Democratic Republic of the Congo
EVS Democratic Republic of the Congo EV Service Centre Market Entry
Decision-grade DRC assessment separating unavailable active passenger plug-in data, all-powertrain proxies, MoUs, buses, motorcycles/swaps, charging evidence, industrial battery projects and EVS assumptions.
No authoritative active passenger BEV/PHEV stock series.
No verified public passenger connector census.
Only after 500 separately verified active Greater Kinshasa plug-ins.
Partner-clinic assumption on USD 25,000 reversible capex.
The verdict in full
Evidence, assumptions and operational implications are separated below.
Market headline
Evidence, assumptions and operational implications are separated below.
Market headline
| Metric | Value | Unit | Status |
|---|---|---|---|
| Current active passenger/light-commercial BEV/PHEV stock | — | vehicles | No authoritative separated active-stock series located. |
| Verified public passenger-EV connectors | — | connectors | No authoritative national/site/connector census located. |
| Announced public-fleet electric cars | 1,000 | cars | MoU roadmap only; not contract, delivery, registration or stock [vingroup_dec]. |
| Greater Kinshasa launch threshold | 500 | active plug-ins | EVS gate requiring matched registrations. |
| Gate SAM | 270 | jobs/year | Activates only after every hard gate. |
| Executable SOM | 0 | jobs | Zero before hard gates. |
- Value
- —
- Unit
- vehicles
- Status
- No authoritative separated active-stock series located.
- Value
- —
- Unit
- connectors
- Status
- No authoritative national/site/connector census located.
- Value
- 1,000
- Unit
- cars
- Status
- MoU roadmap only; not contract, delivery, registration or stock [vingroup_dec].
- Value
- 500
- Unit
- active plug-ins
- Status
- EVS gate requiring matched registrations.
- Value
- 270
- Unit
- jobs/year
- Status
- Activates only after every hard gate.
- Value
- 0
- Unit
- jobs
- Status
- Zero before hard gates.
Macroeconomic context
Evidence, assumptions and operational implications are separated below.
Macroeconomic context
| Metric | Value | Interpretation |
|---|---|---|
| 2025 real GDP growth | 5.5% | World Bank estimate [worldbank_country]. |
- Value
- 5.5%
- Interpretation
- World Bank estimate [worldbank_country].
Market size and vehicle parc context
No authoritative national all-powertrain parc or active passenger/light-commercial plug-in denominator was located. The Kinshasa >800,000 figure is a secondary all-powertrain proxy only.
Market size and vehicle parc context
| Metric | Value | Unit | Definition |
|---|---|---|---|
| National all-powertrain parc | — | vehicles | No authoritative current national count located. |
| Kinshasa all-powertrain proxy | >800,000 | vehicles | Secondary OVD-attributed 2025 estimate; no propulsion/class/active split [ovd_parc_proxy]. |
| Current passenger/light-commercial plug-in TAM | — | vehicles | Requires matched active registrations. |
| Executable service market | 0 | jobs | No paid service launch before gates. |
- Value
- —
- Unit
- vehicles
- Definition
- No authoritative current national count located.
- Value
- >800,000
- Unit
- vehicles
- Definition
- Secondary OVD-attributed 2025 estimate; no propulsion/class/active split [ovd_parc_proxy].
- Value
- —
- Unit
- vehicles
- Definition
- Requires matched active registrations.
- Value
- 0
- Unit
- jobs
- Definition
- No paid service launch before gates.
BEV/PHEV sales, stock and adoption history
No authoritative annual BEV/PHEV sales or active-stock history was located. MoUs and announced delivery intentions remain separate.
BEV/PHEV sales, stock and adoption history
| Period | Bev Sales | Phev Sales | Active Bev Stock | Active Phev Stock | Note |
|---|---|---|---|---|---|
| Annual series through evidence cutoff | — | — | — | — | No authoritative separated national history located. |
| September 2025 | — | — | — | — | Study-stage Vingroup MoU; conversion of >300,000 ICE vehicles is an ambition, not stock [vingroup_earlier]. |
| December 2025 | — | — | — | — | MoU roadmap announced 1,000 public-fleet cars and separate private distribution intent [vingroup_dec]. |
| February 2026 | — | — | — | — | Taxi MoU names Limo Green and Herio Green but gives no quantity/delivery [vinfast_taxi]. |
| 11 August 2026 evidence cutoff | — | — | — | — | No primary delivery/registration confirmation located. |
- Bev Sales
- —
- Phev Sales
- —
- Active Bev Stock
- —
- Active Phev Stock
- —
- Note
- No authoritative separated national history located.
- Bev Sales
- —
- Phev Sales
- —
- Active Bev Stock
- —
- Active Phev Stock
- —
- Note
- Study-stage Vingroup MoU; conversion of >300,000 ICE vehicles is an ambition, not stock [vingroup_earlier].
- Bev Sales
- —
- Phev Sales
- —
- Active Bev Stock
- —
- Active Phev Stock
- —
- Note
- MoU roadmap announced 1,000 public-fleet cars and separate private distribution intent [vingroup_dec].
- Bev Sales
- —
- Phev Sales
- —
- Active Bev Stock
- —
- Active Phev Stock
- —
- Note
- Taxi MoU names Limo Green and Herio Green but gives no quantity/delivery [vinfast_taxi].
- Bev Sales
- —
- Phev Sales
- —
- Active Bev Stock
- —
- Active Phev Stock
- —
- Note
- No primary delivery/registration confirmation located.
Definition reconciliation
Evidence, assumptions and operational implications are separated below.
Definition reconciliation
| Item | Include In Current Tam | Current Count |
|---|---|---|
| Active passenger/light-commercial BEV/PHEV | Yes, if matched and active | Unknown |
| Vingroup/VinFast MoU quantities | No | Intent/roadmap only |
| Electric buses | No | Separate heavy-fleet workstream |
| Electric motorcycles / battery swapping | No | Separate pilot/workstream [peto] |
| Battery/EV industrial special zone | No | Industrial policy/project [uneca_framework] |
| Kinshasa >800k vehicle proxy | No | All powertrains, unknown active/class split |
- Include In Current Tam
- Yes, if matched and active
- Current Count
- Unknown
- Include In Current Tam
- No
- Current Count
- Intent/roadmap only
- Include In Current Tam
- No
- Current Count
- Separate heavy-fleet workstream
- Include In Current Tam
- No
- Current Count
- Separate pilot/workstream [peto]
- Include In Current Tam
- No
- Current Count
- Industrial policy/project [uneca_framework]
- Include In Current Tam
- No
- Current Count
- All powertrains, unknown active/class split
Cautious / base / high scenarios
These are EVS fulfilment sensitivities on passenger-car quantities in MoUs. They are not contracts, deliveries, registrations or an official forecast; buses and motorcycles are excluded.
Cautious / base / high scenarios
| Scenario | Modelled 2030 Active Passenger Lcv Plug Ins | Formula | Basis |
|---|---|---|---|
| Cautious | 250 | 1,000 announced public cars × 25% | EVS MoU-fulfilment sensitivity. The 2025/2026 documents are non-binding MoUs/announcements, not contracts, deliveries, registrations, stock or an official forecast. Electric buses and motorcycles are excluded. |
| Base | 1,000 | 1,000 announced public cars × 100% | EVS MoU-fulfilment sensitivity. The 2025/2026 documents are non-binding MoUs/announcements, not contracts, deliveries, registrations, stock or an official forecast. Electric buses and motorcycles are excluded. |
| High | 2,000 | 1,000 announced public cars + 10,000 lower-bound private distribution intent × 10% | EVS MoU-fulfilment sensitivity. The 2025/2026 documents are non-binding MoUs/announcements, not contracts, deliveries, registrations, stock or an official forecast. Electric buses and motorcycles are excluded. |
- Modelled 2030 Active Passenger Lcv Plug Ins
- 250
- Formula
- 1,000 announced public cars × 25%
- Basis
- EVS MoU-fulfilment sensitivity. The 2025/2026 documents are non-binding MoUs/announcements, not contracts, deliveries, registrations, stock or an official forecast. Electric buses and motorcycles are excluded.
- Modelled 2030 Active Passenger Lcv Plug Ins
- 1,000
- Formula
- 1,000 announced public cars × 100%
- Basis
- EVS MoU-fulfilment sensitivity. The 2025/2026 documents are non-binding MoUs/announcements, not contracts, deliveries, registrations, stock or an official forecast. Electric buses and motorcycles are excluded.
- Modelled 2030 Active Passenger Lcv Plug Ins
- 2,000
- Formula
- 1,000 announced public cars + 10,000 lower-bound private distribution intent × 10%
- Basis
- EVS MoU-fulfilment sensitivity. The 2025/2026 documents are non-binding MoUs/announcements, not contracts, deliveries, registrations, stock or an official forecast. Electric buses and motorcycles are excluded.
Charging infrastructure
A planned authorized network and a motorcycle-swap pilot are not a commissioned public passenger-car connector census.
Charging infrastructure
| Category | Count | Status |
|---|---|---|
| Verified public passenger-car charging sites/connectors | — | No authoritative site/connector census located. |
| Vingroup/VinFast network | — | Planned under MoUs; no commissioned-site count [vingroup_dec]. |
| PETO swap infrastructure | — | Motorcycle pilot; not passenger-car EVSE [peto]. |
| Workshop supply | — | Premises-specific utility/load/earthing/protection assessment required. |
- Count
- —
- Status
- No authoritative site/connector census located.
