobility | World Bank | 2019-06-27 | 2026-08-11 | Official older context: about 10m trips/day and 20km BRT plan. Mobility intensity, not EV stock. | https://www.worldbank.org/en/news/press-release/2019/06/27/cote-divoire-world-bank-approves-300-million-to-boost-urban-mass-transit-in-abidjan |
| energy_project | Portail officiel du Gouvernement | 2026-06-01 | 2026-08-11 | Official planned capacity and XOF423.166bn investment; project financing is not current site supply. | https://www.gouv.ci/index.php/actualite/projet-dune-centrale-electrique-de-372mw-a-cycle-combine-a-songon-les-accords-financiers-signes-pour-un-investissement-global-de-423166-milliards-fcfa-7290 |
| energy_audits | Ministère des Mines, du Pétrole et de l’Énergie | 2024-10-18 | 2026-08-11 | Official energy-efficiency compliance route; confirm threshold/applicability to the selected workshop. | https://www.energie.gouv.ci/actualite/efficacite-energetique-le-ministere-en-charge-de-lenergie-lance-les-audits-obligatoires |
| anare | ANARE-CI | — | 2026-08-11 | Official electricity regulator and current tariff/complaints route. Site quote and connection study still required. | https://anare.ci/ |
| cepici_code | CEPICI | — | 2026-08-11 | Official investor one-stop shop lists Ordinance 2024-857 and approval process. Benefits are eligibility-, zone- and approval-specific. | https://cepici.gouv.ci/agrement |
| dgi_tax_2025 | Direction générale des Impôts | — | 2026-08-11 | Official analysis says the 2025 tax annex harmonised business-profit tax at 25%. Obtain current written tax advice for entity and activity. | https://dgi.gouv.ci/assets/documents/EBOOK/BODGI_2025/files/basic-html/page109.html |
| service_idu | Service Public de Côte d’Ivoire | — | 2026-08-11 | Official enterprise IDU/CEPICI registration route; company formation does not replace sector approvals. | https://servicepublic.gouv.ci/accueil/detaildemarcheparticulier/1/455/100 |
| environment_code | Ministère de l’Environnement | 2024-10-18 | 2026-08-11 | Official confirmation of Law 2023-900 of 23 November 2023 and environmental management framework. | https://web2.environnement.gouv.ci/index.php/actualite/534 |
| environment_scope | Ministère de l’Environnement | 2023-06-01 | 2026-08-11 | Official explanation: EIES/AES/EESS, industrial/commercial/artisanal waste, e-waste and hazardous waste including lead are covered. | https://environnement.gouv.ci/actualite/325 |
| ddisc_oil | Direction des Déchets Industriels et Substances Chimiques | 2025-08-13 | 2026-08-11 | Official regulator page: 49 approvals issued across collection/treatment categories and national traceability system announced. EVS must use approved routes. | https://ddisc.environnement.gouv.ci/atelier-de-remise-officielle-des-agrements-et-cahiers-des-charges-huiles-usagees-et-residus-dhydrocarbures/ |
| ddisc_2026 | Direction des Déchets Industriels et Substances Chimiques | 2026-03-02 | 2026-08-11 | Official current licensing window confirms regulated collection, transport, storage, recovery and disposal activity. | https://ddisc.environnement.gouv.ci/6852-2/ |
| artci_data | ARTCI | 2025-05-19 | 2026-08-11 | Official regulator reminder that private entities processing personal data fall under Law 2013-450 and privacy-by-design/default expectations. | https://www.artci.ci/index.php/textes-de-reference/36-decrets.html |
| artci_compliance | ARTCI | 2026-03-02 | 2026-08-11 | Current regulator evidence of national compliance assessment of public/private data controllers. | https://www.artci.ci/index.php/decisions-129/243-decision-autorite-de-protection-1.html |
| cnps_employer | CNPS | — | 2026-08-11 | Official employer route: worker declaration from first day of employment and employer identification responsibilities. | https://www.cnps.ci/employeur/ |
| codinorm | CODINORM | — | 2026-08-11 | Official standards-body route. Obtain adopted EV, electrical, lifting and workshop standards/editions in writing. | https://www.codinorm.ci/ |
