Market intelligence/Africa/Report available
Côte d'Ivoire.
EVS Côte d'Ivoire EV Service Centre Market Entry
Decision-grade Côte d'Ivoire assessment separating passenger/light-commercial plug-in data gaps, all-vehicle parc, brand/distributor flows, conflicting policy-target definitions, one-site charging evidence, announced networks and EVS assumptions.
Passenger plug-in stock
—
No current authoritative passenger BEV/PHEV stock series located.
All-vehicle parc
1,200,000
Official lower bound for all road vehicles; not EV TAM.
Yopougon chargers
13
Published count at one Yopougon site, not national total.
Gate SAM jobs/year
486
Only after 750 separated active Greater Abidjan passenger/light-commercial plug-ins.
01/The verdict in full
Executive summary
Evidence, assumptions and operational implications are separated below.
02
Market headline
Evidence, assumptions and operational implications are separated below.
Market headline
- Value
- —
- Unit
- vehicles
- Period
- Current
- Status
- No authoritative separated registration series located.
- Value
- 1,200,000
- Unit
- vehicles, lower bound
- Period
- June 2026
- Status
- Official source says more than 1.2m; no propulsion split [transport_parc_2026].
- Value
- 13
- Unit
- charger units
- Period
- June 2025
- Status
- One site only; AIP power-unit wording requires field check [charging_yopougon].
- Value
- 486
- Unit
- jobs/year
- Period
- EVS model
- Status
- Activates only after 750 separated active Greater Abidjan passenger/light-commercial BEV/PHEVs.
03
Macroeconomic context
Evidence, assumptions and operational implications are separated below.
Macroeconomic context
- Value
- 6
- Unit
- %
- Period
- 2024
- Scope
- World Bank current country overview [worldbank_country].
04
Market size and vehicle parc context
No current authoritative passenger/light-commercial plug-in denominator was located. All-vehicle parc and brand sales are kept out of TAM.
Market size and vehicle parc context
- Value
- 1,200,000
- Unit
- vehicles, lower bound
- Period
- June 2026
- Scope
- Official page says more than 1.2m; passenger, commercial, two-wheel and propulsion composition not given [transport_parc_2026].
- Value
- 29,995
- Unit
- vehicles
- Period
- 2025
- Scope
- Company-report market total relayed by secondary source; all powertrains [abidjan_eco_cfao] [brvm_cfao_2025].
- Value
- 26,271
- Unit
- vehicles
- Period
- 2024
- Scope
- All powertrains; company-report relay [abidjan_eco_cfao] [brvm_cfao_2025].
- Value
- 51
- Unit
- vehicles
- Period
- 2025
- Scope
- One brand/distributor; BEV/PHEV mix not split and not active stock [abidjan_eco_cfao].
- Value
- 15
- Unit
- vehicles
- Period
- 2024
- Scope
- One brand/distributor; not total EV sales [abidjan_eco_cfao].
05
BEV/PHEV sales, stock and adoption history
No annual national passenger BEV/PHEV sales or active-stock series was found. Brand flows are ecosystem signals, not registration history.
All-vehicle parc, distributor market and BYD flows use different definitions.
BEV/PHEV sales, stock and adoption history
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- No authoritative separated national series located.
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- BYD launched through LOXEA; 15 BYD sales company-reported, unsplit by BEV/PHEV [cfao_byd_launch] [abidjan_eco_cfao].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- 51 BYD sales company-reported, unsplit by BEV/PHEV; Tang availability and Yopougon charging milestone [aip_byd_tang] [charging_yopougon].
- Passenger Bev Sales
- —
- Passenger Phev Sales
- —
- Active Passenger Bev Phev
- —
- Other Evidence
- Policy/skills project active; no current national registration extract [transport_ev_training].
06
Definition reconciliation
Evidence, assumptions and operational implications are separated below.
Definition reconciliation
- Treatment
- Null
- Reason
- No authoritative annual or active-status series located.
- Treatment
- All-vehicle lower bound only
- Reason
- No passenger/commercial, two-wheel or propulsion split [transport_parc_2026].
- Treatment
- Brand/distributor flow proxy
- Reason
- Not national EV total; BEV/PHEV mix and active status not published [abidjan_eco_cfao].
- Treatment
- Definition-conflicted policy target
- Reason
- June 2026 ministry page says national fleet; 2025 government relay says State fleet [transport_ev_training] [state_target].
