Market IntelligenceCentral America

El Salvador

EVS El Salvador EV Service Centre Market Entry

Decision-grade El Salvador market-entry report separating OLADE light BEV/PHEV stock, domestic electric-car and motorcycle counts, and ordinary hybrids.

Snapshot: 10 August 202627-page full report
Talk to the expansion team
Light plug-in pool
1,916

EVS active-factor pool from OLADE light BEV+PHEV stock.

Public stations
20

AES public/commercial station subset; uptime unaudited.

Jobs/year
776

Assumption-led metro independent-reach annual jobs.

Years
3.735

Base simple payback on USD32,000 launch capex.

Executive summary

The verdict in full

  • CONDITIONAL GO for diligence and a reversible one-bay managed-partner pilot in the San Salvador–La Libertad corridor—after gates, not before.
  • OLADE reports 1,996 light BEV+PHEV vehicles at March 2026; its definition excludes ordinary hybrids and motorcycles [olade_monitor2026] [olade_definition].
  • The July domestic snapshot separately reports 490 electric cars, 375 electric motorcycles and 3,484 broad hybrids; the source article contains an internal summary/body discrepancy, so figures are not blended [onsv_jul2026].
  • Start with evidence, chassis, HVAC, 12V, charging diagnosis, insurer isolation and fleet uptime. No traction-pack opening.
Decision rule

Approve only a capped 90-day proof: one partner bay, USD32,000 maximum tooling/launch envelope, no long lease, and stop-work authority. Base case is 480 annual jobs, USD86,400 revenue and USD8,568 EBITDA. Franchise rights remain withheld.

Board decision

Approve only a capped 90-day proof: one partner bay, USD32,000 maximum tooling/launch envelope, no long lease, and stop-work authority. Base case is 480 annual jobs, USD86,400 revenue and USD8,568 EBITDA. Franchise rights remain withheld.

Decision Summary

Verdict
Decision
CONDITIONAL GO
Reason
Approve diligence and a reversible one-bay San Salvador–La Libertad managed-partner pilot; hold greenfield site and franchise.
Core evidence
Decision
1,996 light BEV+PHEV
Reason
OLADE March 2026 scope excludes ordinary HEVs and motorcycles [olade_monitor2026] [olade_definition].
Current executable SOM
Decision
Zero
Reason
VIN, PHEV, geography, demand, permits, HV/fire and battery-chain gates are open.
Battery scope
Decision
No pack opening
Reason
Read-only SOH/isolation only until OEM method, insurer and authorised downstream custody are written.

Source: EVS El Salvador decision-support model

Market size

Use OLADE’s 1,996 light BEV+PHEV vehicles at March 2026 as the planning anchor [olade_monitor2026] [olade_definition]. Do not substitute domestic electric-car, electric-motorcycle, broad-hybrid or total-parc counts [onsv_jul2026] [assembly_parc].

Reported plug-in/electric snapshots

Different scopes remain visible; do not infer a single continuous series.

1,590
572
363
1,996
490
end-2024
May 2025
Feb 2026
Mar 2026
Jul 2026

Source: EVS El Salvador decision-support model

Market KPIs

Light BEV+PHEV stock
Value
1,996
Unit
vehicles
Period
March 2026
Evidence
OLADE definition; core denominator [olade_monitor2026] [olade_definition]
Electric cars
Value
490
Unit
cars
Period
July 2026
Evidence
Detailed ONSV-linked body; narrower domestic category [onsv_jul2026]
Electric motorcycles
Value
375
Unit
motorcycles
Period
July 2026
Evidence
Separate from core stock [onsv_jul2026]
Broad hybrid vehicles
Value
3,484
Unit
vehicles
Period
July 2026
Evidence
HEV/PHEV split unavailable; excluded [onsv_jul2026]
Total valid plates
Value
2,022,026
Unit
vehicles
Period
December 2025
Evidence
Official Assembly/VMT context [assembly_parc]
AES public/commercial stations
Value
20
Unit
stations
Period
December 2024
Evidence
Operator subset, not national total [aes_2024]

Source: EVS El Salvador decision-support model

Electric sales history and partial 2026 acceleration

end-2024
BEV
PHEV (unavailable)
BEV used in model
1,590
Scope
OLADE light BEV+PHEV [olade_2024]
May 2025
BEV
PHEV (unavailable)
BEV used in model
572
Scope
Domestic all-electric vehicles; broader/other scope, not comparable [onsv_may2025]
Feb 2026
BEV
363
PHEV (unavailable)
BEV used in model
363
Scope
Domestic electric cars only [onsv_feb2026]
Mar 2026
BEV
PHEV (unavailable)
BEV used in model
1,996
Scope
OLADE light BEV+PHEV; core [olade_monitor2026]
Jul 2026
BEV
490
PHEV (unavailable)
BEV used in model
490
Scope
Domestic electric cars only [onsv_jul2026]

Source: EVS El Salvador decision-support model

Definition reconciliation

OLADE light plug-ins, domestic electric cars, electric motorcycles, broad hybrids, total valid plates, stations, chargers and connectors are different populations. This report keeps them separate and explicitly flags the July article’s internal discrepancy.