| iso_6469 | ISO | — | 2026-08-11 | International HV safety benchmark; Côte d’Ivoire law and adopted standards control. | https://www.iso.org/standard/45477.html |
| iso_17409 | ISO | — | 2026-08-11 | International conductive charging interface benchmark; not proof of national adoption. | https://www.iso.org/standard/68474.html |
| iec_61851 | IEC | — | 2026-08-11 | International EVSE benchmark; local Energy Ministry, utility, installer and certification approvals control. | https://webstore.iec.ch/en/publication/33644 |
| un_tests | UNECE | — | 2026-08-11 | UN 38.3 lithium-battery transport testing context. | https://unece.org/transport/dangerous-goods/rev8-files |
| basel | Basel Convention Secretariat | — | 2026-08-11 | Transboundary hazardous-waste controls; national and destination-country permits also apply. | https://www.basel.int/TheConvention/Overview/tabid/1271/Default.aspx |
| ilo_osh | International Labour Organization | — | 2026-08-11 | OSH management benchmark; does not replace Côte d’Ivoire labour and safety law. | https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001 |
| mixed_sources | EVS Worldwide | 2026-08-11 | 2026-08-11 | Rows and narrative retain their individual bracketed source identifiers; this registry entry only resolves block-level multi-source provenance. | EVS://Cote-d-Ivoire/mixed-source-evidence |
| evs_model | EVS Worldwide | 2026-08-11 | 2026-08-11 | Internal assumptions and calculations; no assumption is presented as sourced fact. | EVS://Cote-d-Ivoire/market-entry-model |
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-06-06
- Accessed At
- 2026-08-11
- Scope
- Official current context: road transport exceeds 90% of national travel, the fleet exceeds 1.2 million vehicles, much of it is old, and the renewal programme represents more than XOF700bn. No powertrain split.
- Href
- https://transports.gouv.ci/actualites/renouvellement-du-parc-automobile-le-ministere-des-transports-offre-une-nouvelle
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-06-19
- Accessed At
- 2026-08-11
- Scope
- Official administrative-flow evidence: 306,416 plates installed over three years, including 35,487 in 2023 and 108,425 in 2024. Plate activity is not annual vehicle sales or active stock.
- Href
- https://transports.gouv.ci/actualites/nouvelle-immatriculation-initiale-des-vehicules-toure-souleymane-dresse-un-bilan-positif
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-06-14
- Accessed At
- 2026-08-11
- Scope
- Official latest interpretation: Decree 2024-326 is linked to a 10% EV objective in the national vehicle fleet by 2030; GEF project of USD1,607,535 targets six pilot areas. Target is not a stock forecast.
- Href
- https://www.transports.gouv.ci/actualites/mobilite-electriquele-ministere-des-transports-lance-la-formation-nationale-abidjan
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-02-17
- Accessed At
- 2026-08-11
- Scope
- Official preparatory work on pilot charging sites, renewable energy, standards, regulation, finance and maintenance. Planning is not installed infrastructure.
- Href
- https://transports.gouv.ci/actualites/mobilite-durable-en-cote-divoirele-comite-technique-lance-les-travaux-de-l-integration
- Publisher
- Secrétariat Général du Gouvernement / ONECI
- Publication Date
- 2024-06-27
- Accessed At
- 2026-08-11
- Scope
- Official journal index for Decree 2024-326 of 22 May 2024 on electric transport and charging infrastructure.
- Href
- https://jorci.oneci.ci/journaux-officiels/99
- Publisher
- LoiDici legal-text mirror
- Publication Date
- 2024-11-21
- Accessed At
- 2026-08-11
- Scope
- Text mirror: decree covers EVs, charging, importers, infrastructure operators and EV garages/personnel; EVs older than one year at import require technical-control certificate. Verify against official gazette before contracting.