- Treatment
- Verified published site inventory only
- Reason
- Not a national connector census; source uses kWh for charger rating [charging_yopougon].
- Treatment
- Announced plan
- Reason
- Private plan reported by AIP; not delivered infrastructure [charging_plan].
07
Cautious / base / high adoption cases
These are policy-target realisation shares, not vehicle-stock forecasts. Absolute 2030 vehicles remain null because target scope and denominator conflict.
Cautious / base / high adoption cases
- Ev Share 2030 Pct
- 2.5
- Vehicles 2030
- —
- Interpretation
- EVS 25% realisation of the 10% policy objective; absolute vehicles unavailable because target scope and 2030 denominator conflict.
- Ev Share 2030 Pct
- 5
- Vehicles 2030
- —
- Interpretation
- EVS 50% policy-realisation sensitivity; not a current-stock forecast.
- Ev Share 2030 Pct
- 10
- Vehicles 2030
- —
- Interpretation
- Full policy objective; stress case only [transport_ev_training] [state_target].
08
Charging infrastructure
The only source-backed installed count used is 13 charger units at one Yopougon site. It is not a national census and rating units require verification.
EVS shares; absolute vehicles remain null.
Charging infrastructure
- Value
- —
- Unit
- connectors
- Evidence
- No auditable connector/power/access/uptime census located.
- Value
- 3
- Unit
- charger units
- Evidence
- AIP reports “60 kWh”; likely rating-unit ambiguity, not silently corrected [charging_yopougon].
- Value
- 10
- Unit
- charger units
- Evidence
- AIP reports “22 kWh”; verify power, connectors, access and uptime [charging_yopougon].
- Value
- 620
- Unit
- kWh/day
- Evidence
- Site claim reported by AIP [charging_yopougon].
- Value
- 150
- Unit
- km
- Evidence
- Private deployment intent only [charging_plan].
- Value
- —
- Unit
- XOF/kWh plus charges
- Evidence
- Obtain current CIE/ANARE professional category, subscribed-power and demand-charge quote [anare].
09
Grid and energy readiness
Evidence, assumptions and operational implications are separated below.
Grid and energy readiness
- Value
- 372
- Unit
- MW
- Status
- Financed project announced June 2026; not current feeder capacity [energy_project].
- Value
- —
- Unit
- legal threshold
- Status
- Confirm whether selected clinic falls within mandatory-audit scope [energy_audits].
- Value
- —
- Unit
- kVA / outage record
- Status
- Site study required; national projects do not prove premises capacity.
10
Vehicle parc age and service demand
Evidence, assumptions and operational implications are separated below.
Vehicle parc age and service demand
- Value
- —
- Unit
- vehicles
- Implication
- No service-demand denominator; matched registration/import/service extract required.
- Value
- 1,200,000
- Unit
- vehicles
- Implication
- Large conventional parc supports partner-workshop ecosystem, not EV TAM [transport_parc_2026].
- Value
- 5
- Unit
- years
- Implication
- Constrains legal used-import age; imported EVs over one year also need technical certificate [customs_age] [decree_ch1].
- Value
- 29,995
- Unit
- vehicles in 2025
- Implication
- Commercial-scale new-car channel; EV share unavailable [abidjan_eco_cfao].
- Value
- 51
- Unit
- vehicles in 2025
- Implication
- Early adoption signal, not sufficient standalone-centre denominator [abidjan_eco_cfao].
11
EVS assumptions
Evidence, assumptions and operational implications are separated below.
EVS assumptions
- Value
- 750
- Unit
- registered active passenger/light-commercial BEV/PHEV
- Basis
- EVS density gate, not estimate.
- Value
- 0.9
- Unit
- share
- Basis
- EVS planning haircut after registry proof.
- Value
- 0.6
- Unit
- share
- Basis
- After captive, warranty and unsupported-VIN screening.
- Value
- 1.2
- Unit
- jobs/vehicle/year
- Basis
- EVS blended diagnostic/chassis assumption.
- Value
- 275,000
- Unit
- XOF/job
- Basis
- Replace with paid Côte d’Ivoire observations.
- Value
- 45,000,000
- Unit
- XOF
- Basis
- EVS board gate.
- Value
- 0
- Unit
- jobs
- Basis
- Deliberately zero.
12
Transparent TAM / SAM / SOM
National passenger TAM is deliberately null and executable SOM is zero. The quantified Greater Abidjan opportunity activates only after a matched registry gate.