- Count
- —
- Status
- Planned under MoUs; no commissioned-site count [vingroup_dec].
- Count
- —
- Status
- Motorcycle pilot; not passenger-car EVSE [peto].
- Count
- —
- Status
- Premises-specific utility/load/earthing/protection assessment required.
Electricity and grid readiness
Electricity access, customer accounts, consumption and passenger-EV connectors have different definitions and are not combined.
forecast chart context
The scenario bars test only how much of announced passenger-car intent might become active by 2030. They do not validate the MoUs or replace a registration forecast.
2030 passenger plug-in MoU fulfilment sensitivities
Active passenger/light-commercial vehicles; EVS scenarios, not an official forecast.
Electricity and grid readiness
| Metric | Value | Period | Meaning |
|---|---|---|---|
| Electricity access | 21% | 2025 | Population access context; not vehicle-charging coverage [wb_energy]. |
- Value
- 21%
- Period
- 2025
- Meaning
- Population access context; not vehicle-charging coverage [wb_energy].
Vehicle parc age and service demand
Evidence, assumptions and operational implications are separated below.
Vehicle parc age and service demand
| Driver | Evidence | Implication |
|---|---|---|
| Used-vehicle age ceiling | Most imported used vehicles may be up to 15 years under current secondary reporting [used_import_2026]. | Inspect VIN, age, condition, corrosion and prior repairs; do not infer average age. |
| Semi-annual technical inspection in Kinshasa | Current enforcement communication [acp_inspection]. | Potential inspection-readiness and safety-screening demand; respect authorized-inspection boundary. |
| Import-dependent parts | Reserves below three months of imports [imf_may]. | Deposits, supported-VIN list and parts SLA before bookings. |
| Road/voltage environment | No comparable EV repair-frequency dataset located. | Pilot must measure tyres, suspension, brakes, cooling and 12V incidence; no invented frequency. |
- Evidence
- Most imported used vehicles may be up to 15 years under current secondary reporting [used_import_2026].
- Implication
- Inspect VIN, age, condition, corrosion and prior repairs; do not infer average age.
- Evidence
- Current enforcement communication [acp_inspection].
- Implication
- Potential inspection-readiness and safety-screening demand; respect authorized-inspection boundary.
- Evidence
- Reserves below three months of imports [imf_may].
- Implication
- Deposits, supported-VIN list and parts SLA before bookings.
- Evidence
- No comparable EV repair-frequency dataset located.
- Implication
- Pilot must measure tyres, suspension, brakes, cooling and 12V incidence; no invented frequency.
EVS assumptions
Evidence, assumptions and operational implications are separated below.
EVS assumptions
| Assumption | Value | Classification |
|---|---|---|
| Launch denominator | 500 active registered passenger/light-commercial plug-ins in Greater Kinshasa | EVS hard gate; not a market estimate |
| Active factor | 90% | EVS sensitivity |
| Independent reach | 50% | EVS sensitivity reflecting OEM/captive fleets |
| Service events | 1.20 per reachable vehicle/year | EVS sensitivity |
| Gate ARO | USD 200 equivalent, VAT-exclusive | EVS planning assumption; no CDF translation |
| Reversible capex ceiling | USD 25,000 equivalent | EVS board control |
- Value
- 500 active registered passenger/light-commercial plug-ins in Greater Kinshasa
- Classification
- EVS hard gate; not a market estimate
- Value
- 90%
- Classification
- EVS sensitivity
- Value
- 50%
- Classification
- EVS sensitivity reflecting OEM/captive fleets
- Value
- 1.20 per reachable vehicle/year
- Classification
- EVS sensitivity
- Value
- USD 200 equivalent, VAT-exclusive
- Classification
- EVS planning assumption; no CDF translation
- Value
- USD 25,000 equivalent
- Classification
- EVS board control
Transparent TAM / SAM / SOM
Current national TAM remains null and executable SOM zero. The quantified opportunity is a board gate, not a market estimate.
Transparent TAM / SAM / SOM
| Layer | Value | Unit | Formula | Status |
|---|---|---|---|---|
| TAM — current national passenger/light-commercial plug-ins | — | active vehicles | Matched national registration extract | Unavailable; do not proxy with MoUs, buses, motorcycles or all-powertrain parc. |
| SAM — Greater Kinshasa launch-gate pool | 270 | jobs/year | 500 × 90% active × 50% reach × 1.20 events | Decision gate only, activated after registrations and all hard gates. |
| SAM revenue at gate | 54,000 | USD-equivalent/year | 270 × USD 200 | EVS VAT-exclusive planning sensitivity. |
- Value
- —
- Unit
- active vehicles
- Formula
- Matched national registration extract
- Status
- Unavailable; do not proxy with MoUs, buses, motorcycles or all-powertrain parc.
- Value
- 270
- Unit
- jobs/year
- Formula
- 500 × 90% active × 50% reach × 1.20 events
- Status
- Decision gate only, activated after registrations and all hard gates.
- Value
- 54,000
- Unit
- USD-equivalent/year
- Formula
- 270 × USD 200
- Status
- EVS VAT-exclusive planning sensitivity.
Customer and fleet segments
Evidence, assumptions and operational implications are separated below.
Customer and fleet segments
| Segment | Priority | Need | Proof |
|---|---|---|---|
| VinFast/Exposure taxi/public fleet | Conditional | Diagnostics, chassis, tyres, cooling and triage only if OEM/warranty boundary allows. | Supported VIN list, paid trial and written warranty/service boundary. |
| Multi-brand imported used EV owners | Primary future niche | Inspection, state-of-health screening, 12V, brakes, tyres, suspension and cooling. | Matched registrations plus paid deposits. |
| Corporate/mining fleets in Copperbelt | Second wave | Reliability, telemetry and site charging. | Verified plug-in fleet, paid trial, security/logistics and OEM parts route. |
| Electric buses | Separate | Depot/OEM heavy-vehicle capability. | In-service fleet and maintenance contract; excluded from passenger model. |
| Motorcycles/swap fleets | Separate | Two-wheel battery/swapping operations. | Separate technical/economic model [peto]. |
- Priority
- Conditional
- Need
- Diagnostics, chassis, tyres, cooling and triage only if OEM/warranty boundary allows.
- Proof
- Supported VIN list, paid trial and written warranty/service boundary.
- Priority
- Primary future niche
- Need
- Inspection, state-of-health screening, 12V, brakes, tyres, suspension and cooling.
- Proof
- Matched registrations plus paid deposits.
- Priority
- Second wave
- Need
- Reliability, telemetry and site charging.
- Proof
- Verified plug-in fleet, paid trial, security/logistics and OEM parts route.
- Priority
- Separate
- Need
- Depot/OEM heavy-vehicle capability.
- Proof
- In-service fleet and maintenance contract; excluded from passenger model.
- Priority
- Separate
- Need
- Two-wheel battery/swapping operations.
- Proof
- Separate technical/economic model [peto].
Leading EV brands and models
Evidence, assumptions and operational implications are separated below.
Leading EV brands and models
| Brand Or Model | Status | Service Implication |
|---|---|---|
| VinFast Limo Green / Herio Green | Named in February 2026 taxi MoU; no quantity/delivery confirmed [vinfast_taxi]. | Do not claim installed base; seek OEM/warranty/tool access. |
| Other BEV/PHEV brands/models | No authoritative registration ranking located. | Build supported VIN/task matrix only from matched registry/dealer/import evidence. |
| Toyota/CFAO, GWM/Tractafric, Changan/Colonne | Visible dealer/aftersales presence; no audited EV stock/HV capability [toyota_drc] [gwm_tractafric] [colonne_motors]. | Competitor/partner interviews; no EV claims. |
- Status
- Named in February 2026 taxi MoU; no quantity/delivery confirmed [vinfast_taxi].
- Service Implication
- Do not claim installed base; seek OEM/warranty/tool access.
- Status
- No authoritative registration ranking located.
- Service Implication
- Build supported VIN/task matrix only from matched registry/dealer/import evidence.
- Status
- Visible dealer/aftersales presence; no audited EV stock/HV capability [toyota_drc] [gwm_tractafric] [colonne_motors].
- Service Implication
- Competitor/partner interviews; no EV claims.
Independent and OEM competitors
Evidence, assumptions and operational implications are separated below.
Independent and OEM competitors
| Competitor | Position | Threat |
|---|---|---|
| VinFast / Exposure authorized ecosystem | Planned charging and authorized workshop network. | High if MoUs convert; direct future OEM/captive competitor [vingroup_dec]. |
| Toyota / CFAO Mobility | Established national aftersales network. | High conventional trust/parts footprint; EV capability unverified [toyota_drc]. |
- Position
- Planned charging and authorized workshop network.
- Threat
- High if MoUs convert; direct future OEM/captive competitor [vingroup_dec].
- Position
- Established national aftersales network.
- Threat
- High conventional trust/parts footprint; EV capability unverified [toyota_drc].
Priority cities and regions
Evidence, assumptions and operational implications are separated below.
Priority cities and regions
| Rank | Region | Decision | Reason |
|---|---|---|---|
| 1 | Greater Kinshasa | Only pilot location | Announced EV initiatives, largest proxy vehicle base and accessible OEM/dealer ecosystem. |
- Region
- Greater Kinshasa
- Decision
- Only pilot location
- Reason
- Announced EV initiatives, largest proxy vehicle base and accessible OEM/dealer ecosystem.