- Href
- https://loidici.biz/2024/11/21/chapitre-1-dispositions-generales-34/lois-article-par-article/plus-de-textes-de-lois/60172/naty/
- Publisher
- LoiDici legal-text mirror
- Publication Date
- 2024-11-21
- Accessed At
- 2026-08-11
- Scope
- Text mirror: battery/waste treatment is State-regulated; private public-charging operators need technical/financial capacity, certification, Energy Ministry approval, grid connection and semiannual reporting. Verify implementing orders.
- Href
- https://loidici.biz/2024/11/21/chapitre-2-dispositions-relatives-aux-moyens-de-transport-electriques/lois-article-par-article/plus-de-textes-de-lois/60174/naty/
- Publisher
- LoiDici legal-text mirror
- Publication Date
- 2024-11-21
- Accessed At
- 2026-08-11
- Scope
- Text mirror: EV/charging investment follows ordinary investment law; repairs require a legal entity, qualified personnel and appropriate equipment. Competency implementing order must be obtained.
- Href
- https://loidici.biz/2024/11/21/chapitre-3-dispositions-diverses-transitoires-et-finales/lois-article-par-article/plus-de-textes-de-lois/60176/naty/
- Publisher
- Direction générale des Douanes de Côte d’Ivoire
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official FAQ under Decree 2017-792: 5 years for passenger cars/taxis, 7 for minibuses and trucks up to 5t, and 10 for larger buses/trucks, subject to stated exceptions.
- Href
- https://www.douanes.ci/tribune/faq.php
- Publisher
- Direction générale des Douanes de Côte d’Ivoire
- Publication Date
- 2017-12-06
- Accessed At
- 2026-08-11
- Scope
- Official legal record of import-age limits.
- Href
- https://www.douanes.ci/node/42795
- Publisher
- Direction générale des Douanes de Côte d’Ivoire
- Publication Date
- 2025-03-12
- Accessed At
- 2026-08-11
- Scope
- Official customs legal index lists Decree 2025-181 suspending export of waste and scrap used lead-acid batteries. Scope is not automatically lithium traction batteries.
- Href
- https://www.douanes.ci/info/decret
- Publisher
- Agence Ivoirienne de Presse
- Publication Date
- 2025-06-30
- Accessed At
- 2026-08-11
- Scope
- Government press agency reports 3 fast and 10 slow chargers at Petro-Ivoire Yopougon and 620 kWh/day solar/storage output. It labels charger ratings as kWh; unit ambiguity is preserved and requires field verification.
- Href
- https://www.aip.ci/213388/cote-divoire-aip-une-nouvelle-station-de-recharge-pour-vehicules-electriques-inauguree-a-yopougon/
- Publisher
- Agence Ivoirienne de Presse
- Publication Date
- 2025-11-17
- Accessed At
- 2026-08-11
- Scope
- Private operator announcement reported by AIP: planned stations every 150 km. Plan, not delivered infrastructure.
- Href
- https://www.aip.ci/279769/aip-vers-le-deploiement-dun-reseau-national-de-bornes-de-recharge-pour-accelerer-ladoption-des-vehicules-electriques-en-cote-divoire/
- Publisher
- CFAO Group
- Publication Date
- 2024-03-27
- Accessed At
- 2026-08-11
- Scope
- Official market entry: Atto 3 immediately, Dolphin and Dolphin Mini later, via sale or long-term rental.
- Href
- https://www.cfaogroup.com/fr/la-concession-loxea-dabidjan-propose-desormais-a-ses-clients-les-vehicules-byd/
- Publisher
- CFAO Group
- Publication Date
- 2024-07-15
- Accessed At
- 2026-08-11
- Scope
- Official evidence of Abidjan–Bouaké BYD demonstration and charging-system promotion; not sales or stock.
- Href
- https://www.cfaogroup.com/en/promoting-green-mobility-in-cote-divoire/
- Publisher
- Agence Ivoirienne de Presse
- Publication Date
- 2025-02-22
- Accessed At
- 2026-08-11
- Scope
- AIP reports BYD Tang alongside Atto 3 and Dolphin distribution through LOXEA; model availability, not national ranking.
