Zambia
EVS Zambia EV Service Centre Market Entry
Decision-grade Zambia assessment separating registered all-class EV observations, customs import flows, passenger BEVs/PHEVs, non-plug-in hybrids, motorcycles, buses, conversion projects, charging plans and policy targets.
RTSA-attributed all-class observation at end-July 2025; not passenger stock.
No authoritative public-connector census located.
Gate-planning jobs/year; not booked demand.
Base simple payback on K300,000 reversible capex.
The verdict in full
- Conditional go only for registry/demand diligence and a scheduled Greater Lusaka partner clinic. No current authoritative passenger-BEV/PHEV stock series was located.
- RTSA-attributed registered EVs increased from 62 in July 2023 to 269 by end-July 2025. The 269 is all-class and has no accessible passenger, body or BEV/PHEV split. [rtsa_growth] [rtsa_crosscheck]
- ZRA-attributed imports totalled 896 from January 2024 through July 2025. Imports are not registrations or active stock and are not added to 269. [zra_imports]
- National passenger TAM and public-connector count remain null. The 324-job / K1,296,000 SAM activates only after a matched extract proves at least 500 Greater Lusaka passenger/light-commercial plug-ins.
- No standalone centre, franchise sale or traction-pack work.
Board Decision
Authorise a matched RTSA/ZRA extract, legal/technical diligence and paid-demand validation. Release no more than K300,000 reversible capex only after every gate passes. Base steady state is 100 jobs, K400,000 revenue, K68,000 EBITDA and 4.41-year simple payback; all operating inputs are EVS assumptions.
Decision Summary
| Dimension | Decision | Reason |
|---|---|---|
| Market entry | CONDITIONAL GO — registry and paid-demand diligence, then a scheduled Greater Lusaka partner clinic | The only observable registration count is all-class and unsegmented. |
| Standalone centre / franchise | NO-GO now | The passenger denominator and charger census are missing; fixed premises cannot be justified. |
| Traction-battery work | HOLD | No opening, removal, damaged-pack custody or shipment without written approvals and competence. |
- Decision
- CONDITIONAL GO — registry and paid-demand diligence, then a scheduled Greater Lusaka partner clinic
- Reason
- The only observable registration count is all-class and unsegmented.
- Decision
- NO-GO now
- Reason
- The passenger denominator and charger census are missing; fixed premises cannot be justified.
- Decision
- HOLD
- Reason
- No opening, removal, damaged-pack custody or shipment without written approvals and competence.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Market size
The best available observation is 269 registered all-class EVs at end-July 2025. It is not a passenger service denominator. A separate 896-import customs flow is a supply signal, not stock. [rtsa_growth] [zra_imports]
Zambia definition-sensitive EV observations
Registrations and customs imports are separate grains.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Market KPIs
| Metric | Value | Unit | Period | Evidence |
|---|---|---|---|---|
| Registered electric vehicles | 269 | all-class EVs | End-July 2025 | RTSA-attributed; no body/propulsion/status split [rtsa_growth]. |
| Registered electric vehicles | 62 | all-class EVs | July 2023 | RTSA-attributed baseline [rtsa_growth] [rtsa_crosscheck]. |
| Observed increase | 207 | vehicles | July 2023 to July 2025 | 269 minus 62; 334% growth on baseline [rtsa_growth]. |
| EV imports | 896 | customs import entries/vehicles | January 2024 to July 2025 | ZRA-attributed flow; not registration or active stock [zra_imports]. |
| Authoritative passenger BEV/PHEV stock | — | vehicles | Current | No accessible separated RTSA series located. |
| Authoritative public charging connectors | — | connectors | Current | No national audited census located. |
- Value
- 269
- Unit
- all-class EVs
- Period
- End-July 2025
- Evidence
- RTSA-attributed; no body/propulsion/status split [rtsa_growth].
- Value
- 62
- Unit
- all-class EVs
- Period
- July 2023
- Evidence
- RTSA-attributed baseline [rtsa_growth] [rtsa_crosscheck].
- Value
- 207
- Unit
- vehicles
- Period
- July 2023 to July 2025
- Evidence
- 269 minus 62; 334% growth on baseline [rtsa_growth].
- Value
- 896
- Unit
- customs import entries/vehicles
- Period
- January 2024 to July 2025
- Evidence
- ZRA-attributed flow; not registration or active stock [zra_imports].
- Value
- —
- Unit
- vehicles
- Period
- Current
- Evidence
- No accessible separated RTSA series located.
- Value
- —
- Unit
- connectors
- Period
- Current
- Evidence
- No national audited census located.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Definition-sensitive Zambia observations
| Period | BEV | PHEV (unavailable) | BEV used in model | Scope |
|---|---|---|---|---|
| Jul-2023 registrations | — | — | 62 | All-class EV observation; no passenger or BEV/PHEV split [rtsa_growth]. |
| Jan-2024–Jul-2025 imports | — | — | 896 | Customs flow; not active stock and not comparable to registration [zra_imports]. |
| Jul-2025 registrations | — | — | 269 | All-class registered EV observation [rtsa_growth]. |
| Current passenger stock | — | — | — | Not available by active status, body, location, age or warranty. |
- BEV
- —
- PHEV (unavailable)
- —
- BEV used in model
- 62
- Scope
- All-class EV observation; no passenger or BEV/PHEV split [rtsa_growth].