Transparent TAM / SAM / SOM
- Vehicles
- —
- Jobs Per Year
- —
- Revenue Xof
- —
- Status
- Not quantified: current active BEV/PHEV denominator unavailable.
- Vehicles
- 1,200,000
- Jobs Per Year
- —
- Revenue Xof
- —
- Status
- Lower-bound all-powertrain parc; excluded from EV TAM [transport_parc_2026].
- Vehicles
- 405
- Jobs Per Year
- 486
- Revenue Xof
- 133,650,000
- Status
- 750 separated registrations × 90% active × 60% reach × 1.20 events.
13
Customer and fleet segments
Evidence, assumptions and operational implications are separated below.
Customer and fleet segments
- Need
- Pre-purchase report, scan, charging, 12V and chassis evidence
- Priority
- High only for supported VINs.
- Need
- Route/charging readiness and condition reporting
- Priority
- Highest through paid fleet trial [cfao_byd_launch].
- Need
- Uptime inspections, tyres, brakes and charging evidence
- Priority
- High after VIN-level active-fleet proof.
- Need
- Tender-compliant reporting, charging and uptime SLAs
- Priority
- Contract only; State-fleet target definition may apply [state_target].
- Need
- Different tools, parts and battery logistics
- Priority
- Separate future workstream; excluded from passenger TAM.
- Need
- Depot tools, lifts, HV and OEM contract
- Priority
- Excluded from Phase 1; contract-only.
14
Leading EV brands and models
Evidence, assumptions and operational implications are separated below.
Leading EV brands and models
- Model
- Atto 3 / Dolphin / Dolphin Mini
- Powertrain
- BEV
- Signal
- Official LOXEA launch and aftersales ecosystem; no national volume split [cfao_byd_launch].
- Model
- Tang
- Powertrain
- BEV
- Signal
- Local availability reported by AIP [aip_byd_tang].
- Model
- Song Plus
- Powertrain
- PHEV by local media; VIN verification required
- Signal
- Do not infer PHEV volumes from aggregate BYD sales.
- Model
- Cyberster
- Powertrain
- BEV
- Signal
- Official dealer catalogue; no stock or sales volume disclosed [mg_models].
- Model
- MG 3/HS/ZS Hybrid+
- Powertrain
- HEV unless plug-in homologation proves otherwise
- Signal
- Exclude from PHEV stock [mg_models].
- Model
- Unranked
- Powertrain
- BEV/PHEV by VIN
- Signal
- Market presence requires distributor, registration and tool-support audit.
15In the full report
Independent and OEM competitors
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
16In the full report
Priority cities and regions
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
17In the full report
Consumer incentives and policy
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
18In the full report
Business, tax and investment incentives
Decree 2024-326 keeps EV investment under ordinary investment law. No automatic exemption, grant or approval is assumed.
This section is in the full report.
19In the full report
Labour, licensing and workshop regulation
Every material approval is a launch gate; this is not legal, tax, engineering or insurance advice.
This section is in the full report.
20In the full report
High-voltage controls
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
21In the full report
Battery and waste controls
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
22In the full report
Recommended service portfolio
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
23In the full report
Operating model
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
24In the full report
Franchise pathway
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
25In the full report
Pilot steady-state economics
All volumes, prices, margins, costs and capex are EVS assumptions in nominal XOF, VAT-exclusive and pre-tax.
This section is in the full report.
26In the full report
90-day pilot economics
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
27In the full report
Risks and mitigations
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
28In the full report
90-day entry plan
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
29In the full report
Explicit go / no-go gates
Evidence, assumptions and operational implications are separated below.
This section is in the full report.
30
Methodology
Evidence, assumptions and operational implications are separated below.
XOF; EVS steady-state assumptions.
Methodology
- Method
- Primary Côte d’Ivoire authorities and listed-company/project operators first; secondary figures explicitly labelled.
- Method
- Separate passenger BEV/PHEV, all-vehicle parc, brand sales, policy targets, site chargers and plans.
- Method
- Leave national passenger TAM null until matched active-registration extract.
- Method
- 2.5%/5%/10% policy-realisation shares; absolute vehicles null due target-scope and 2030 denominator conflict.
- Method
- 750 Greater Abidjan plug-ins × 90% active × 60% reach × 1.20 events.
- Method
- Zero before hard gates.
- Method
- Nominal XOF, VAT-exclusive EVS assumptions; annual volumes remain below gate SAM.