- Href
- https://www.aip.ci/cote-divoire-aip-un-nouveau-modele-de-vehicule-electrique-sur-le-marche-ivoirien/
- Publisher
- BRVM
- Publication Date
- 2026-07-13
- Accessed At
- 2026-08-11
- Scope
- Primary listed-company report. Searchable relay used for detailed sales figures where the PDF was not text-extractable in this workflow.
- Href
- https://www.brvm.org/sites/default/files/20260713_-_rapport_annuel_-_exercice_2025_-_cfao_motors_ci.pdf
- Publisher
- Abidjan Eco
- Publication Date
- 2026-07-16
- Accessed At
- 2026-08-11
- Scope
- Secondary relay of company annual report: distributor new-vehicle market 29,995 in 2025 versus 26,271 in 2024; CFAO 12,486; BYD 51 versus 15. BYD total is not split BEV/PHEV and is not national EV sales or active stock.
- Href
- https://www.abidjan-eco.com/fr/article/cfao-mobility-cote-divoire-le-benefice-net-bondit-de-80-en-2025-grace-au-boom-automobile
- Publisher
- MG Motor Côte d’Ivoire / HR Motors
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official dealer model catalogue includes the all-electric Cyberster and hybrids. Availability/stock and sales volumes are not disclosed.
- Href
- https://mgmotorci.com/models
- Publisher
- MG Motor Côte d’Ivoire / HR Motors
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official dealer aftersales and workshop locations; warranty work must remain inside authorised channel.
- Href
- https://mgmotorci.com/mg-care
- Publisher
- Centre d’Information et de Communication Gouvernementale relay
- Publication Date
- 2025-03-01
- Accessed At
- 2026-08-11
- Scope
- Government-communications relay describes a narrower 10% target for the State fleet, conflicting with the June 2026 ministry page’s national-fleet framing. Both definitions are retained.
- Href
- https://news.abidjan.net/articles/739787/transports-transition-energetique-durable-le-gouvernement-ivoirien-vise-dici-a-2030-a-atteindre-10-de-vehicules-electriques-dans-le-parc-automobile-de-letat
- Publisher
- Le360 / AFP
- Publication Date
- 2025-03-03
- Accessed At
- 2026-08-11
- Scope
- Independent corroboration of State-fleet framing and €5.9m Low Carbon Transition project, 2023–2026. Secondary source.
- Href
- https://afrique.le360.ma/societe/la-cote-divoire-ambitionne-datteindre-10-de-vehicules-electriques-dans-le-parc-automobile-de-letat_IYUASMD5EFAB5NFSK46JM2LQUM/
- Publisher
- Commission Nationale du Fonds pour l’Environnement Mondial
- Publication Date
- 2025-08-13
- Accessed At
- 2026-08-11
- Scope
- Official commission page: project financed at about USD1.6m; project activity, not a grant automatically available to EVS.
- Href
- https://cnfem.finances.gouv.ci/2025/08/13/integration-de-la-mobilite-electrique-aux-energies-renouvelables-dans-les-zones-periurbaines-et-rurales/
- Publisher
- Portail officiel du Gouvernement
- Publication Date
- 2026-06-04
- Accessed At
- 2026-08-11
- Scope
- Official vehicle-fleet renewal financing and traceability context; not EV-specific demand.
- Href
- https://www.gouv.ci/actualite/lancement-de-la-plateforme-de-renouvellement-du-parc-automobile-le-fdtr-engage-une-nouvelle-dynamique-de-modernisation-et-de-financement-du-transport-routier-2285
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-02-16
- Accessed At
- 2026-08-11
- Scope
- Official digital new-vehicle registration procedure expanded to accredited dealers from 1 March 2026; useful route for future data diligence.
- Href
- https://transports.gouv.ci/actualites/immatriculation-acceleree-des-vehicules-neufsl-operation-demarre-des-le-1er-mars-2026
- Publisher
- World Bank
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Current macro context: 6% real GDP growth in 2024 and 6.2% projected for 2025; not an EV-demand forecast.