- BEV
- —
- PHEV (unavailable)
- —
- BEV used in model
- 896
- Scope
- Customs flow; not active stock and not comparable to registration [zra_imports].
- BEV
- —
- PHEV (unavailable)
- —
- BEV used in model
- 269
- Scope
- All-class registered EV observation [rtsa_growth].
- BEV
- —
- PHEV (unavailable)
- —
- BEV used in model
- —
- Scope
- Not available by active status, body, location, age or warranty.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Definition reconciliation
Registered EVs, customs imports, passenger BEVs/PHEVs, HEVs/MHEVs, motorcycles, buses, conversions and charger plans are not interchangeable.
Definition reconciliation
| Term | Included | Use |
|---|---|---|
| Passenger BEV/PHEV stock | No current authoritative separated series located | National TAM and adoption share remain null. |
| 269 registered EVs | All-class RTSA-attributed observation at end-July 2025 | Observable upper-bound proxy only; not passenger TAM. |
| 896 EV imports | Customs flow from Jan-2024 through Jul-2025 | Supply signal only; not registered or active parc. |
| Toyota HEV/MHEV models | Self-charging/non-plug-in electrified vehicles | Competitor/skills context; excluded from plug-in pool [toyota_hybrid] [toyota_mhev]. |
| Electric motorcycles, buses, trucks and conversions | Separate vehicle classes and projects | Excluded from passenger/light-commercial service pool unless separately contracted. |
| Public charging | No auditable connector census | Plans/announcements are not delivered, accessible or operational counts. |
- Included
- No current authoritative separated series located
- Use
- National TAM and adoption share remain null.
- Included
- All-class RTSA-attributed observation at end-July 2025
- Use
- Observable upper-bound proxy only; not passenger TAM.
- Included
- Customs flow from Jan-2024 through Jul-2025
- Use
- Supply signal only; not registered or active parc.
- Included
- Self-charging/non-plug-in electrified vehicles
- Use
- Competitor/skills context; excluded from plug-in pool [toyota_hybrid] [toyota_mhev].
- Included
- Separate vehicle classes and projects
- Use
- Excluded from passenger/light-commercial service pool unless separately contracted.
- Included
- No auditable connector census
- Use
- Plans/announcements are not delivered, accessible or operational counts.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Forecast scenarios
20%, 40% and 65% five-year cases grow the 269 all-class observation. They are EVS capacity tests, not official passenger forecasts.
All-class registration planning cases
Five-year EVS capacity cases from 269; not passenger forecasts.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Five-year all-class registration planning cases
| Scenario | Annual Growth Pct | Planning stock end-2030 | Interpretation |
|---|---|---|---|
| Cautious | 20 | 669 | Five-year capacity case from the all-class 269 observation; not passenger forecast. |
| Base | 40 | 1,447 | Capacity case requiring repeat registrations, service access and charging. |
| High | 65 | 3,290 | Stress case; not used to approve fixed premises. |
- Annual Growth Pct
- 20
- Planning stock end-2030
- 669
- Interpretation
- Five-year capacity case from the all-class 269 observation; not passenger forecast.
- Annual Growth Pct
- 40
- Planning stock end-2030
- 1,447
- Interpretation
- Capacity case requiring repeat registrations, service access and charging.
- Annual Growth Pct
- 65
- Planning stock end-2030
- 3,290
- Interpretation
- Stress case; not used to approve fixed premises.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Charging infrastructure
No authoritative national connector census was located. The ten-site Subilo statement was a plan, not proof of delivered, operational or public access. [subilo_charging]
Charging evidence and gaps
Plans are not audited connectors, power, uptime or access.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Charging evidence and unknowns
| Metric | Value | Unit | Period | Status |
|---|---|---|---|---|
| Authoritative public connectors | — | connectors | Current | No national audited count located. |
| Subilo Lusaka site plan | 10 | planned sites | May 2023 | Plan only; not treated as delivered or operational [subilo_charging]. |
| EV-specific retail tariff | — | tariff | Current | No EV-specific tariff inferred; ERB/ZESCO written determination required [erb_tariff] [zesco_tariff]. |
| 2026 net-metering reference tariff | 1.35 | ZMW/kWh | 2026 | Prosumer reference, not EV charging tariff [net_metering]. |
| Grid supply risk signal | 7 | hours/day average retail supply | June 2025 | Dated ministerial statement; design for current site-specific supply and backup [grid_supply]. |
- Value
- —
- Unit
- connectors
- Period
- Current
- Status
- No national audited count located.
- Value
- 10
- Unit
- planned sites
- Period
- May 2023
- Status
- Plan only; not treated as delivered or operational [subilo_charging].