Consumer incentives and policy
Evidence, assumptions and operational implications are separated below.
Consumer incentives and policy
| Instrument | Status | Evs Treatment |
|---|---|---|
| EV purchase/import incentive | Not confirmed | Assume zero benefit; obtain written DGDA/DGI ruling. |
| Kinshasa/Vingroup support | City commitments in MoU remain implementation-stage | Do not value land, sites, electricity or tax support until signed and budgeted [vingroup_dec]. |
- Status
- Not confirmed
- Evs Treatment
- Assume zero benefit; obtain written DGDA/DGI ruling.
- Status
- City commitments in MoU remain implementation-stage
- Evs Treatment
- Do not value land, sites, electricity or tax support until signed and budgeted [vingroup_dec].
Business, tax and investment incentives
No EV-specific benefit is used. Written current DGDA, DGI and ANAPI confirmation is required.
Business, tax and investment incentives
| Item | Current Evidence | Evs Action |
|---|---|---|
| Corporate income tax | 30% standard; minimum-tax rules [pwc_cit]. | Local advice and DGI confirmation. |
| VAT | 16% standard [pwc_vat]. | Confirm invoices, imports and recoverability. |
- Current Evidence
- 30% standard; minimum-tax rules [pwc_cit].
- Evs Action
- Local advice and DGI confirmation.
- Current Evidence
- 16% standard [pwc_vat].
- Evs Action
- Confirm invoices, imports and recoverability.
Labour, licensing and workshop regulation
Every material authorization is a launch gate; this is not legal, tax, engineering or insurance advice.
Labour, licensing and workshop regulation
| Domain | Requirement | Gate |
|---|---|---|
| Entity/tax/social security | Register entity/branch, tax, standardized invoicing and CNSS before trade [dgi_cit] [pwc_developments] [cnss]. | Written counsel/accountant checklist. |
| Premises/classified installation | Screen workshop, storage, chargers and chemicals under Decree 13/015 [classified_installations]. | Permit/declaration and environmental/fire approvals. |
- Requirement
- Register entity/branch, tax, standardized invoicing and CNSS before trade [dgi_cit] [pwc_developments] [cnss].
- Gate
- Written counsel/accountant checklist.
- Requirement
- Screen workshop, storage, chargers and chemicals under Decree 13/015 [classified_installations].
- Gate
- Permit/declaration and environmental/fire approvals.
High-voltage controls
Evidence, assumptions and operational implications are separated below.
High-voltage controls
| Control | Requirement |
|---|---|
| Scope | No de-energized HV component work until assessed competence, OEM method and insurer acceptance. |
| Isolation | VIN-specific shutdown, lockout/tagout, prove-dead, key control and independent sign-off. |
| Facility | Restricted bay, insulated tools/PPE, calibrated meter, rescue hook, eyewash, spill/fire plan and drill. |
| Charging | Utility/load study, earthing, RCD/protection, labeling and commissioning by authorized electrical parties. |
| Reference standards | Contract/insurer benchmarks may include ISO 6469, ISO 17409, IEC 61851 and UN R100; national adoption is unconfirmed [iso_6469] [iso_17409] [iec_61851] [un_r100]. |
- Requirement
- No de-energized HV component work until assessed competence, OEM method and insurer acceptance.
- Requirement
- VIN-specific shutdown, lockout/tagout, prove-dead, key control and independent sign-off.
- Requirement
- Restricted bay, insulated tools/PPE, calibrated meter, rescue hook, eyewash, spill/fire plan and drill.
- Requirement
- Utility/load study, earthing, RCD/protection, labeling and commissioning by authorized electrical parties.
- Requirement
- Contract/insurer benchmarks may include ISO 6469, ISO 17409, IEC 61851 and UN R100; national adoption is unconfirmed [iso_6469] [iso_17409] [iec_61851] [un_r100].
Battery and waste controls
Evidence, assumptions and operational implications are separated below.
Battery and waste controls
| Stage | Decision | Control |
|---|---|---|
| Intact vehicle diagnostics | Conditional after HV gate | No pack opening; thermal observation and quarantine escalation. |
| Pack/module removal or opening | HOLD | Written environmental/fire/insurer/OEM method and trained team. |
- Decision
- Conditional after HV gate
- Control
- No pack opening; thermal observation and quarantine escalation.
- Decision
- HOLD
- Control
- Written environmental/fire/insurer/OEM method and trained team.
Recommended service portfolio
Evidence, assumptions and operational implications are separated below.
Recommended service portfolio
| Phase | Service | Status |
|---|---|---|
| Launch | Non-invasive scan, 12V, tyres/alignment, brakes, suspension, cooling, cabin filters and visual HV screen. | Conditional go after VIN/task, tool, competence and insurer gates. |
| Launch | Pre-purchase/condition report and technical-inspection readiness. | Clarify not statutory inspection. |
| Launch | Fleet triage, scheduled clinic and referral. | Paid trial; OEM/warranty boundary. |
| Later | EVSE inspection/maintenance. | Only with electrical authorization, adopted standards and operator agreement. |
| Hold | Pack opening, module repair, battery storage/shipping, unsupported flashing/coding. | No-go until written gates. |
- Service
- Non-invasive scan, 12V, tyres/alignment, brakes, suspension, cooling, cabin filters and visual HV screen.
- Status
- Conditional go after VIN/task, tool, competence and insurer gates.
- Service
- Pre-purchase/condition report and technical-inspection readiness.
- Status
- Clarify not statutory inspection.
- Service
- Fleet triage, scheduled clinic and referral.
- Status
- Paid trial; OEM/warranty boundary.
- Service
- EVSE inspection/maintenance.
- Status
- Only with electrical authorization, adopted standards and operator agreement.
- Service
- Pack opening, module repair, battery storage/shipping, unsupported flashing/coding.
- Status
- No-go until written gates.
Operating model
Evidence, assumptions and operational implications are separated below.
Operating model
| Element | Recommendation |
|---|---|
| Format | One certified partner bay in Greater Kinshasa; scheduled clinic days; no standalone lease. |
| Governance | EVS owns SOP, competence, diagnostic evidence, audit and brand; partner owns lawful premises and routine mechanics. |
| Commercial | Deposits, supported-VIN list, parts prepayment, USD-equivalent planning with compliant invoice/accounting currency and BCC conversion at transaction date. |
| Parts/software | No promise without tool/license/parts route; refer OEM/warranty work. |
| Expansion | No Lubumbashi/Kolwezi clinic until a verified paid corporate/mining fleet workstream clears separate gates. |
- Recommendation
- One certified partner bay in Greater Kinshasa; scheduled clinic days; no standalone lease.
- Recommendation
- EVS owns SOP, competence, diagnostic evidence, audit and brand; partner owns lawful premises and routine mechanics.
- Recommendation
- Deposits, supported-VIN list, parts prepayment, USD-equivalent planning with compliant invoice/accounting currency and BCC conversion at transaction date.
- Recommendation
- No promise without tool/license/parts route; refer OEM/warranty work.
- Recommendation
- No Lubumbashi/Kolwezi clinic until a verified paid corporate/mining fleet workstream clears separate gates.
Franchise pathway
Evidence, assumptions and operational implications are separated below.
Franchise pathway
| Stage | Format | Entry Gate |
|---|---|---|
| 0 — diligence | No franchise offer | Registry, legal, partner and paid demand. |
| 1 — partner clinic | Revocable service licence / managed clinic | Two assessed technicians, controls, 35 bookings and paid fleet trial. |
| 2 — micro-hub | Only after two positive pilot cycles | 500+ active Greater Kinshasa plug-ins and unit economics sustained. |
| 3 — franchise | Deferred | Repeatable demand, parts/software access, audit, insurance and battery route. |
- Format
- No franchise offer
- Entry Gate
- Registry, legal, partner and paid demand.
- Format
- Revocable service licence / managed clinic
- Entry Gate
- Two assessed technicians, controls, 35 bookings and paid fleet trial.
- Format
- Only after two positive pilot cycles
- Entry Gate
- 500+ active Greater Kinshasa plug-ins and unit economics sustained.
- Format
- Deferred
- Entry Gate
- Repeatable demand, parts/software access, audit, insurance and battery route.
Pilot steady-state economics
All volumes, prices, margins, costs and capex are EVS assumptions in USD-equivalent planning values, VAT-exclusive and pre-tax; no CDF conversion is asserted.
Pilot steady-state economics
| Scenario | Jobs | Aro Usd | Gross Margin Pct | Opex Usd | Revenue Usd | Gross Profit Usd | Ebitda Usd | Payback Years |
|---|---|---|---|---|---|---|---|---|
| Cautious | 45 | 160 | 55 | 5,000 | 7,200 | 3,960 | -1,040 | — |
- Jobs
- 45
- Aro Usd
- 160
- Gross Margin Pct
- 55
- Opex Usd
- 5,000
- Revenue Usd
- 7,200
- Gross Profit Usd
- 3,960
- Ebitda Usd
- -1,040
- Payback Years
- —
90-day pilot economics
Evidence, assumptions and operational implications are separated below.