- Href
- https://www.worldbank.org/ext/en/country/cotedivoire
- Publisher
- International Monetary Fund
- Publication Date
- 2025-04-08
- Accessed At
- 2026-08-11
- Scope
- Macroeconomic context and medium-term growth outlook; not EV market data.
- Href
- https://www.elibrary.imf.org/view/journals/002/2025/091/article-A001-en.xml
- Publisher
- World Bank
- Publication Date
- 2019-06-27
- Accessed At
- 2026-08-11
- Scope
- Official older context: about 10m trips/day and 20km BRT plan. Mobility intensity, not EV stock.
- Href
- https://www.worldbank.org/en/news/press-release/2019/06/27/cote-divoire-world-bank-approves-300-million-to-boost-urban-mass-transit-in-abidjan
- Publisher
- Portail officiel du Gouvernement
- Publication Date
- 2026-06-01
- Accessed At
- 2026-08-11
- Scope
- Official planned capacity and XOF423.166bn investment; project financing is not current site supply.
- Href
- https://www.gouv.ci/index.php/actualite/projet-dune-centrale-electrique-de-372mw-a-cycle-combine-a-songon-les-accords-financiers-signes-pour-un-investissement-global-de-423166-milliards-fcfa-7290
- Publisher
- Ministère des Mines, du Pétrole et de l’Énergie
- Publication Date
- 2024-10-18
- Accessed At
- 2026-08-11
- Scope
- Official energy-efficiency compliance route; confirm threshold/applicability to the selected workshop.
- Href
- https://www.energie.gouv.ci/actualite/efficacite-energetique-le-ministere-en-charge-de-lenergie-lance-les-audits-obligatoires
- Publisher
- ANARE-CI
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official electricity regulator and current tariff/complaints route. Site quote and connection study still required.
- Href
- https://anare.ci/
- Publisher
- CEPICI
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official investor one-stop shop lists Ordinance 2024-857 and approval process. Benefits are eligibility-, zone- and approval-specific.
- Href
- https://cepici.gouv.ci/agrement
- Publisher
- Direction générale des Impôts
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official analysis says the 2025 tax annex harmonised business-profit tax at 25%. Obtain current written tax advice for entity and activity.
- Href
- https://dgi.gouv.ci/assets/documents/EBOOK/BODGI_2025/files/basic-html/page109.html
- Publisher
- Service Public de Côte d’Ivoire
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official enterprise IDU/CEPICI registration route; company formation does not replace sector approvals.
- Href
- https://servicepublic.gouv.ci/accueil/detaildemarcheparticulier/1/455/100
- Publisher
- Ministère de l’Environnement
- Publication Date
- 2024-10-18
- Accessed At
- 2026-08-11
- Scope
- Official confirmation of Law 2023-900 of 23 November 2023 and environmental management framework.
- Href
- https://web2.environnement.gouv.ci/index.php/actualite/534
- Publisher
- Ministère de l’Environnement
- Publication Date
- 2023-06-01
- Accessed At
- 2026-08-11
- Scope
- Official explanation: EIES/AES/EESS, industrial/commercial/artisanal waste, e-waste and hazardous waste including lead are covered.
- Href
- https://environnement.gouv.ci/actualite/325
- Publisher
- Direction des Déchets Industriels et Substances Chimiques
- Publication Date
- 2025-08-13
- Accessed At
- 2026-08-11
- Scope
- Official regulator page: 49 approvals issued across collection/treatment categories and national traceability system announced. EVS must use approved routes.
- Href
- https://ddisc.environnement.gouv.ci/atelier-de-remise-officielle-des-agrements-et-cahiers-des-charges-huiles-usagees-et-residus-dhydrocarbures/
- Publisher
- Direction des Déchets Industriels et Substances Chimiques
- Publication Date
- 2026-03-02
- Accessed At
- 2026-08-11
- Scope
- Official current licensing window confirms regulated collection, transport, storage, recovery and disposal activity.