- Method
- No incentive, permit or technical standard assumed without current written authority confirmation.
- Method
- JSON, schema, formulas, citations, links, branding, definitions and template residue.
31
Evidence gaps
Evidence, assumptions and operational implications are separated below.
Evidence gaps
- Needed
- Matched DGTTC/customs registration extract by VIN, propulsion, class, age, location and active status
- Decision Effect
- Blocks TAM, standalone site and franchise.
- Needed
- Official decree/roadmap and ministry clarification of national versus State fleet
- Decision Effect
- Keeps absolute forecast null.
- Needed
- Site, connector, standard, kW, access, tariff, uptime and commissioning record
- Decision Effect
- Blocks network-service claim.
- Needed
- Current implementing order and accepted technician evidence
- Decision Effect
- Blocks repair launch.
- Needed
- Written classification, storage, carrier and recipient approvals
- Decision Effect
- Holds traction-pack work.
32
Complete linked source register
Every material number is linked to a source or explicitly labelled as an EVS assumption.
Complete linked source register
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-06-06
- Accessed At
- 2026-08-11
- Scope
- Official current context: road transport exceeds 90% of national travel, the fleet exceeds 1.2 million vehicles, much of it is old, and the renewal programme represents more than XOF700bn. No powertrain split.
- Href
- https://transports.gouv.ci/actualites/renouvellement-du-parc-automobile-le-ministere-des-transports-offre-une-nouvelle
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-06-19
- Accessed At
- 2026-08-11
- Scope
- Official administrative-flow evidence: 306,416 plates installed over three years, including 35,487 in 2023 and 108,425 in 2024. Plate activity is not annual vehicle sales or active stock.
- Href
- https://transports.gouv.ci/actualites/nouvelle-immatriculation-initiale-des-vehicules-toure-souleymane-dresse-un-bilan-positif
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-06-14
- Accessed At
- 2026-08-11
- Scope
- Official latest interpretation: Decree 2024-326 is linked to a 10% EV objective in the national vehicle fleet by 2030; GEF project of USD1,607,535 targets six pilot areas. Target is not a stock forecast.
- Href
- https://www.transports.gouv.ci/actualites/mobilite-electriquele-ministere-des-transports-lance-la-formation-nationale-abidjan
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-02-17
- Accessed At
- 2026-08-11
- Scope
- Official preparatory work on pilot charging sites, renewable energy, standards, regulation, finance and maintenance. Planning is not installed infrastructure.
- Href
- https://transports.gouv.ci/actualites/mobilite-durable-en-cote-divoirele-comite-technique-lance-les-travaux-de-l-integration
- Publisher
- Secrétariat Général du Gouvernement / ONECI
- Publication Date
- 2024-06-27
- Accessed At
- 2026-08-11
- Scope
- Official journal index for Decree 2024-326 of 22 May 2024 on electric transport and charging infrastructure.
- Href
- https://jorci.oneci.ci/journaux-officiels/99
- Publisher
- LoiDici legal-text mirror
- Publication Date
- 2024-11-21
- Accessed At
- 2026-08-11
- Scope
- Text mirror: decree covers EVs, charging, importers, infrastructure operators and EV garages/personnel; EVs older than one year at import require technical-control certificate. Verify against official gazette before contracting.
- Href
- https://loidici.biz/2024/11/21/chapitre-1-dispositions-generales-34/lois-article-par-article/plus-de-textes-de-lois/60172/naty/
- Publisher
- LoiDici legal-text mirror
- Publication Date
- 2024-11-21
- Accessed At
- 2026-08-11
- Scope
- Text mirror: battery/waste treatment is State-regulated; private public-charging operators need technical/financial capacity, certification, Energy Ministry approval, grid connection and semiannual reporting. Verify implementing orders.
- Href
- https://loidici.biz/2024/11/21/chapitre-2-dispositions-relatives-aux-moyens-de-transport-electriques/lois-article-par-article/plus-de-textes-de-lois/60174/naty/
- Publisher
- LoiDici legal-text mirror
- Publication Date
- 2024-11-21
- Accessed At
- 2026-08-11
- Scope
- Text mirror: EV/charging investment follows ordinary investment law; repairs require a legal entity, qualified personnel and appropriate equipment. Competency implementing order must be obtained.