90-day pilot economics
| Scenario | Jobs 90d | Aro Usd | Gross Margin Pct | Opex Usd | Revenue Usd | Gross Profit Usd | Ebitda Usd |
|---|---|---|---|---|---|---|---|
| Cautious | 11 | 160 | 55 | 1,250 | 1,760 | 968 | -282 |
- Jobs 90d
- 11
- Aro Usd
- 160
- Gross Margin Pct
- 55
- Opex Usd
- 1,250
- Revenue Usd
- 1,760
- Gross Profit Usd
- 968
- Ebitda Usd
- -282
Risks and mitigations
Evidence, assumptions and operational implications are separated below.
Risks and mitigations
| Risk | Likelihood | Impact | Mitigation |
|---|---|---|---|
| No verified active passenger plug-in denominator | High | Critical | Matched active registration/import/dealer extract before capex. |
| MoU quantities mistaken for deliveries | High | Critical | Count VIN registrations only; retain null current TAM. |
| VinFast authorized ecosystem captures fleet service | High | High | Multi-brand niche, warranty-safe referral and no exclusivity. |
| No public connector census / weak premises power | High | High | Site/connector audit and premises load/earthing/outage study [wb_energy]. |
| Conflict/security/logistics | High | Critical | Kinshasa-only reversible pilot; no eastern capex [imf_june]. |
| FX and imported-parts delay | High | High | Supported VIN list, deposits, low inventory and no stockless SLA [imf_may]. |
| Battery fire/electric shock | Low | Critical | No pack work; isolation SOP, restricted bay, PPE/rescue gear and drills. |
| No approved traction-battery recipient | High | Critical | No custody before written classification and acceptance [unep_waste]. |
| Tax/customs/incentive uncertainty | High | High | Zero incentive in economics and written ruling. |
| Paid demand below threshold | High | High | Bookings, paid trial and day-90 stop. |
- Likelihood
- High
- Impact
- Critical
- Mitigation
- Matched active registration/import/dealer extract before capex.
- Likelihood
- High
- Impact
- Critical
- Mitigation
- Count VIN registrations only; retain null current TAM.
- Likelihood
- High
- Impact
- High
- Mitigation
- Multi-brand niche, warranty-safe referral and no exclusivity.
- Likelihood
- High
- Impact
- High
- Mitigation
- Site/connector audit and premises load/earthing/outage study [wb_energy].
- Likelihood
- High
- Impact
- Critical
- Mitigation
- Kinshasa-only reversible pilot; no eastern capex [imf_june].
- Likelihood
- High
- Impact
- High
- Mitigation
- Supported VIN list, deposits, low inventory and no stockless SLA [imf_may].
- Likelihood
- Low
- Impact
- Critical
- Mitigation
- No pack work; isolation SOP, restricted bay, PPE/rescue gear and drills.
- Likelihood
- High
- Impact
- Critical
- Mitigation
- No custody before written classification and acceptance [unep_waste].
- Likelihood
- High
- Impact
- High
- Mitigation
- Zero incentive in economics and written ruling.
- Likelihood
- High
- Impact
- High
- Mitigation
- Bookings, paid trial and day-90 stop.
90-day entry plan
Evidence, assumptions and operational implications are separated below.
90-day entry plan
| Days | Objective | Actions | Owner | Deliverable |
|---|---|---|---|---|
| 0–15 | Definition and legal gate | Obtain matched VIN-level registration/import/dealer extract; map entity, tax, CNSS, premises, inspection boundary, electricity, fire, environment, waste, data and insurance. | EVS board / DRC counsel | Definition and compliance file. |
- Objective
- Definition and legal gate
- Actions
- Obtain matched VIN-level registration/import/dealer extract; map entity, tax, CNSS, premises, inspection boundary, electricity, fire, environment, waste, data and insurance.
- Owner
- EVS board / DRC counsel
- Deliverable
- Definition and compliance file.
Explicit go / no-go gates
Evidence, assumptions and operational implications are separated below.
Explicit go / no-go gates
| Gate | Go | No Go |
|---|---|---|
| Market denominator | Matched extract proves at least 500 active passenger/light-commercial BEV/PHEVs in Greater Kinshasa, separately identified. | Class/propulsion/city/active status cannot be separated or count below 500. |
- Go
- Matched extract proves at least 500 active passenger/light-commercial BEV/PHEVs in Greater Kinshasa, separately identified.
- No Go
- Class/propulsion/city/active status cannot be separated or count below 500.
Methodology
Evidence, assumptions and operational implications are separated below.
Methodology
| Step | Method |
|---|---|
| 1. Evidence hierarchy | Primary DRC authorities, official companies and multilaterals first; current secondary legal/dealer reporting explicitly labelled. |
| 2. Definition control | Separate active passenger/light-commercial BEV/PHEV, all-powertrain proxies, MoUs, buses, motorcycles/swaps, industrial battery projects and passenger EVSE. |
| 3. Current market | Leave national current passenger TAM and public connector count null until matched authoritative extracts. |
| 4. Forecast sensitivity | Apply explicit fulfilment percentages only to announced passenger-car quantities; exclude buses and motorcycles. Not an official forecast. |
| 5. Gate SAM | 500 Greater Kinshasa plug-ins × 90% active × 50% reach × 1.20 events. |
| 6. SOM | Zero before all hard gates. |
| 7. Economics | USD-equivalent, VAT-exclusive/pre-tax EVS assumptions; no CDF conversion or incentive benefit; volumes remain within gate SAM. |
| 8. Regulation | No incentive, permit, credential, standard adoption or waste route assumed without written current confirmation. |
| 9. Validation | JSON, schema, formulas, citations, links, branding, definition control, duplicate search and template-residue checks. |
- Method
- Primary DRC authorities, official companies and multilaterals first; current secondary legal/dealer reporting explicitly labelled.
- Method
- Separate active passenger/light-commercial BEV/PHEV, all-powertrain proxies, MoUs, buses, motorcycles/swaps, industrial battery projects and passenger EVSE.
- Method
- Leave national current passenger TAM and public connector count null until matched authoritative extracts.
- Method
- Apply explicit fulfilment percentages only to announced passenger-car quantities; exclude buses and motorcycles. Not an official forecast.
- Method
- 500 Greater Kinshasa plug-ins × 90% active × 50% reach × 1.20 events.
- Method
- Zero before all hard gates.
- Method
- USD-equivalent, VAT-exclusive/pre-tax EVS assumptions; no CDF conversion or incentive benefit; volumes remain within gate SAM.
- Method
- No incentive, permit, credential, standard adoption or waste route assumed without written current confirmation.
- Method
- JSON, schema, formulas, citations, links, branding, definition control, duplicate search and template-residue checks.
economics chart context
The economics bars are capacity-disciplined partner-clinic sensitivities. Only the base case is a continuation gate; current executable volume remains zero.
Greater Kinshasa partner-clinic EBITDA
USD-equivalent; EVS steady-state planning assumptions.
Evidence gaps
Evidence, assumptions and operational implications are separated below.
Evidence gaps
| Gap | Needed | Decision Effect |
|---|---|---|
| Active passenger/light-commercial BEV and PHEV count | Matched registration/import/dealer extract by VIN, propulsion, class, city and active status | Blocks TAM, standalone centre and franchise. |
| Annual BEV/PHEV sales/stock/model history | VIN/homologation classifications and annual registration table | Blocks forecast calibration and service mix. |
| MoU conversion/delivery status | Signed contracts, customs entries, registered VINs, in-service fleet and maintenance/charging contracts | Prevents announcement inflation. |
| Public charging census | Site, connector, standard, kW, access, tariff, uptime and commissioning | Blocks network-service claim. |
| Workshop/HV competence route | Written labour/inspectorate/electrical/fire/insurer requirements and adopted editions | Blocks repair launch. |
| Traction-battery waste route | Written classification, storage, carrier and approved recipient | Holds pack work. |
| Paid fleet demand | Supported VIN list, utilisation, charging, warranty and paid trial | Blocks continuation. |
- Needed
- Matched registration/import/dealer extract by VIN, propulsion, class, city and active status
- Decision Effect
- Blocks TAM, standalone centre and franchise.
- Needed
- VIN/homologation classifications and annual registration table
- Decision Effect
- Blocks forecast calibration and service mix.
- Needed
- Signed contracts, customs entries, registered VINs, in-service fleet and maintenance/charging contracts
- Decision Effect
- Prevents announcement inflation.
- Needed
- Site, connector, standard, kW, access, tariff, uptime and commissioning
- Decision Effect
- Blocks network-service claim.
- Needed
- Written labour/inspectorate/electrical/fire/insurer requirements and adopted editions
- Decision Effect
- Blocks repair launch.
- Needed
- Written classification, storage, carrier and approved recipient
- Decision Effect
- Holds pack work.
- Needed
- Supported VIN list, utilisation, charging, warranty and paid trial
- Decision Effect
- Blocks continuation.
Complete linked source register
Every material quantitative claim is linked or explicitly labelled as an EVS assumption.