- Value
- —
- Unit
- tariff
- Period
- Current
- Status
- No EV-specific tariff inferred; ERB/ZESCO written determination required [erb_tariff] [zesco_tariff].
- Value
- 1.35
- Unit
- ZMW/kWh
- Period
- 2026
- Status
- Prosumer reference, not EV charging tariff [net_metering].
- Value
- 7
- Unit
- hours/day average retail supply
- Period
- June 2025
- Status
- Dated ministerial statement; design for current site-specific supply and backup [grid_supply].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Vehicle parc age and service demand
No authoritative passenger-BEV/PHEV age, warranty or location distribution was located. A matched RTSA/ZRA extract is the first demand-control gate.
Vehicle parc and service demand
| Indicator | Value | Unit | Implication |
|---|---|---|---|
| All-class registered EV observation | 269 | vehicles | Small and unsegmented; obtain RTSA extract [rtsa_growth]. |
| Passenger/light-commercial BEV/PHEV by age | — | vehicles | No authoritative age/warranty distribution located. |
| EV customs flow | 896 | imports | Strong activity signal, but customs entries do not establish active serviceable stock [zra_imports]. |
| Non-plug-in hybrid availability | — | units | HEV/MHEV skills are adjacent but not plug-in TAM [toyota_hybrid] [toyota_mhev]. |
| Grid reliability | — | site availability | Audit current feeder, phase, capacity, outages and backup before clinic [grid_supply]. |
- Value
- 269
- Unit
- vehicles
- Implication
- Small and unsegmented; obtain RTSA extract [rtsa_growth].
- Value
- —
- Unit
- vehicles
- Implication
- No authoritative age/warranty distribution located.
- Value
- 896
- Unit
- imports
- Implication
- Strong activity signal, but customs entries do not establish active serviceable stock [zra_imports].
- Value
- —
- Unit
- units
- Implication
- HEV/MHEV skills are adjacent but not plug-in TAM [toyota_hybrid] [toyota_mhev].
- Value
- —
- Unit
- site availability
- Implication
- Audit current feeder, phase, capacity, outages and backup before clinic [grid_supply].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Transparent TAM / SAM / SOM
National passenger-EV TAM is not quantified. The observable proxy and launch-gate case separate sourced observations from EVS assumptions; executable SOM is zero.
National TAM unavailable / gate SAM
Assumption-led capacity case; executable SOM zero.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Sizing assumptions
| Assumption | Value | Unit | Basis |
|---|---|---|---|
| Observed all-class EV registrations | 269 | vehicles | RTSA-attributed end-July 2025 observation [rtsa_growth]. |
| Light-duty/passenger share proxy | 0.75 | share | EVS haircut; not a Zambia statistic. |
| Active/available factor | 0.9 | share | EVS planning haircut. |
| Greater Lusaka concentration | 0.7 | share | EVS planning assumption pending RTSA geography. |
| Independent reach | 0.6 | share | EVS assumption pending warranty/fleet access. |
| Service events | 1.2 | jobs/active vehicle/year | EVS blended diagnostic/chassis assumption. |
| Average repair order | 4,000 | ZMW/job | Replace with paid Zambia observations. |
| Greater Lusaka launch threshold | 500 | registered passenger/light-commercial BEV/PHEV | EVS density gate, not estimate. |
| Executable SOM before gates | 0 | jobs | Deliberately zero. |
- Value
- 269
- Unit
- vehicles
- Basis
- RTSA-attributed end-July 2025 observation [rtsa_growth].
- Value
- 0.75
- Unit
- share
- Basis
- EVS haircut; not a Zambia statistic.
- Value
- 0.9
- Unit
- share
- Basis
- EVS planning haircut.
- Value
- 0.7
- Unit
- share
- Basis
- EVS planning assumption pending RTSA geography.
- Value
- 0.6
- Unit
- share
- Basis
- EVS assumption pending warranty/fleet access.
- Value
- 1.2
- Unit
- jobs/active vehicle/year
- Basis
- EVS blended diagnostic/chassis assumption.
- Value
- 4,000
- Unit
- ZMW/job
- Basis
- Replace with paid Zambia observations.
- Value
- 500
- Unit
- registered passenger/light-commercial BEV/PHEV
- Basis
- EVS density gate, not estimate.
- Value
- 0
- Unit
- jobs
- Basis
- Deliberately zero.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
TAM / SAM / SOM
| Layer | Vehicles | Jobs Per Year | Revenue ZMW | Status |
|---|---|---|---|---|
| National passenger-EV TAM | — | — | — | Not quantified: active passenger/light-commercial BEV/PHEV denominator unavailable. |
| Observed-registration proxy pool | 76 | 91 | 364,000 | 269 × 75% light-duty × 90% active × 70% Lusaka × 60% reach × 1.20 events; not TAM. |
| Greater Lusaka gate SAM | 270 | 324 | 1,296,000 | 500 separated registrations × 90% active × 60% reach × 1.20 events. |
- Vehicles
- —
- Jobs Per Year
- —
- Revenue ZMW
- —
- Status
- Not quantified: active passenger/light-commercial BEV/PHEV denominator unavailable.