- Href
- https://loidici.biz/2024/11/21/chapitre-3-dispositions-diverses-transitoires-et-finales/lois-article-par-article/plus-de-textes-de-lois/60176/naty/
- Publisher
- Direction générale des Douanes de Côte d’Ivoire
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official FAQ under Decree 2017-792: 5 years for passenger cars/taxis, 7 for minibuses and trucks up to 5t, and 10 for larger buses/trucks, subject to stated exceptions.
- Href
- https://www.douanes.ci/tribune/faq.php
- Publisher
- Direction générale des Douanes de Côte d’Ivoire
- Publication Date
- 2017-12-06
- Accessed At
- 2026-08-11
- Scope
- Official legal record of import-age limits.
- Href
- https://www.douanes.ci/node/42795
- Publisher
- Direction générale des Douanes de Côte d’Ivoire
- Publication Date
- 2025-03-12
- Accessed At
- 2026-08-11
- Scope
- Official customs legal index lists Decree 2025-181 suspending export of waste and scrap used lead-acid batteries. Scope is not automatically lithium traction batteries.
- Href
- https://www.douanes.ci/info/decret
- Publisher
- Agence Ivoirienne de Presse
- Publication Date
- 2025-06-30
- Accessed At
- 2026-08-11
- Scope
- Government press agency reports 3 fast and 10 slow chargers at Petro-Ivoire Yopougon and 620 kWh/day solar/storage output. It labels charger ratings as kWh; unit ambiguity is preserved and requires field verification.
- Href
- https://www.aip.ci/213388/cote-divoire-aip-une-nouvelle-station-de-recharge-pour-vehicules-electriques-inauguree-a-yopougon/
- Publisher
- Agence Ivoirienne de Presse
- Publication Date
- 2025-11-17
- Accessed At
- 2026-08-11
- Scope
- Private operator announcement reported by AIP: planned stations every 150 km. Plan, not delivered infrastructure.
- Href
- https://www.aip.ci/279769/aip-vers-le-deploiement-dun-reseau-national-de-bornes-de-recharge-pour-accelerer-ladoption-des-vehicules-electriques-en-cote-divoire/
- Publisher
- CFAO Group
- Publication Date
- 2024-03-27
- Accessed At
- 2026-08-11
- Scope
- Official market entry: Atto 3 immediately, Dolphin and Dolphin Mini later, via sale or long-term rental.
- Href
- https://www.cfaogroup.com/fr/la-concession-loxea-dabidjan-propose-desormais-a-ses-clients-les-vehicules-byd/
- Publisher
- CFAO Group
- Publication Date
- 2024-07-15
- Accessed At
- 2026-08-11
- Scope
- Official evidence of Abidjan–Bouaké BYD demonstration and charging-system promotion; not sales or stock.
- Href
- https://www.cfaogroup.com/en/promoting-green-mobility-in-cote-divoire/
- Publisher
- Agence Ivoirienne de Presse
- Publication Date
- 2025-02-22
- Accessed At
- 2026-08-11
- Scope
- AIP reports BYD Tang alongside Atto 3 and Dolphin distribution through LOXEA; model availability, not national ranking.
- Href
- https://www.aip.ci/cote-divoire-aip-un-nouveau-modele-de-vehicule-electrique-sur-le-marche-ivoirien/
- Publisher
- BRVM
- Publication Date
- 2026-07-13
- Accessed At
- 2026-08-11
- Scope
- Primary listed-company report. Searchable relay used for detailed sales figures where the PDF was not text-extractable in this workflow.
- Href
- https://www.brvm.org/sites/default/files/20260713_-_rapport_annuel_-_exercice_2025_-_cfao_motors_ci.pdf
- Publisher
- Abidjan Eco
- Publication Date
- 2026-07-16
- Accessed At
- 2026-08-11
- Scope
- Secondary relay of company annual report: distributor new-vehicle market 29,995 in 2025 versus 26,271 in 2024; CFAO 12,486; BYD 51 versus 15. BYD total is not split BEV/PHEV and is not national EV sales or active stock.
- Href
- https://www.abidjan-eco.com/fr/article/cfao-mobility-cote-divoire-le-benefice-net-bondit-de-80-en-2025-grace-au-boom-automobile
- Publisher
- MG Motor Côte d’Ivoire / HR Motors
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official dealer model catalogue includes the all-electric Cyberster and hybrids. Availability/stock and sales volumes are not disclosed.
- Href
- https://mgmotorci.com/models
- Publisher
- MG Motor Côte d’Ivoire / HR Motors
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official dealer aftersales and workshop locations; warranty work must remain inside authorised channel.