Complete linked source register
| Source Id | Publisher | Publication Date | Accessed At | Scope | Href |
|---|---|---|---|---|---|
| vingroup_dec | Vingroup | 2025-12-29 | 2026-08-11 | Company announcement of a trilateral MoU: roadmap contemplated about 500 electric buses and 1,000 electric public-fleet cars, plus prospective distribution of 10,000–20,000 cars and 50,000–100,000 scooters. It says formal contracts were to be pursued by end-Q1 2026; quantities are not deliveries or registrations. | https://www.vingroup.net/en/news/detail/3770/vingroup-and-kinshasa-strengthen-comprehensive-cooperation-in-green-mobility |
| vinfast_taxi | Vingroup / VinFast | 2026-02-10 | 2026-08-11 | Company announcement of an MoU for a potential first taxi batch including Limo Green and Herio Green; no quantity, contract, delivery or registration is confirmed. | https://vingroup.net/en/news/detail/3824/vinfast-and-exposure-sarl-sign-mou-to-promote-green-transportation-in-the-democratic-republic-of-congo |
| vingroup_earlier | Vingroup | 2025-09-08 | 2026-08-11 | Earlier study-stage MoU refers to exploring conversion of more than 300,000 internal-combustion vehicles and supporting buses/charging. It is not an EV-stock fact. | https://vingroup.net/en/news/detail/3671/congo-va-vingroup-ky-mou-phat-trien-do-thi-va-giao-thong-xanh |
| acp_announcement | Agence Congolaise de Presse | 2025-12-25 | 2026-08-11 | Government news report of announced vehicles and an April 2026 first-delivery expectation. No authoritative delivery/registration confirmation was located by the evidence cutoff. | https://acp.cd/urbain/dix-mille-taxis-attendus-a-kinshasa-pour-assurer-la-mobilite-de-la-population/ |
| peto | PETO Mobility | — | 2026-08-11 | Operator site explicitly describes an electric-motorcycle and battery-swap pilot. Planned motorcycles/swaps are not passenger-car stock or public passenger EVSE. | https://petomobility.com/ |
| ovd_parc_proxy | Journal de Kinshasa | 2025-03-19 | 2026-08-11 | Secondary report attributes more than 800,000 vehicles in Kinshasa to OVD. It is a rough all-powertrain planning proxy without class, propulsion or active-status separation. | https://www.journaldekinshasa.com/kinshasa-bientot-le-lancement-de-la-2e-phase-du-controle-technique-des-vehicules/ |
| acp_inspection | Agence Congolaise de Presse | 2026-07-11 | 2026-08-11 | Current enforcement report states Kinshasa technical inspection is compulsory at six-month intervals. | https://acp.cd/urbain/kinshasa-les-usagers-de-la-route-appeles-au-controle-technique-de-leurs-vehicules/ |
| road_code | Leganet / Democratic Republic of the Congo | 1978-08-30 | 2026-08-11 | Primary legal text repository for road and vehicle rules; current implementing requirements need local legal confirmation. | https://www.leganet.cd/Legislation/DroitPenal/Roulage/Codedelaroute.L78.022.30.08.1978.htm |
| used_import_2026 | La Prunelle RDC | 2026-01-28 | 2026-08-11 | Current secondary report on Decree 26/01: generally 15-year maximum age, 20 years for tractors, and pre-export technical proof. Obtain the signed decree and tariff-class advice. | https://laprunellerdc.cd/rdc-le-gouvernement-encadre-strictement-limportation-des-vehicules-doccasion/ |
| used_import_legal | LegaNews Pro | 2026-01-28 | 2026-08-11 | Legal-news summary corroborating the 2026 age and conformity framework; not a substitute for authenticated text. | https://leganews.pro/articles/019ce6e8-85b3-7835-88d4-027d1a19bcfc |
| occ_import | Office Congolais de Contrôle | 2013-03-21 | 2026-08-11 | Official historical import-control route; check current OCC requirements and interaction with Decree 26/01. | https://www.occ.cd/2013/03/21/entree-en-vigueur-de-la-mesure-dinterdiction-de-limportation-des-vehicules-doccasion-en-rdc/ |
| dgda_customs | Direction Générale des Douanes et Accises | — | 2026-08-11 | Official customs-law repository. No EV-specific duty exemption was confirmed. | https://douane.gouv.cd/entreprises/reglementation/legislation-des-douanes-et-accises/ |
| wb_energy | World Bank | 2025-06-03 | 2026-08-11 | Primary evidence: about 21% electricity access, government goal 62% by 2030, and an Inga 3 potential of 2–11 GW with long preparation/construction. Access is not charger coverage. | https://www.worldbank.org/en/news/press-release/2025/06/03/new-inga-3-development-program-to-start-with-investments-in-local-afe-congolese-communities |
| are_report | Autorité de Régulation du Secteur de l’Électricité | 2025-03-30 | 2026-08-11 | Official regulator report route; use for electricity-sector context, not EVSE count. | https://are.gouv.cd/2025/03/30/ |
| are_energy_week | Autorité de Régulation du Secteur de l’Électricité | 2025-06-27 | 2026-08-11 | Regulator states consumption rose from 12,460 GWh in 2020 to 13,625 GWh in 2024 while supply remained insufficient. | https://are.gouv.cd/2025/06/27/ouverture-de-la-semaine-de-lenergie-2025-lare-lance-une-grande-reflexion-autour-de-la-croissance-et-des-defis-dun-secteur-crucial-pour-le-developpement-economique-du-pays-2/ |
| are_customers | Agence Congolaise de Presse / ARE | 2025-06-28 | 2026-08-11 | ARE-attributed customer counts: 1,496,292 low-voltage, 2,403 medium-voltage and 78 high-voltage customers at end-2024. Connections/customers are not electricity-access share or EVSE. | https://acp.cd/economie/electricite-accroissement-de-389-du-nombre-de-clients-desservis-en-2024/ |
| afdb_moyi | African Development Bank | 2025-03-20 | 2026-08-11 | Primary project evidence for a $340m electricity project intended to serve more than one million people; not current workshop supply. | https://www.afdb.org/en/news-and-events/press-releases/drc-african-development-bank-lead-financing-transformative-moyi-power-project-79372 |
| imf_june | International Monetary Fund | 2026-06-26 | 2026-08-11 | Latest primary macro/risk update: resilient 2025 activity, 2.5% inflation at end-April 2026, stable debt outlook and conflict/humanitarian/health/external risks. | https://www.imf.org/en/news/articles/2026/06/26/pr26227-drc-imf-completes-3rd-rev-under-ecf-arrangement-2nd-review-under-rsf-arrangement-for-drc |
| imf_may | International Monetary Fund | 2026-05-06 | 2026-08-11 | Primary mission update: growth above 5.5% in 2025 and 2026; reserves $8.8bn at end-March 2026, below three months of imports. | https://www.imf.org/en/news/articles/2026/05/06/pr-26139-democratic-republic-of-congo-imf-completes-the-2026-article-iv-and-programs-rev-mission |
| worldbank_country | World Bank | — | 2026-08-11 | Current primary country context: 2025 GDP growth estimated at 5.5%, 2026–28 average 5.1%, and severe conflict/humanitarian downside. | https://www.worldbank.org/ext/en/country/drc |
| dgi_cit | Direction Générale des Impôts | — | 2026-08-11 | Official corporate-income-tax route; obtain transaction-specific DGI advice. | https://dgi.gouv.cd/impot-sur-les-societes/ |
| dgi_vat | Direction Générale des Impôts | — | 2026-08-11 | Official VAT route; obtain registration, invoice and import treatment advice. | https://dgi.gouv.cd/taxe-sur-la-valeur-ajoutee-tva/ |
| pwc_cit | PwC | 2026-04-21 | 2026-08-11 | Professional current summary: standard corporate income tax 30% and minimum tax rules. Local advice controls. | https://taxsummaries.pwc.com/democratic-republic-of-the-congo/corporate/taxes-on-corporate-income |
| pwc_vat | PwC | 2026-04-21 | 2026-08-11 | Professional current summary: standard VAT 16% plus import/parafiscal charges; classification and exemptions require advice. | https://taxsummaries.pwc.com/democratic-republic-of-the-congo/corporate/other-taxes |
| pwc_developments | PwC | 2026-04-21 | 2026-08-11 | Professional current summary of standardized-invoice and tax changes. | https://taxsummaries.pwc.com/democratic-republic-of-the-congo/corporate/significant-developments |
| pwc_wht | PwC | 2026-04-21 | 2026-08-11 | Professional current summary: standard 20% withholding context, subject to transaction/treaty analysis. | https://taxsummaries.pwc.com/democratic-republic-of-the-congo/corporate/withholding-taxes |
| anapi | ANAPI | — | 2026-08-11 | Official investment-promotion route. | https://anapi.cd/ |
| anapi_resources | ANAPI | — | 2026-08-11 | Official repository for investor guides and the Investment Code; eligibility is not automatic. | https://anapi.cd/ressources |
| anapi_revision | ANAPI | 2025-11-11 | 2026-08-11 | Official notice that the Investment Code was under revision; obtain current authenticated law and approval terms. | https://anapi.cd/news/revision-du-code-des-investissements-la-rdc-sengage-dans-une-nouvelle-ere-de-reformes-economiques/2025/11/11 |
| anapi_sez | ANAPI | — | 2026-08-11 | Official SEZ information; a Kinshasa service pilot should assume no benefit without a written eligibility decision. | https://anapi.cd/azes |