- Vehicles
- 76
- Jobs Per Year
- 91
- Revenue ZMW
- 364,000
- Status
- 269 × 75% light-duty × 90% active × 70% Lusaka × 60% reach × 1.20 events; not TAM.
- Vehicles
- 270
- Jobs Per Year
- 324
- Revenue ZMW
- 1,296,000
- Status
- 500 separated registrations × 90% active × 60% reach × 1.20 events.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Customers and fleets
Prioritise supported private imports and paid corporate/mining/tourism fleet trials. Public vehicles are not accessible revenue without procurement and warranty permission.
Customer segments
| Segment | Need | Priority |
|---|---|---|
| Private early adopters and used imports | Pre-purchase inspection, scan, charging, 12V and chassis evidence | High only for supported VINs. |
| Corporate and mining light fleets | Scheduled inspection and uptime evidence | High through paid fleet trial. |
| Tourism, hospitality and rental fleets | Route/charging readiness and condition reporting | Medium; Lusaka–Livingstone corridor. |
| Government and municipal fleets | Documented procurement and safe diagnostics | Medium only with contract/warranty permission. |
| Motorcycles, buses and heavy EVs | Separate equipment, competence and depot support | Excluded from Phase 1. |
- Need
- Pre-purchase inspection, scan, charging, 12V and chassis evidence
- Priority
- High only for supported VINs.
- Need
- Scheduled inspection and uptime evidence
- Priority
- High through paid fleet trial.
- Need
- Route/charging readiness and condition reporting
- Priority
- Medium; Lusaka–Livingstone corridor.
- Need
- Documented procurement and safe diagnostics
- Priority
- Medium only with contract/warranty permission.
- Need
- Separate equipment, competence and depot support
- Priority
- Excluded from Phase 1.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Fleet segments
| Segment | Entry Product | Evidence Gate |
|---|---|---|
| Mining/corporate light fleets | Paid inspection and uptime trial | Named VINs, duty cycle, charger audit and service contract. |
| Tourism/rental fleets | Condition report and charging-readiness package | Paid 90-day trial and route evidence. |
| Public fleets | Non-warranty overflow only | Procurement, insurer and OEM permission. |
| Dealer overflow | Chassis and evidence-grade triage | Written scope and lawful tool/data access. |
| Motorcycles/buses/heavy EVs | Referral only | Separate vehicle-class business case. |
- Entry Product
- Paid inspection and uptime trial
- Evidence Gate
- Named VINs, duty cycle, charger audit and service contract.
- Entry Product
- Condition report and charging-readiness package
- Evidence Gate
- Paid 90-day trial and route evidence.
- Entry Product
- Non-warranty overflow only
- Evidence Gate
- Procurement, insurer and OEM permission.
- Entry Product
- Chassis and evidence-grade triage
- Evidence Gate
- Written scope and lawful tool/data access.
- Entry Product
- Referral only
- Evidence Gate
- Separate vehicle-class business case.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Brands and models
No authoritative passenger-EV brand/model registration table was located. Named models are availability signals, not market shares.
Priority brands — no audited market shares located
| Technology | Brand | Units | Share of H1 2026 BEVs (%) | Source |
|---|---|---|---|---|
| Passenger BEV availability | BYD | — | — | Official Zambia page lists Atto 3, Dolphin and Seal; no sales share [byd]. |
| Non-plug-in HEV | Toyota | — | — | CFAO lists RAV4 and Corolla Cross HEVs; excluded from plug-in pool [toyota_hybrid]. |
| Non-plug-in MHEV | Toyota | — | — | Hilux and Fortuner 48V MHEVs; excluded from plug-in pool [toyota_mhev]. |
| Local/new ventures | Spartan and mixed imports | — | — | Availability signal only; no authoritative shares [spartan]. |
- Brand
- BYD
- Units
- —
- Share of H1 2026 BEVs (%)
- —
- Source
- Official Zambia page lists Atto 3, Dolphin and Seal; no sales share [byd].
- Brand
- Toyota
- Units
- —
- Share of H1 2026 BEVs (%)
- —
- Source
- CFAO lists RAV4 and Corolla Cross HEVs; excluded from plug-in pool [toyota_hybrid].
- Brand
- Toyota
- Units
- —
- Share of H1 2026 BEVs (%)
- —
- Source
- Hilux and Fortuner 48V MHEVs; excluded from plug-in pool [toyota_mhev].