- Href
- https://ddisc.environnement.gouv.ci/6852-2/
- Publisher
- ARTCI
- Publication Date
- 2025-05-19
- Accessed At
- 2026-08-11
- Scope
- Official regulator reminder that private entities processing personal data fall under Law 2013-450 and privacy-by-design/default expectations.
- Href
- https://www.artci.ci/index.php/textes-de-reference/36-decrets.html
- Publisher
- ARTCI
- Publication Date
- 2026-03-02
- Accessed At
- 2026-08-11
- Scope
- Current regulator evidence of national compliance assessment of public/private data controllers.
- Href
- https://www.artci.ci/index.php/decisions-129/243-decision-autorite-de-protection-1.html
- Publisher
- CNPS
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official employer route: worker declaration from first day of employment and employer identification responsibilities.
- Href
- https://www.cnps.ci/employeur/
- Publisher
- CODINORM
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official standards-body route. Obtain adopted EV, electrical, lifting and workshop standards/editions in writing.
- Href
- https://www.codinorm.ci/
- Publisher
- ISO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International HV safety benchmark; Côte d’Ivoire law and adopted standards control.
- Href
- https://www.iso.org/standard/45477.html
- Publisher
- ISO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International conductive charging interface benchmark; not proof of national adoption.
- Href
- https://www.iso.org/standard/68474.html
- Publisher
- IEC
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International EVSE benchmark; local Energy Ministry, utility, installer and certification approvals control.
- Href
- https://webstore.iec.ch/en/publication/33644
- Publisher
- UNECE
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- UN 38.3 lithium-battery transport testing context.
- Href
- https://unece.org/transport/dangerous-goods/rev8-files
- Publisher
- Basel Convention Secretariat
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Transboundary hazardous-waste controls; national and destination-country permits also apply.
- Href
- https://www.basel.int/TheConvention/Overview/tabid/1271/Default.aspx
- Publisher
- International Labour Organization
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- OSH management benchmark; does not replace Côte d’Ivoire labour and safety law.
- Href
- https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Rows and narrative retain their individual bracketed source identifiers; this registry entry only resolves block-level multi-source provenance.
- Href
- EVS://Cote-d-Ivoire/mixed-source-evidence
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Internal assumptions and calculations; no assumption is presented as sourced fact.
- Href
- EVS://Cote-d-Ivoire/market-entry-model
Validation register
Evidence, assumptions and operational implications are separated below.
Validation register
| Check | Status | Detail |
|---|---|---|
| JSON / UTF-8 | Pass | Generated and reparsed. |
| Schema | Pass | Required blocks, datasets, calculations and source registry present. |
| Calculations | Pass | Gate SAM and annual/90-day economics recomputed. |
| Definition control | Pass | Passenger plug-ins, all-vehicle parc, brand sales, target definitions, site chargers and plans remain separate. |
| Branding | Pass | EVS Green #5BCC12, Silver #A7B3BB, charcoal/black, white/light grey and Inter; no blue. |
| Decision | Pass | National TAM null, executable SOM zero and hard gates explicit. |
- Status
- Pass
- Detail
- Generated and reparsed.
- Status
- Pass
- Detail
- Required blocks, datasets, calculations and source registry present.
- Status
- Pass
- Detail
- Gate SAM and annual/90-day economics recomputed.
- Status
- Pass
- Detail
- Passenger plug-ins, all-vehicle parc, brand sales, target definitions, site chargers and plans remain separate.
- Status
- Pass
- Detail
- EVS Green #5BCC12, Silver #A7B3BB, charcoal/black, white/light grey and Inter; no blue.
- Status
- Pass
- Detail
- National TAM null, executable SOM zero and hard gates explicit.
EVS Board Position
CONDITIONAL GO for evidence-gated diligence and scheduled Greater Abidjan partner-clinic days; NO-GO standalone/franchise; HOLD traction-pack work.
Source register
50 primary and derived sources
ShowHide
Source register
50 primary and derived sources
Get the full Côte d'Ivoire report
The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.