| wb_incentives | World Bank | 2025-07-28 | 2026-08-11 | Primary policy note estimates tax incentives cost around 5% of GDP and recommends rationalisation. It does not create an EV workshop incentive. | https://www.worldbank.org/en/news/press-release/2025/07/28/in-democratic-republic-of-congo-drc-reassessing-tax-incentives-can-assist-growth-and-equity |
| safety_order | Leganet / Democratic Republic of the Congo | 1971-12-20 | 2026-08-11 | National workplace-safety rules for industrial, commercial and dangerous establishments; current inspectorate interpretation is required. | https://www.leganet.cd/Legislation/DroitSocial/sante/AM.0057.71.20.12.1971.htm |
| ilo_labour | International Labour Organization / EPLex | — | 2026-08-11 | ILO legal repository context; local counsel should confirm current Labour Code, contracts, hours and termination. | https://eplex.ilo.org/en/legal-coverage |
| ilo_social_security | International Labour Organization / NATLEX | 2016-07-15 | 2026-08-11 | ILO repository for Social Security Law No. 16/009; current CNSS practice controls. | https://natlex.ilo.org/dyn/natlex2/r/natlex/fe/details?p3_isn=110943 |
| cnss | CNSS | — | 2026-08-11 | Official employer-affiliation and contribution route. | https://cnss.cd/ |
| classified_installations | Leganet / Democratic Republic of the Congo | 2013-05-29 | 2026-08-11 | National framework for dangerous/polluting commercial and industrial installations, declaration/permit and environmental/social assessment. | https://www.leganet.cd/Legislation/Droit%20administratif/Urbanismevoiries/decret13.15.29.05.2013.htm |
| unep_waste | United Nations Environment Programme | — | 2026-08-11 | UNEP notes DRC participation in Basel/Rotterdam/Stockholm and capacity/legislation development. It does not prove an approved traction-battery recipient. | https://www.unep.org/democratic-republic-congo-0 |
| basel_text | Basel Convention Secretariat | — | 2026-08-11 | Official Convention text; e-waste amendments took effect 1 January 2025. National competent-authority classification and prior consent still control. | https://www.basel.int/TheConvention/Overview/TextoftheConvention/tabid/1275/Default.aspx |
| environment_law | BWC National Implementation Measures Programme | — | 2026-08-11 | Legal overview notes prohibition on dangerous-waste imports. Obtain authenticated national text and regulator advice. | https://bwcimplementation.org/states/democratic-republic-congo |
| digital_code | Agence Congolaise de Presse | 2026-04-23 | 2026-08-11 | Current legal discussion refers to Constitution Article 31 and Digital Code Article 183 onward. Obtain counsel on workshop CRM, diagnostics and transfers. | https://acp.cd/affaire-judiciare-et-droits-humains/la-protection-des-donnees-personnelles-dans-le-code-du-numerique-evoquee-par-une-avocate/ |
| dpo_network | Agence Ecofin | 2026-03-18 | 2026-08-11 | Secondary current implementation context; not a compliance opinion. | https://www.agenceecofin.com/actualites-numerique/1803-136756-la-rdc-deploie-un-reseau-de-responsables-pour-encadrer-la-protection-des-donnees |
| digital_services | Bankable Africa | 2026-03-18 | 2026-08-11 | Secondary report on authorization/declaration requirements from 1 July 2026; confirm whether EVS systems are in scope. | https://bankable.africa/en/digital/1803-2593-dr-congo-defines-licensing-rules-for-digital-platforms-and-services |
| toyota_drc | Toyota DRC / CFAO Mobility | — | 2026-08-11 | Official OEM-backed network across Kinshasa, Lubumbashi, Kolwezi, Matadi, Beni, Bukavu, Goma and Kalemie; no verified passenger-EV capability claim. | https://www.toyota-rdc.com/fr/concession/toyota-rdc-cfao-motors |
| toyota_kinshasa | Toyota DRC / CFAO Mobility | — | 2026-08-11 | Official sales, aftersales and used-vehicle footprint; conventional competitor/partner context only. | https://www.toyota-rdc.com/fr/concession/toyota-rdc-cfao-motors/cfao-motors-kinshasa |
| toyota_lubumbashi | Toyota DRC / CFAO Mobility | — | 2026-08-11 | Official aftersales footprint in Lubumbashi; no verified passenger-EV service capability. | https://www.toyota-rdc.com/fr/concession/toyota-rdc-cfao-motors/cfao-motors-lubumbashi |
| toyota_kolwezi | Toyota DRC / CFAO Mobility | — | 2026-08-11 | Official aftersales footprint in Kolwezi; no verified passenger-EV service capability. | https://www.toyota-rdc.com/fr/concession/toyota-rdc-cfao-motors/cfao-motors-kolwezi |
| gwm_tractafric | Actualite.cd | 2026-02-02 | 2026-08-11 | Secondary current dealer/aftersales context; no verified BEV/PHEV registrations or HV capability. | https://actualite.cd/2026/02/02/tractafric-equipment-lance-la-marque-chinoise-gwm-en-rdc-avec-un-showroom-kinshasa |
| colonne_motors | Colonne Motors | — | 2026-08-11 | Dealer and aftersales context in Kinshasa; no audited EV model sales or active stock. | https://colonnemotors.com/ |
| ccb | Conseil Congolais de la Batterie | — | 2026-08-11 | Official battery-value-chain institution; industrial policy is not current road-EV adoption. | https://ccb.cd/ |
| uneca_msme | United Nations Economic Commission for Africa | 2025-09-16 | 2026-08-11 | Primary programme evidence for battery/EV value-chain capability; not passenger-EV stock. | https://uneca.org/stories/eca-capacitates-micro-small-and-medium-enterprises-in-drc-and-zambia-to-tap-battery-and |
| uneca_framework | United Nations Economic Commission for Africa | 2023-03-27 | 2026-08-11 | Primary industrial-development framework; not vehicle deployment. | https://uneca.org/stories/eca-and-afreximbank-sign-framework-agreement-to-establish-special-economic-zones-for-the |
| uneca_progress | United Nations Economic Commission for Africa | 2024-04-15 | 2026-08-11 | Primary pre-feasibility/project progress; not current workshop demand. | https://www.uneca.org/stories/zambia-and-drc-to-implement-an-innovative-transboundary-battery-and-electric-vehicle-special |
| iso_6469 | International Organization for Standardization | — | 2026-08-11 | International HV safety benchmark; not evidence of DRC adoption. Confirm edition with authorities and insurer. | https://www.iso.org/standard/45477.html |
| iso_17409 | International Organization for Standardization | — | 2026-08-11 | International conductive-charging benchmark; local electrical approvals control. | https://www.iso.org/standard/68474.html |
| iec_61851 | International Electrotechnical Commission | — | 2026-08-11 | International EVSE benchmark; not proof of national adoption. | https://webstore.iec.ch/en/publication/33644 |
| un_r100 | United Nations Economic Commission for Europe | — | 2026-08-11 | International vehicle-type safety reference; confirm applicability to imported VINs. | https://unece.org/transport/documents/2022/03/standards/un-regulation-no-100-rev3 |
| un_tests | United Nations Economic Commission for Europe | — | 2026-08-11 | UN 38.3 lithium-battery transport testing context; national, carrier and recipient permissions still apply. | https://unece.org/transport/dangerous-goods/rev8-files |
| ilo_osh | International Labour Organization | — | 2026-08-11 | International OSH-management benchmark; national law and inspectorate requirements control. | https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001 |
| mixed_sources | EVS Worldwide | 2026-08-11 | 2026-08-11 | Rows retain individual bracketed source identifiers. | EVS://DRC/mixed-source-evidence |
| evs_model | EVS Worldwide | 2026-08-11 | 2026-08-11 | Internal planning assumptions and calculations; not sourced market facts. | EVS://DRC/market-entry-model |
- Publisher
- Vingroup
- Publication Date
- 2025-12-29
- Accessed At
- 2026-08-11
- Scope
- Company announcement of a trilateral MoU: roadmap contemplated about 500 electric buses and 1,000 electric public-fleet cars, plus prospective distribution of 10,000–20,000 cars and 50,000–100,000 scooters. It says formal contracts were to be pursued by end-Q1 2026; quantities are not deliveries or registrations.
- Href
- https://www.vingroup.net/en/news/detail/3770/vingroup-and-kinshasa-strengthen-comprehensive-cooperation-in-green-mobility
- Publisher
- Vingroup / VinFast
- Publication Date
- 2026-02-10
- Accessed At
- 2026-08-11
- Scope
- Company announcement of an MoU for a potential first taxi batch including Limo Green and Herio Green; no quantity, contract, delivery or registration is confirmed.
- Href
- https://vingroup.net/en/news/detail/3824/vinfast-and-exposure-sarl-sign-mou-to-promote-green-transportation-in-the-democratic-republic-of-congo
- Publisher
- Vingroup
- Publication Date
- 2025-09-08
- Accessed At
- 2026-08-11
- Scope
- Earlier study-stage MoU refers to exploring conversion of more than 300,000 internal-combustion vehicles and supporting buses/charging. It is not an EV-stock fact.
- Href
- https://vingroup.net/en/news/detail/3671/congo-va-vingroup-ky-mou-phat-trien-do-thi-va-giao-thong-xanh
- Publisher
- Agence Congolaise de Presse
- Publication Date
- 2025-12-25
- Accessed At
- 2026-08-11
- Scope
- Government news report of announced vehicles and an April 2026 first-delivery expectation. No authoritative delivery/registration confirmation was located by the evidence cutoff.