- Brand
- Spartan and mixed imports
- Units
- —
- Share of H1 2026 BEVs (%)
- —
- Source
- Availability signal only; no authoritative shares [spartan].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Priority models
| Brand | Model | Powertrain | Signal |
|---|---|---|---|
| BYD | Atto 3 | BEV | Official Zambia availability/service signal; warranty-controlled [byd]. |
| BYD | Dolphin | BEV | Official Zambia availability/service signal [byd]. |
| BYD | Seal | BEV | Official Zambia availability/service signal [byd]. |
| Toyota | RAV4 / Corolla Cross | HEV | Non-plug-in; adjacent service competitor, excluded from plug-in TAM [toyota_hybrid]. |
| Toyota | Hilux / Fortuner 48V | MHEV | Non-plug-in; excluded from plug-in TAM [toyota_mhev]. |
| Mixed | Used BEV/PHEV imports | BEV/PHEV by VIN | No authoritative model ranking; classify before booking. |
- Model
- Atto 3
- Powertrain
- BEV
- Signal
- Official Zambia availability/service signal; warranty-controlled [byd].
- Model
- Dolphin
- Powertrain
- BEV
- Signal
- Official Zambia availability/service signal [byd].
- Model
- Seal
- Powertrain
- BEV
- Signal
- Official Zambia availability/service signal [byd].
- Model
- RAV4 / Corolla Cross
- Powertrain
- HEV
- Signal
- Non-plug-in; adjacent service competitor, excluded from plug-in TAM [toyota_hybrid].
- Model
- Hilux / Fortuner 48V
- Powertrain
- MHEV
- Signal
- Non-plug-in; excluded from plug-in TAM [toyota_mhev].
- Model
- Used BEV/PHEV imports
- Powertrain
- BEV/PHEV by VIN
- Signal
- No authoritative model ranking; classify before booking.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Competitive landscape
BYD, CFAO, authorised multi-brand dealers and strong all-makes independents make a partner-led entry more rational than a new fixed workshop.
Competitor map
| Competitor | Type | Footprint | Threat | Response |
|---|---|---|---|---|
| BYD Zambia | OEM-authorised sales/service | Lusaka | High for warranty BEVs | Out-of-warranty, chassis and written overflow scope only [byd]. |
| CFAO Mobility Zambia | OEM-authorised Toyota network | National dealer footprint | High for Toyota HEV/MHEV | Do not count non-plug-in hybrids in EVS plug-in pool [toyota_hybrid]. |
- Type
- OEM-authorised sales/service
- Footprint
- Lusaka
- Threat
- High for warranty BEVs
- Response
- Out-of-warranty, chassis and written overflow scope only [byd].
- Type
- OEM-authorised Toyota network
- Footprint
- National dealer footprint
- Threat
- High for Toyota HEV/MHEV
- Response
- Do not count non-plug-in hybrids in EVS plug-in pool [toyota_hybrid].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Priority geography
Greater Lusaka is the only fixed operating candidate; Copperbelt, Solwezi and Livingstone are later collection/fleet corridors, not second-site cases.
Priority regions
| Rank | Region | Rationale | Mode |
|---|---|---|---|
| 1 | Greater Lusaka | Capital, official BYD presence, early public-charging launch signal and service ecosystem; no verified EV density. | Only candidate for scheduled partner clinic [byd] [subilo_charging]. |
- Region
- Greater Lusaka
- Rationale
- Capital, official BYD presence, early public-charging launch signal and service ecosystem; no verified EV density.
- Mode
- Only candidate for scheduled partner clinic [byd] [subilo_charging].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Consumer incentives
Customs-duty relief supports adoption, but exact current HS treatment, VAT and hybrid excise must be confirmed. No cash purchase grant is modelled.
Consumer incentives
| Instrument | Status | Implication |
|---|---|---|
| Customs duty on EVs/charging systems | Duty-removal measure reported under 2024 budget implementation | Demand support, but confirm current HS classification and effective treatment [budget_2024] [budget_2024_impl] [zra_importation]. |
| Hybrid passenger excise | Reported reduction from 30% to 25% | Applies to hybrids, not automatically BEVs/PHEVs or service economics [budget_2024_impl]. |
- Status
- Duty-removal measure reported under 2024 budget implementation
- Implication
- Demand support, but confirm current HS classification and effective treatment [budget_2024] [budget_2024_impl] [zra_importation].
- Status
- Reported reduction from 30% to 25%
- Implication
- Applies to hybrids, not automatically BEVs/PHEVs or service economics [budget_2024_impl].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Business incentives
| Instrument | Status | Action |
|---|---|---|
| ZDA priority-sector incentives | Eligibility/threshold specific | Foreign threshold stated as US$1m; local and joint-venture thresholds vary. Ordinary clinic assumes zero benefit [zda_incentives]. |
| Five-year machinery customs exemption | Qualified priority-sector/SEZ investors | No eligibility or benefit booked [zda_incentives]. |
- Status
- Eligibility/threshold specific
- Action
- Foreign threshold stated as US$1m; local and joint-venture thresholds vary. Ordinary clinic assumes zero benefit [zda_incentives].
- Status
- Qualified priority-sector/SEZ investors
- Action
- No eligibility or benefit booked [zda_incentives].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Business, tax and investment incentives
Economics are VAT-exclusive and pre-tax. No grant, reduced rate or customs rebate is banked without written approval.