- Href
- https://mgmotorci.com/mg-care
- Publisher
- Centre d’Information et de Communication Gouvernementale relay
- Publication Date
- 2025-03-01
- Accessed At
- 2026-08-11
- Scope
- Government-communications relay describes a narrower 10% target for the State fleet, conflicting with the June 2026 ministry page’s national-fleet framing. Both definitions are retained.
- Href
- https://news.abidjan.net/articles/739787/transports-transition-energetique-durable-le-gouvernement-ivoirien-vise-dici-a-2030-a-atteindre-10-de-vehicules-electriques-dans-le-parc-automobile-de-letat
- Publisher
- Le360 / AFP
- Publication Date
- 2025-03-03
- Accessed At
- 2026-08-11
- Scope
- Independent corroboration of State-fleet framing and €5.9m Low Carbon Transition project, 2023–2026. Secondary source.
- Href
- https://afrique.le360.ma/societe/la-cote-divoire-ambitionne-datteindre-10-de-vehicules-electriques-dans-le-parc-automobile-de-letat_IYUASMD5EFAB5NFSK46JM2LQUM/
- Publisher
- Commission Nationale du Fonds pour l’Environnement Mondial
- Publication Date
- 2025-08-13
- Accessed At
- 2026-08-11
- Scope
- Official commission page: project financed at about USD1.6m; project activity, not a grant automatically available to EVS.
- Href
- https://cnfem.finances.gouv.ci/2025/08/13/integration-de-la-mobilite-electrique-aux-energies-renouvelables-dans-les-zones-periurbaines-et-rurales/
- Publisher
- Portail officiel du Gouvernement
- Publication Date
- 2026-06-04
- Accessed At
- 2026-08-11
- Scope
- Official vehicle-fleet renewal financing and traceability context; not EV-specific demand.
- Href
- https://www.gouv.ci/actualite/lancement-de-la-plateforme-de-renouvellement-du-parc-automobile-le-fdtr-engage-une-nouvelle-dynamique-de-modernisation-et-de-financement-du-transport-routier-2285
- Publisher
- Ministère des Transports et des Affaires Maritimes
- Publication Date
- 2026-02-16
- Accessed At
- 2026-08-11
- Scope
- Official digital new-vehicle registration procedure expanded to accredited dealers from 1 March 2026; useful route for future data diligence.
- Href
- https://transports.gouv.ci/actualites/immatriculation-acceleree-des-vehicules-neufsl-operation-demarre-des-le-1er-mars-2026
- Publisher
- World Bank
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Current macro context: 6% real GDP growth in 2024 and 6.2% projected for 2025; not an EV-demand forecast.
- Href
- https://www.worldbank.org/ext/en/country/cotedivoire
- Publisher
- International Monetary Fund
- Publication Date
- 2025-04-08
- Accessed At
- 2026-08-11
- Scope
- Macroeconomic context and medium-term growth outlook; not EV market data.
- Href
- https://www.elibrary.imf.org/view/journals/002/2025/091/article-A001-en.xml
- Publisher
- World Bank
- Publication Date
- 2019-06-27
- Accessed At
- 2026-08-11
- Scope
- Official older context: about 10m trips/day and 20km BRT plan. Mobility intensity, not EV stock.
- Href
- https://www.worldbank.org/en/news/press-release/2019/06/27/cote-divoire-world-bank-approves-300-million-to-boost-urban-mass-transit-in-abidjan
- Publisher
- Portail officiel du Gouvernement
- Publication Date
- 2026-06-01
- Accessed At
- 2026-08-11
- Scope
- Official planned capacity and XOF423.166bn investment; project financing is not current site supply.
- Href
- https://www.gouv.ci/index.php/actualite/projet-dune-centrale-electrique-de-372mw-a-cycle-combine-a-songon-les-accords-financiers-signes-pour-un-investissement-global-de-423166-milliards-fcfa-7290
- Publisher
- Ministère des Mines, du Pétrole et de l’Énergie
- Publication Date
- 2024-10-18
- Accessed At
- 2026-08-11
- Scope
- Official energy-efficiency compliance route; confirm threshold/applicability to the selected workshop.
- Href
- https://www.energie.gouv.ci/actualite/efficacite-energetique-le-ministere-en-charge-de-lenergie-lance-les-audits-obligatoires
- Publisher
- ANARE-CI
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official electricity regulator and current tariff/complaints route. Site quote and connection study still required.