- Href
- https://acp.cd/urbain/dix-mille-taxis-attendus-a-kinshasa-pour-assurer-la-mobilite-de-la-population/
- Publisher
- PETO Mobility
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Operator site explicitly describes an electric-motorcycle and battery-swap pilot. Planned motorcycles/swaps are not passenger-car stock or public passenger EVSE.
- Href
- https://petomobility.com/
- Publisher
- Journal de Kinshasa
- Publication Date
- 2025-03-19
- Accessed At
- 2026-08-11
- Scope
- Secondary report attributes more than 800,000 vehicles in Kinshasa to OVD. It is a rough all-powertrain planning proxy without class, propulsion or active-status separation.
- Href
- https://www.journaldekinshasa.com/kinshasa-bientot-le-lancement-de-la-2e-phase-du-controle-technique-des-vehicules/
- Publisher
- Agence Congolaise de Presse
- Publication Date
- 2026-07-11
- Accessed At
- 2026-08-11
- Scope
- Current enforcement report states Kinshasa technical inspection is compulsory at six-month intervals.
- Href
- https://acp.cd/urbain/kinshasa-les-usagers-de-la-route-appeles-au-controle-technique-de-leurs-vehicules/
- Publisher
- Leganet / Democratic Republic of the Congo
- Publication Date
- 1978-08-30
- Accessed At
- 2026-08-11
- Scope
- Primary legal text repository for road and vehicle rules; current implementing requirements need local legal confirmation.
- Href
- https://www.leganet.cd/Legislation/DroitPenal/Roulage/Codedelaroute.L78.022.30.08.1978.htm
- Publisher
- La Prunelle RDC
- Publication Date
- 2026-01-28
- Accessed At
- 2026-08-11
- Scope
- Current secondary report on Decree 26/01: generally 15-year maximum age, 20 years for tractors, and pre-export technical proof. Obtain the signed decree and tariff-class advice.
- Href
- https://laprunellerdc.cd/rdc-le-gouvernement-encadre-strictement-limportation-des-vehicules-doccasion/
- Publisher
- LegaNews Pro
- Publication Date
- 2026-01-28
- Accessed At
- 2026-08-11
- Scope
- Legal-news summary corroborating the 2026 age and conformity framework; not a substitute for authenticated text.
- Href
- https://leganews.pro/articles/019ce6e8-85b3-7835-88d4-027d1a19bcfc
- Publisher
- Office Congolais de Contrôle
- Publication Date
- 2013-03-21
- Accessed At
- 2026-08-11
- Scope
- Official historical import-control route; check current OCC requirements and interaction with Decree 26/01.
- Href
- https://www.occ.cd/2013/03/21/entree-en-vigueur-de-la-mesure-dinterdiction-de-limportation-des-vehicules-doccasion-en-rdc/
- Publisher
- Direction Générale des Douanes et Accises
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official customs-law repository. No EV-specific duty exemption was confirmed.
- Href
- https://douane.gouv.cd/entreprises/reglementation/legislation-des-douanes-et-accises/
- Publisher
- World Bank
- Publication Date
- 2025-06-03
- Accessed At
- 2026-08-11
- Scope
- Primary evidence: about 21% electricity access, government goal 62% by 2030, and an Inga 3 potential of 2–11 GW with long preparation/construction. Access is not charger coverage.
- Href
- https://www.worldbank.org/en/news/press-release/2025/06/03/new-inga-3-development-program-to-start-with-investments-in-local-afe-congolese-communities
- Publisher
- Autorité de Régulation du Secteur de l’Électricité
- Publication Date
- 2025-03-30
- Accessed At
- 2026-08-11
- Scope
- Official regulator report route; use for electricity-sector context, not EVSE count.
- Href
- https://are.gouv.cd/2025/03/30/
- Publisher
- Autorité de Régulation du Secteur de l’Électricité
- Publication Date
- 2025-06-27
- Accessed At
- 2026-08-11
- Scope
- Regulator states consumption rose from 12,460 GWh in 2020 to 13,625 GWh in 2024 while supply remained insufficient.
- Href
- https://are.gouv.cd/2025/06/27/ouverture-de-la-semaine-de-lenergie-2025-lare-lance-une-grande-reflexion-autour-de-la-croissance-et-des-defis-dun-secteur-crucial-pour-le-developpement-economique-du-pays-2/
- Publisher
- Agence Congolaise de Presse / ARE
- Publication Date
- 2025-06-28
- Accessed At
- 2026-08-11
- Scope
- ARE-attributed customer counts: 1,496,292 low-voltage, 2,403 medium-voltage and 78 high-voltage customers at end-2024. Connections/customers are not electricity-access share or EVSE.
- Href
- https://acp.cd/economie/electricite-accroissement-de-389-du-nombre-de-clients-desservis-en-2024/
- Publisher
- African Development Bank
- Publication Date
- 2025-03-20
- Accessed At
- 2026-08-11
- Scope
- Primary project evidence for a $340m electricity project intended to serve more than one million people; not current workshop supply.
- Href
- https://www.afdb.org/en/news-and-events/press-releases/drc-african-development-bank-lead-financing-transformative-moyi-power-project-79372
- Publisher
- International Monetary Fund
- Publication Date
- 2026-06-26
- Accessed At
- 2026-08-11
- Scope
- Latest primary macro/risk update: resilient 2025 activity, 2.5% inflation at end-April 2026, stable debt outlook and conflict/humanitarian/health/external risks.
- Href
- https://www.imf.org/en/news/articles/2026/06/26/pr26227-drc-imf-completes-3rd-rev-under-ecf-arrangement-2nd-review-under-rsf-arrangement-for-drc
- Publisher
- International Monetary Fund
- Publication Date
- 2026-05-06
- Accessed At
- 2026-08-11
- Scope
- Primary mission update: growth above 5.5% in 2025 and 2026; reserves $8.8bn at end-March 2026, below three months of imports.
- Href
- https://www.imf.org/en/news/articles/2026/05/06/pr-26139-democratic-republic-of-congo-imf-completes-the-2026-article-iv-and-programs-rev-mission
- Publisher
- World Bank
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Current primary country context: 2025 GDP growth estimated at 5.5%, 2026–28 average 5.1%, and severe conflict/humanitarian downside.
- Href
- https://www.worldbank.org/ext/en/country/drc
- Publisher
- Direction Générale des Impôts
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official corporate-income-tax route; obtain transaction-specific DGI advice.
- Href
- https://dgi.gouv.cd/impot-sur-les-societes/
- Publisher
- Direction Générale des Impôts
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official VAT route; obtain registration, invoice and import treatment advice.
- Href
- https://dgi.gouv.cd/taxe-sur-la-valeur-ajoutee-tva/
- Publisher
- PwC
- Publication Date
- 2026-04-21
- Accessed At
- 2026-08-11
- Scope
- Professional current summary: standard corporate income tax 30% and minimum tax rules. Local advice controls.
- Href
- https://taxsummaries.pwc.com/democratic-republic-of-the-congo/corporate/taxes-on-corporate-income
- Publisher
- PwC
- Publication Date
- 2026-04-21
- Accessed At
- 2026-08-11
- Scope
- Professional current summary: standard VAT 16% plus import/parafiscal charges; classification and exemptions require advice.
- Href
- https://taxsummaries.pwc.com/democratic-republic-of-the-congo/corporate/other-taxes
- Publisher
- PwC
- Publication Date
- 2026-04-21
- Accessed At
- 2026-08-11
- Scope
- Professional current summary of standardized-invoice and tax changes.
- Href
- https://taxsummaries.pwc.com/democratic-republic-of-the-congo/corporate/significant-developments
- Publisher
- PwC
- Publication Date
- 2026-04-21
- Accessed At
- 2026-08-11
- Scope
- Professional current summary: standard 20% withholding context, subject to transaction/treaty analysis.
- Href
- https://taxsummaries.pwc.com/democratic-republic-of-the-congo/corporate/withholding-taxes
- Publisher
- ANAPI
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official investment-promotion route.
- Href
- https://anapi.cd/
- Publisher
- ANAPI
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official repository for investor guides and the Investment Code; eligibility is not automatic.
- Href
- https://anapi.cd/ressources
- Publisher
- ANAPI
- Publication Date
- 2025-11-11
- Accessed At
- 2026-08-11
- Scope
- Official notice that the Investment Code was under revision; obtain current authenticated law and approval terms.
- Href
- https://anapi.cd/news/revision-du-code-des-investissements-la-rdc-sengage-dans-une-nouvelle-ere-de-reformes-economiques/2025/11/11
- Publisher
- ANAPI
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official SEZ information; a Kinshasa service pilot should assume no benefit without a written eligibility decision.
- Href
- https://anapi.cd/azes
- Publisher
- World Bank
- Publication Date
- 2025-07-28
- Accessed At
- 2026-08-11
- Scope
- Primary policy note estimates tax incentives cost around 5% of GDP and recommends rationalisation. It does not create an EV workshop incentive.
- Href
- https://www.worldbank.org/en/news/press-release/2025/07/28/in-democratic-republic-of-congo-drc-reassessing-tax-incentives-can-assist-growth-and-equity
- Publisher
- Leganet / Democratic Republic of the Congo
- Publication Date
- 1971-12-20
- Accessed At
- 2026-08-11
- Scope
- National workplace-safety rules for industrial, commercial and dangerous establishments; current inspectorate interpretation is required.