Tax and customs baseline
| Tax | Rate | Treatment |
|---|---|---|
| VAT / import VAT | 16% general rate | Economics exclude VAT; obtain registration and EV/parts/charger ruling [zra_importation]. |
| Corporate income tax | 30% standard rate | Pre-tax model; ZDA states standard CIT at 30% [zda_incentives]. |
- Rate
- 16% general rate
- Treatment
- Economics exclude VAT; obtain registration and EV/parts/charger ruling [zra_importation].
- Rate
- 30% standard rate
- Treatment
- Pre-tax model; ZDA states standard CIT at 30% [zda_incentives].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Labour, licensing and workshop regulation
Entity, tax, premises/fire, factory/OHS, electrical/ERB/ZESCO/ZABS, environmental, waste, data, consumer and insurance evidence are hard gates.
Licensing path
| Gate | Authority | Evidence |
|---|---|---|
| Entity and tax | PACRA / ZRA | Company, resident directors, tax, VAT, PAYE and current returns [pacra_company] [zra_tax]. |
| Premises / municipal / fire | Local authority / fire authority | Written zoning, trading/business levy, occupancy, fire and signage confirmation via BRRA/local council [brra_rsc]. |
- Authority
- PACRA / ZRA
- Evidence
- Company, resident directors, tax, VAT, PAYE and current returns [pacra_company] [zra_tax].
- Authority
- Local authority / fire authority
- Evidence
- Written zoning, trading/business levy, occupancy, fire and signage confirmation via BRRA/local council [brra_rsc].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Labour and safety obligations
| Requirement | Owner | Control |
|---|---|---|
| Workplace health and safety | Employer | Policy, safe systems, information, training, PPE, first aid and emergency measures [ohs_2025]. |
| Factory registration / machinery | Site operator | Confirm workshop classification, registration, lifting-equipment inspection and records [factories_act]. |
- Owner
- Employer
- Control
- Policy, safe systems, information, training, PPE, first aid and emergency measures [ohs_2025].
- Owner
- Site operator
- Control
- Confirm workshop classification, registration, lifting-equipment inspection and records [factories_act].
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
High-voltage safety
HV authority is task-specific, documented and auditable; training alone does not authorise unsupported work.
High-voltage controls
| Control | Required Evidence |
|---|---|
| VIN/powertrain whitelist | Classify BEV, PHEV, HEV, MHEV and conversion before booking. |
| Task-specific authorisation | Named technician, assessment, scope, expiry and supervision. |
| Safe de-energisation | OEM procedure, lock/tag, proved tester and absence-of-voltage record [iso_6469]. |
| Controlled work zone | Barriers, insulated PPE/tools, rescue equipment and no lone HV work. |
| Charging connection | Licensed electrical work and ERB/ZESCO/ZABS determination; IEC 61851/ISO 17409 benchmarks [iec_61851] [iso_17409]. |
| Release evidence | Pre/post scan, restoration, torque/QC, limitations and customer sign-off. |
- Required Evidence
- Classify BEV, PHEV, HEV, MHEV and conversion before booking.
- Required Evidence
- Named technician, assessment, scope, expiry and supervision.
- Required Evidence
- OEM procedure, lock/tag, proved tester and absence-of-voltage record [iso_6469].
- Required Evidence
- Barriers, insulated PPE/tools, rescue equipment and no lone HV work.
- Required Evidence
- Licensed electrical work and ERB/ZESCO/ZABS determination; IEC 61851/ISO 17409 benchmarks [iec_61851] [iso_17409].
- Required Evidence
- Pre/post scan, restoration, torque/QC, limitations and customer sign-off.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Battery and waste
Phase 1 excludes traction-pack opening, removal, damaged-pack custody and shipment.
Battery and waste routes
| Stage | Rule | Route |
|---|---|---|
| Intact in-vehicle traction pack | Non-invasive diagnostics only | No opening, removal or storage. |
| Suspect/damaged pack arrival | Refuse routine indoor custody | Emergency/OEM/insurer response plan. |
- Rule
- Non-invasive diagnostics only
- Route
- No opening, removal or storage.
- Rule
- Refuse routine indoor custody
- Route
- Emergency/OEM/insurer response plan.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Recommended service portfolio
Lead with condition reports, scans, 12V/charging triage and EV-aware chassis work.
Recommended service portfolio
| Phase | Service | Include | Exclude |
|---|---|---|---|
| Launch | VIN-classified diagnostic scan | DTC/live data/12V/charge evidence | Secure coding, unsupported models or warranty decisions. |
| Launch | Pre-purchase EV condition report | Visual, scan, charging, thermal observation and chassis | Guaranteed battery capacity/life. |
| Launch | Charging and low-voltage triage | Cable, inlet, EVSE interface and 12V | Grid/electrical work without licensed provider. |
| Launch | Tyres, brakes, suspension and alignment | EV load/torque evidence | Unsupported ADAS calibration. |
| Fleet | Uptime inspection and report | Paid fleet trial | OEM HV warranty. |
| Hold | Traction-pack/module work | None | Opening, transport or custody. |
- Service
- VIN-classified diagnostic scan
- Include
- DTC/live data/12V/charge evidence
- Exclude
- Secure coding, unsupported models or warranty decisions.