- Href
- https://anare.ci/
- Publisher
- CEPICI
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official investor one-stop shop lists Ordinance 2024-857 and approval process. Benefits are eligibility-, zone- and approval-specific.
- Href
- https://cepici.gouv.ci/agrement
- Publisher
- Direction générale des Impôts
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official analysis says the 2025 tax annex harmonised business-profit tax at 25%. Obtain current written tax advice for entity and activity.
- Href
- https://dgi.gouv.ci/assets/documents/EBOOK/BODGI_2025/files/basic-html/page109.html
- Publisher
- Service Public de Côte d’Ivoire
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official enterprise IDU/CEPICI registration route; company formation does not replace sector approvals.
- Href
- https://servicepublic.gouv.ci/accueil/detaildemarcheparticulier/1/455/100
- Publisher
- Ministère de l’Environnement
- Publication Date
- 2024-10-18
- Accessed At
- 2026-08-11
- Scope
- Official confirmation of Law 2023-900 of 23 November 2023 and environmental management framework.
- Href
- https://web2.environnement.gouv.ci/index.php/actualite/534
- Publisher
- Ministère de l’Environnement
- Publication Date
- 2023-06-01
- Accessed At
- 2026-08-11
- Scope
- Official explanation: EIES/AES/EESS, industrial/commercial/artisanal waste, e-waste and hazardous waste including lead are covered.
- Href
- https://environnement.gouv.ci/actualite/325
- Publisher
- Direction des Déchets Industriels et Substances Chimiques
- Publication Date
- 2025-08-13
- Accessed At
- 2026-08-11
- Scope
- Official regulator page: 49 approvals issued across collection/treatment categories and national traceability system announced. EVS must use approved routes.
- Href
- https://ddisc.environnement.gouv.ci/atelier-de-remise-officielle-des-agrements-et-cahiers-des-charges-huiles-usagees-et-residus-dhydrocarbures/
- Publisher
- Direction des Déchets Industriels et Substances Chimiques
- Publication Date
- 2026-03-02
- Accessed At
- 2026-08-11
- Scope
- Official current licensing window confirms regulated collection, transport, storage, recovery and disposal activity.
- Href
- https://ddisc.environnement.gouv.ci/6852-2/
- Publisher
- ARTCI
- Publication Date
- 2025-05-19
- Accessed At
- 2026-08-11
- Scope
- Official regulator reminder that private entities processing personal data fall under Law 2013-450 and privacy-by-design/default expectations.
- Href
- https://www.artci.ci/index.php/textes-de-reference/36-decrets.html
- Publisher
- ARTCI
- Publication Date
- 2026-03-02
- Accessed At
- 2026-08-11
- Scope
- Current regulator evidence of national compliance assessment of public/private data controllers.
- Href
- https://www.artci.ci/index.php/decisions-129/243-decision-autorite-de-protection-1.html
- Publisher
- CNPS
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official employer route: worker declaration from first day of employment and employer identification responsibilities.
- Href
- https://www.cnps.ci/employeur/
- Publisher
- CODINORM
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official standards-body route. Obtain adopted EV, electrical, lifting and workshop standards/editions in writing.
- Href
- https://www.codinorm.ci/
- Publisher
- ISO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International HV safety benchmark; Côte d’Ivoire law and adopted standards control.
- Href
- https://www.iso.org/standard/45477.html
- Publisher
- ISO
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International conductive charging interface benchmark; not proof of national adoption.
- Href
- https://www.iso.org/standard/68474.html
- Publisher
- IEC
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International EVSE benchmark; local Energy Ministry, utility, installer and certification approvals control.
- Href
- https://webstore.iec.ch/en/publication/33644
- Publisher
- UNECE
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- UN 38.3 lithium-battery transport testing context.
- Href
- https://unece.org/transport/dangerous-goods/rev8-files
- Publisher
- Basel Convention Secretariat
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Transboundary hazardous-waste controls; national and destination-country permits also apply.
- Href
- https://www.basel.int/TheConvention/Overview/tabid/1271/Default.aspx
- Publisher
- International Labour Organization
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- OSH management benchmark; does not replace Côte d’Ivoire labour and safety law.
- Href
- https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Rows and narrative retain their individual bracketed source identifiers; this registry entry only resolves block-level multi-source provenance.
- Href
- EVS://Cote-d-Ivoire/mixed-source-evidence
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Internal assumptions and calculations; no assumption is presented as sourced fact.