- Href
- https://www.leganet.cd/Legislation/DroitSocial/sante/AM.0057.71.20.12.1971.htm
- Publisher
- International Labour Organization / EPLex
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- ILO legal repository context; local counsel should confirm current Labour Code, contracts, hours and termination.
- Href
- https://eplex.ilo.org/en/legal-coverage
- Publisher
- International Labour Organization / NATLEX
- Publication Date
- 2016-07-15
- Accessed At
- 2026-08-11
- Scope
- ILO repository for Social Security Law No. 16/009; current CNSS practice controls.
- Href
- https://natlex.ilo.org/dyn/natlex2/r/natlex/fe/details?p3_isn=110943
- Publisher
- CNSS
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official employer-affiliation and contribution route.
- Href
- https://cnss.cd/
- Publisher
- Leganet / Democratic Republic of the Congo
- Publication Date
- 2013-05-29
- Accessed At
- 2026-08-11
- Scope
- National framework for dangerous/polluting commercial and industrial installations, declaration/permit and environmental/social assessment.
- Href
- https://www.leganet.cd/Legislation/Droit%20administratif/Urbanismevoiries/decret13.15.29.05.2013.htm
- Publisher
- United Nations Environment Programme
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- UNEP notes DRC participation in Basel/Rotterdam/Stockholm and capacity/legislation development. It does not prove an approved traction-battery recipient.
- Href
- https://www.unep.org/democratic-republic-congo-0
- Publisher
- Basel Convention Secretariat
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official Convention text; e-waste amendments took effect 1 January 2025. National competent-authority classification and prior consent still control.
- Href
- https://www.basel.int/TheConvention/Overview/TextoftheConvention/tabid/1275/Default.aspx
- Publisher
- BWC National Implementation Measures Programme
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Legal overview notes prohibition on dangerous-waste imports. Obtain authenticated national text and regulator advice.
- Href
- https://bwcimplementation.org/states/democratic-republic-congo
- Publisher
- Agence Congolaise de Presse
- Publication Date
- 2026-04-23
- Accessed At
- 2026-08-11
- Scope
- Current legal discussion refers to Constitution Article 31 and Digital Code Article 183 onward. Obtain counsel on workshop CRM, diagnostics and transfers.
- Href
- https://acp.cd/affaire-judiciare-et-droits-humains/la-protection-des-donnees-personnelles-dans-le-code-du-numerique-evoquee-par-une-avocate/
- Publisher
- Agence Ecofin
- Publication Date
- 2026-03-18
- Accessed At
- 2026-08-11
- Scope
- Secondary current implementation context; not a compliance opinion.
- Href
- https://www.agenceecofin.com/actualites-numerique/1803-136756-la-rdc-deploie-un-reseau-de-responsables-pour-encadrer-la-protection-des-donnees
- Publisher
- Bankable Africa
- Publication Date
- 2026-03-18
- Accessed At
- 2026-08-11
- Scope
- Secondary report on authorization/declaration requirements from 1 July 2026; confirm whether EVS systems are in scope.
- Href
- https://bankable.africa/en/digital/1803-2593-dr-congo-defines-licensing-rules-for-digital-platforms-and-services
- Publisher
- Toyota DRC / CFAO Mobility
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official OEM-backed network across Kinshasa, Lubumbashi, Kolwezi, Matadi, Beni, Bukavu, Goma and Kalemie; no verified passenger-EV capability claim.
- Href
- https://www.toyota-rdc.com/fr/concession/toyota-rdc-cfao-motors
- Publisher
- Toyota DRC / CFAO Mobility
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official sales, aftersales and used-vehicle footprint; conventional competitor/partner context only.
- Href
- https://www.toyota-rdc.com/fr/concession/toyota-rdc-cfao-motors/cfao-motors-kinshasa
- Publisher
- Toyota DRC / CFAO Mobility
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official aftersales footprint in Lubumbashi; no verified passenger-EV service capability.
- Href
- https://www.toyota-rdc.com/fr/concession/toyota-rdc-cfao-motors/cfao-motors-lubumbashi
- Publisher
- Toyota DRC / CFAO Mobility
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official aftersales footprint in Kolwezi; no verified passenger-EV service capability.
- Href
- https://www.toyota-rdc.com/fr/concession/toyota-rdc-cfao-motors/cfao-motors-kolwezi
- Publisher
- Actualite.cd
- Publication Date
- 2026-02-02
- Accessed At
- 2026-08-11
- Scope
- Secondary current dealer/aftersales context; no verified BEV/PHEV registrations or HV capability.
- Href
- https://actualite.cd/2026/02/02/tractafric-equipment-lance-la-marque-chinoise-gwm-en-rdc-avec-un-showroom-kinshasa
- Publisher
- Colonne Motors
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Dealer and aftersales context in Kinshasa; no audited EV model sales or active stock.
- Href
- https://colonnemotors.com/
- Publisher
- Conseil Congolais de la Batterie
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- Official battery-value-chain institution; industrial policy is not current road-EV adoption.
- Href
- https://ccb.cd/
- Publisher
- United Nations Economic Commission for Africa
- Publication Date
- 2025-09-16
- Accessed At
- 2026-08-11
- Scope
- Primary programme evidence for battery/EV value-chain capability; not passenger-EV stock.
- Href
- https://uneca.org/stories/eca-capacitates-micro-small-and-medium-enterprises-in-drc-and-zambia-to-tap-battery-and
- Publisher
- United Nations Economic Commission for Africa
- Publication Date
- 2023-03-27
- Accessed At
- 2026-08-11
- Scope
- Primary industrial-development framework; not vehicle deployment.
- Href
- https://uneca.org/stories/eca-and-afreximbank-sign-framework-agreement-to-establish-special-economic-zones-for-the
- Publisher
- United Nations Economic Commission for Africa
- Publication Date
- 2024-04-15
- Accessed At
- 2026-08-11
- Scope
- Primary pre-feasibility/project progress; not current workshop demand.
- Href
- https://www.uneca.org/stories/zambia-and-drc-to-implement-an-innovative-transboundary-battery-and-electric-vehicle-special
- Publisher
- International Organization for Standardization
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International HV safety benchmark; not evidence of DRC adoption. Confirm edition with authorities and insurer.
- Href
- https://www.iso.org/standard/45477.html
- Publisher
- International Organization for Standardization
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International conductive-charging benchmark; local electrical approvals control.
- Href
- https://www.iso.org/standard/68474.html
- Publisher
- International Electrotechnical Commission
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International EVSE benchmark; not proof of national adoption.
- Href
- https://webstore.iec.ch/en/publication/33644
- Publisher
- United Nations Economic Commission for Europe
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International vehicle-type safety reference; confirm applicability to imported VINs.
- Href
- https://unece.org/transport/documents/2022/03/standards/un-regulation-no-100-rev3
- Publisher
- United Nations Economic Commission for Europe
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- UN 38.3 lithium-battery transport testing context; national, carrier and recipient permissions still apply.
- Href
- https://unece.org/transport/dangerous-goods/rev8-files
- Publisher
- International Labour Organization
- Publication Date
- —
- Accessed At
- 2026-08-11
- Scope
- International OSH-management benchmark; national law and inspectorate requirements control.
- Href
- https://www.ilo.org/resource/other/guidelines-occupational-safety-and-health-management-systems-ilo-osh-2001
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Rows retain individual bracketed source identifiers.
- Href
- EVS://DRC/mixed-source-evidence
- Publisher
- EVS Worldwide
- Publication Date
- 2026-08-11
- Accessed At
- 2026-08-11
- Scope
- Internal planning assumptions and calculations; not sourced market facts.
- Href
- EVS://DRC/market-entry-model
Source: DRC mixed-source evidence tables
Validation register
Evidence, assumptions and operational implications are separated below.
Validation register
| Check | Status | Detail |
|---|---|---|
| JSON / UTF-8 | Pass | Generated and reparsed. |
| Schema | Pass | Required roots, blocks, datasets, calculations and source registry present. |
| Calculations | Pass | MoU sensitivities, gate SAM and annual/90-day economics recomputed. |
| Definition control | Pass | Active plug-ins, all-powertrain proxies, MoUs, buses, motorcycles/swaps, battery industrial projects and passenger EVSE remain separate. |
| Branding | Pass | EVS Green #5BCC12, Silver #A7B3BB, black/charcoal, white/light grey and Inter; no blue. |
| Decision | Pass | Current national TAM null, executable SOM zero and hard gates explicit. |
- Status
- Pass
- Detail
- Generated and reparsed.
- Status
- Pass
- Detail
- Required roots, blocks, datasets, calculations and source registry present.
- Status
- Pass
- Detail
- MoU sensitivities, gate SAM and annual/90-day economics recomputed.
- Status
- Pass
- Detail
- Active plug-ins, all-powertrain proxies, MoUs, buses, motorcycles/swaps, battery industrial projects and passenger EVSE remain separate.
- Status
- Pass
- Detail
- EVS Green #5BCC12, Silver #A7B3BB, black/charcoal, white/light grey and Inter; no blue.
- Status
- Pass
- Detail
- Current national TAM null, executable SOM zero and hard gates explicit.
EVS Board Position
CONDITIONAL GO for evidence-gated diligence and scheduled Greater Kinshasa partner-clinic days; NO-GO standalone/franchise; HOLD traction-pack work.
Source register
60 primary and derived sources
ShowHide
Source register
60 primary and derived sources
Get the full Democratic Republic of the Congo report
The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.