- Service
- Pre-purchase EV condition report
- Include
- Visual, scan, charging, thermal observation and chassis
- Exclude
- Guaranteed battery capacity/life.
- Service
- Charging and low-voltage triage
- Include
- Cable, inlet, EVSE interface and 12V
- Exclude
- Grid/electrical work without licensed provider.
- Service
- Tyres, brakes, suspension and alignment
- Include
- EV load/torque evidence
- Exclude
- Unsupported ADAS calibration.
- Service
- Uptime inspection and report
- Include
- Paid fleet trial
- Exclude
- OEM HV warranty.
- Service
- Traction-pack/module work
- Include
- None
- Exclude
- Opening, transport or custody.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Franchise and operating model
Use scheduled clinic days inside a compliant local partner workshop. Do not sell territory or sign a standalone lease.
Operating model
| Element | Recommendation |
|---|---|
| Format | Scheduled clinic days in one compliant Greater Lusaka partner workshop. |
| Ownership | Zambia company/joint venture with verified registrations and local operating partner. |
| Territory | No franchise sale or exclusivity before 12 months paid evidence. |
| Staffing | One assessed HV lead plus one technician; shared support. |
| Technology | Supported VIN/task matrix and lawful service information. |
| Commercial | Menu-priced evidence products, deposits and paid fleet trials. |
| Expansion | Copperbelt collection/fleet days only after Lusaka continuation gate. |
- Recommendation
- Scheduled clinic days in one compliant Greater Lusaka partner workshop.
- Recommendation
- Zambia company/joint venture with verified registrations and local operating partner.
- Recommendation
- No franchise sale or exclusivity before 12 months paid evidence.
- Recommendation
- One assessed HV lead plus one technician; shared support.
- Recommendation
- Supported VIN/task matrix and lawful service information.
- Recommendation
- Menu-priced evidence products, deposits and paid fleet trials.
- Recommendation
- Copperbelt collection/fleet days only after Lusaka continuation gate.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Pilot economics
All pricing, volume, margin, opex and capex inputs are EVS assumptions. The partner-clinic format protects downside.
Greater Lusaka partner-clinic EBITDA
ZMW; EVS assumptions.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Annual partner-clinic economics — ZMW
| Scenario | Jobs | ARO ZMW | Revenue ZMW | Gross Margin Pct | Gross Profit ZMW | Opex ZMW | EBITDA ZMW | Payback Years |
|---|---|---|---|---|---|---|---|---|
| Cautious | 45 | 3,500 | 157,500 | 55 | 86,625 | 110,000 | -23,375 | — |
- Jobs
- 45
- ARO ZMW
- 3,500
- Revenue ZMW
- 157,500
- Gross Margin Pct
- 55
- Gross Profit ZMW
- 86,625
- Opex ZMW
- 110,000
- EBITDA ZMW
- -23,375
- Payback Years
- —
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
90-day economics — ZMW
| Scenario | Jobs 90d | Revenue ZMW | Gross Profit ZMW | Opex ZMW | EBITDA ZMW |
|---|---|---|---|---|---|
| Cautious | 12 | 42,000 | 23,100 | 27,500 | -4,400 |
- Jobs 90d
- 12
- Revenue ZMW
- 42,000
- Gross Profit ZMW
- 23,100
- Opex ZMW
- 27,500
- EBITDA ZMW
- -4,400
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Risks and mitigations
The dominant risks are a missing passenger denominator, treating customs flow as stock and mistaking plans for accessible paid demand.
Risks and mitigations
| Risk | Likelihood | Impact | Mitigation |
|---|---|---|---|
| Passenger-BEV/PHEV denominator unavailable | High | High | RTSA/ZRA reconciled extract; national TAM remains null. |
| 896 imports mistaken for active stock | High | High | Reconcile VIN/customs/registration/status; do not add to 269. |
| 269 all-class registrations mistaken for passenger parc | High | High | Separate body, propulsion, owner, location, age and active status. |
| Charging plans mistaken for operating connectors | High | Medium | Physical connector/power/uptime/access audit. |
| Grid interruption and insufficient site capacity | Medium | High | Feeder/load study, backup, no uncontrolled public charging [grid_supply]. |
| OEM software, warranty and parts access | High | High | Supported VIN/task matrix and referral network. |
| Battery fire or electric shock | Low | Critical | No pack work; isolation SOP, rescue gear and drills. |
| Waste route failure | Medium | Critical | No traction-battery custody before written ZEMA route. |
| Tax and incentive interpretation | Medium | Medium | Written ZRA/ZDA advice; zero incentive benefits in model. |
| Very small paid demand | High | High | Clinic format, deposits and hard day-90 stop. |
- Likelihood
- High
- Impact
- High
- Mitigation
- RTSA/ZRA reconciled extract; national TAM remains null.