- Href
- EVS://Cote-d-Ivoire/market-entry-model
33
Validation register
Evidence, assumptions and operational implications are separated below.
Validation register
- Status
- Pass
- Detail
- Generated and reparsed.
- Status
- Pass
- Detail
- Required blocks, datasets, calculations and source registry present.
- Status
- Pass
- Detail
- Gate SAM and annual/90-day economics recomputed.
- Status
- Pass
- Detail
- Passenger plug-ins, all-vehicle parc, brand sales, target definitions, site chargers and plans remain separate.
- Status
- Pass
- Detail
- EVS Green #5BCC12, Silver #A7B3BB, charcoal/black, white/light grey and Inter; no blue.
- Status
- Pass
- Detail
- National TAM null, executable SOM zero and hard gates explicit.
34
EVS Board Position
CONDITIONAL GO for evidence-gated diligence and scheduled Greater Abidjan partner-clinic days; NO-GO standalone/franchise; HOLD traction-pack work.
Method / Sources and confidence
Where every figure
comes from.
Registrations, charging and legal requirements are read from primary sources. Where no official dataset exists, the model and its assumptions are published instead of a single unexplained number. This report is a dated snapshot: August 2026.
- 01Renouvellement du parc automobile : nouvelle plateforme digitale
- 02Nouvelle immatriculation initiale des véhicules : bilan
- 03Mobilité électrique : formation nationale à Abidjan
- 04Mobilité durable : comité technique du projet d’intégration
- 05Journal officiel n°2024-015 — Décret n°2024-326
- 06Décret 2024-326 — chapitre 1
- 07Décret 2024-326 — chapitre 2
- 08Décret 2024-326 — chapitre 3
- 09Limite d’âge des véhicules importés
- 10Décret 2017-792 : âge des véhicules d’occasion importés
- 11Suspension de l’exportation de déchets et débris de batteries au plomb usagés
- 12Station de recharge inaugurée à Yopougon
- 13Vers un réseau national de bornes de recharge
- 14LOXEA Abidjan offers BYD vehicles
- 15Promoting green mobility in Côte d’Ivoire
- 16Nouveau modèle de véhicule électrique sur le marché ivoirien
- 17CFAO Motors Côte d’Ivoire — rapport annuel 2025
- 18CFAO Mobility Côte d’Ivoire : résultats 2025
- 19MG Motor Côte d’Ivoire — models
- 20MG Care Côte d’Ivoire
- 21Transition énergétique durable : objectif EV dans le parc de l’État
- 22Côte d’Ivoire : 10% de véhicules électriques dans le parc de l’État
- 23Intégration de la mobilité électrique aux énergies renouvelables
- 24Lancement de la plateforme de renouvellement du parc automobile
- 25Immatriculation accélérée des véhicules neufs
- 26Côte d’Ivoire country overview
- 27Côte d’Ivoire 2024 Article IV / 2025 staff report
- 28Urban mass transit in Abidjan
- 29372 MW combined-cycle Songon power project
- 30Lancement des audits énergétiques obligatoires
- 31Autorité Nationale de Régulation du Secteur de l’Électricité
- 32Code des investissements — agrément
- 33Bulletin officiel DGI 2025 — harmonisation de l’impôt sur les bénéfices
- 34Certificat d’immatriculation unique d’entreprise
- 35Nouveau Code de l’Environnement — Loi 2023-900
- 36Nouveau Code de l’Environnement — innovations
- 37Agréments huiles usagées et résidus d’hydrocarbures
- 38Appel à agrément huiles usagées 2026–2027
- 39Protection des données personnelles — Loi 2013-450
- 40Recensement et conformité des responsables de traitement
- 41Employeur — obligations de déclaration
- 42CODINORM — organisme national de normalisation
- 43ISO 6469 electrified road-vehicle safety
- 44ISO 17409 conductive power transfer
- 45IEC 61851-1 conductive charging systems
- 46UN Manual of Tests and Criteria
- 47Basel Convention overview
- 48ILO-OSH 2001 guidelines
- 49Côte d'Ivoire mixed-source evidence tables
- 50EVS Côte d'Ivoire decision-gate and pilot model
Reports are commercial research, not legal, tax or investment advice.
Get the full Côte d'Ivoire report
The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.
Other markets in Africa.
Compare these markets04 / Not in your country yet?
Bring EVS
to your market.