- Likelihood
- High
- Impact
- High
- Mitigation
- Reconcile VIN/customs/registration/status; do not add to 269.
- Likelihood
- High
- Impact
- High
- Mitigation
- Separate body, propulsion, owner, location, age and active status.
- Likelihood
- High
- Impact
- Medium
- Mitigation
- Physical connector/power/uptime/access audit.
- Likelihood
- Medium
- Impact
- High
- Mitigation
- Feeder/load study, backup, no uncontrolled public charging [grid_supply].
- Likelihood
- High
- Impact
- High
- Mitigation
- Supported VIN/task matrix and referral network.
- Likelihood
- Low
- Impact
- Critical
- Mitigation
- No pack work; isolation SOP, rescue gear and drills.
- Likelihood
- Medium
- Impact
- Critical
- Mitigation
- No traction-battery custody before written ZEMA route.
- Likelihood
- Medium
- Impact
- Medium
- Mitigation
- Written ZRA/ZDA advice; zero incentive benefits in model.
- Likelihood
- High
- Impact
- High
- Mitigation
- Clinic format, deposits and hard day-90 stop.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
90-day entry plan
Registry/legal proof precedes deposits, tools and paid work.
90-day entry plan
| Days | Objective | Actions | Owner | Deliverable |
|---|---|---|---|---|
| 0–15 | Registry and legal gate | Obtain RTSA/ZRA matched extract by propulsion/body/age/owner/location/status; map entity, premises, factory, fire, electricity, standards, waste, data and insurance. | EVS board / Zambia counsel | Feasibility and definition file. |
- Objective
- Registry and legal gate
- Actions
- Obtain RTSA/ZRA matched extract by propulsion/body/age/owner/location/status; map entity, premises, factory, fire, electricity, standards, waste, data and insurance.
- Owner
- EVS board / Zambia counsel
- Deliverable
- Feasibility and definition file.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Explicit go / no-go gates
Failure on denominator, paid demand, compliance, capability, safety or economics stops launch.
Go / no-go gates
| Gate | Go | No-Go |
|---|---|---|
| Market denominator | Matched extract supports at least 500 registered active-status passenger/light-commercial BEVs/PHEVs in Greater Lusaka, separately identified | Classes/status/location cannot be separated or count is below threshold. |
- Go
- Matched extract supports at least 500 registered active-status passenger/light-commercial BEVs/PHEVs in Greater Lusaka, separately identified
- No-Go
- Classes/status/location cannot be separated or count is below threshold.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Methodology
Sourced facts, attributed figures, conflicts, missing fields and EVS assumptions remain visibly separated.
Methodology
| Step | Method |
|---|---|
| 1. Evidence hierarchy | Zambia primary sources first; RTSA/ZRA claims retained as attributed reporting where direct tables were unavailable. |
| 2. Definition control | Separate all-class registrations, customs imports, passenger plug-ins, HEV/MHEV, motorcycles, buses, projects and charger plans. |
| 3. Market denominator | Leave national passenger-EV TAM null until matched RTSA/ZRA extract. |
| 4. Observable proxy | 269 × 75% light-duty × 90% active × 70% Lusaka × 60% reach × 1.20 events; assumption-led, not TAM. |
| 5. Gate SAM | 500 separated Greater Lusaka plug-ins × 90% active × 60% reach × 1.20 events. |
| 6. SOM | Zero before hard gates. |
| 7. Forecasts | Five-year capacity cases from 269 all-class registrations; not official passenger forecasts. |
| 8. Economics | VAT-exclusive EVS assumptions; capacity remains within gate SAM. |
| 9. Validation | JSON, schema, formulas, citations, links, branding, definition control and template residue. |
- Method
- Zambia primary sources first; RTSA/ZRA claims retained as attributed reporting where direct tables were unavailable.
- Method
- Separate all-class registrations, customs imports, passenger plug-ins, HEV/MHEV, motorcycles, buses, projects and charger plans.
- Method
- Leave national passenger-EV TAM null until matched RTSA/ZRA extract.
- Method
- 269 × 75% light-duty × 90% active × 70% Lusaka × 60% reach × 1.20 events; assumption-led, not TAM.
- Method
- 500 separated Greater Lusaka plug-ins × 90% active × 60% reach × 1.20 events.
- Method
- Zero before hard gates.
- Method
- Five-year capacity cases from 269 all-class registrations; not official passenger forecasts.
- Method
- VAT-exclusive EVS assumptions; capacity remains within gate SAM.
- Method
- JSON, schema, formulas, citations, links, branding, definition control and template residue.
Source: EVS Zambia observable-registration proxy, launch-gate and pilot model
Complete linked source register
52 linked sources record publisher, publication/access dates, scope and caveats.
EVS Board Position
CONDITIONAL GO for diligence and a scheduled Greater Lusaka partner clinic; NO-GO standalone/franchise; HOLD traction-pack work.
Source register
52 primary and derived sources
ShowHide
Source register
52 primary and derived sources
Get the full Zambia report
The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.