Definition reconciliation

OLADE light electrified stock
Included
Core
Use
BEV+PHEV, excludes ordinary HEV and motorcycles; 1,996 at March 2026.
Domestic electric cars
Included
Cross-check
Use
490 at July 2026; narrower than OLADE.
Electric motorcycles
Included
Separate
Use
375; different service model and tooling.
Broad hybrids
Included
Excluded
Use
3,484; HEV/PHEV split unavailable.
Total valid plates
Included
Context
Use
2.022m; never an EV denominator.
Station/charger/connector
Included
Infrastructure context
Use
Not interchangeable; operator subset only.

Source: EVS El Salvador decision-support model

Forecast scenarios

Cautious/base/high cases apply 18%/30%/45% compound growth to the EVS active light plug-in pool through 2031. They are capacity sensitivities, not government or industry forecasts.

Light BEV+PHEV planning scenarios to 2031

18%, 30% and 45% annual growth from EVS active pool; not official forecasts.

Cautious4,383
Base7,114
HighBase case12,281

Source: EVS El Salvador decision-support model

Five-year EV planning scenarios

Cautious
Annual Growth Pct
18
Stock 2031
4,383
Interpretation
Small base, affordability and warranty capture constrain growth.
Base
Annual Growth Pct
30
Stock 2031
7,114
Interpretation
Incentives and broader model supply sustain growth; EVS capacity case.
High
Annual Growth Pct
45
Stock 2031
12,281
Interpretation
Rapid regional supply and used imports; stress-capacity case.

Source: EVS El Salvador decision-support model

Get the full El Salvador analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

Charging infrastructure

AES reported 55 stations in December 2024: 35 internal and 20 public/commercial [aes_2024]. Porsche/Blink names five public locations [blink_porsche]. These are operator subsets; no national audited connector or uptime file was located.

Charging-infrastructure evidence

Historic and current operator subsets; no national audited inventory.

12
55
20
5
AES stations
AES network
AES public/commercial
Porsche/Blink public locations

Source: EVS El Salvador decision-support model

Charging evidence and unknowns

AES stations
Value
12
Unit
stations
Period
historic partnership snapshot
Status
Four public [aes_2022].
AES network
Value
55
Unit
stations
Period
December 2024
Status
35 internal and 20 public/commercial [aes_2024].
AES public/commercial
Value
20
Unit
stations
Period
December 2024
Status
Operator subset; national uptime/connector inventory unavailable.
Porsche/Blink public locations
Value
5
Unit
locations
Period
January 2024
Status
Named corridor subset; do not add to AES count without deduplication [blink_porsche].

Source: EVS El Salvador decision-support model

Parc age and service demand

No defensible average plug-in parc age or first-registration distribution was located. The seven-year maximum age for eligible EV/hybrid imports is a legal ceiling, not an average [dga_age]. Collect VIN-level age before parts or staffing commitments.

Vehicle parc and service demand

Light BEV+PHEV stock
Value
1,996
Unit
vehicles at March 2026
Implication
Best comparable service-pool anchor; secure active VIN and PHEV split.
EVS active factor
Value
96%
Unit
assumption
Implication
Creates a 1,916-vehicle planning pool.
Electric-car growth
Value
226 to 490
Unit
cars, Jun 2025–Jul 2026
Implication
Fast growth from tiny base; domestic dates differ [onsv_jul2026].
Average plug-in parc age
Value
Unavailable
Unit
years
Implication
Do not invent; collect first-registration/import year.
Used EV/hybrid import age limit
Value
7
Unit
years
Implication
Young used-import envelope but no average-age inference [dga_age].

Source: EVS El Salvador decision-support model

Transparent TAM / SAM / SOM

EVS applies a 96% active factor to OLADE’s 1,996, then 1.20 paid events and USD160 ARO. SAM adds assumed 75% metro concentration and 45% independent reach. Current executable SOM remains zero.

Annual service-pool funnel

Current executable SOM is zero; pilot is a post-gate capacity target.

2,299
776
0
480
TAM
SAM
Current executable SOM
Post-gate pilot target

Source: EVS El Salvador decision-support model

Sizing assumptions

Light BEV+PHEV stock
Value
1,996
Unit
vehicles
Basis
OLADE March 2026.
Active/in-country factor
Value
96
Unit
%
Basis
EVS haircut pending active VIN file.
Paid service events
Value
1.2
Unit
events/vehicle/year
Basis
EVS blended assumption.
Average repair order
Value
160
Unit
USD pre-VAT
Basis
EVS assumption; validate with paid jobs.
San Salvador–La Libertad concentration
Value
75
Unit
%
Basis
EVS hypothesis pending department data.
Independent reach
Value
45
Unit
%
Basis
EVS assumption after warranty/platform constraints.

Source: EVS El Salvador decision-support model

TAM / SAM / SOM

TAM
Vehicles
1,916
Jobs Per Year
2,299
Revenue USD
367,872
Status
Active light plug-in pool × 1.20 × USD160.
SAM
Vehicles
647
Jobs Per Year
776
Revenue USD
124,157
Status
TAM × 75% metro × 45% independent reach.
Current executable SOM
Vehicles
0
Jobs Per Year
0
Revenue USD
0
Status
Zero until all launch gates pass.
1 more row in the full report

Source: EVS El Salvador decision-support model

Customer and fleet segments

Priority is contracted importer/dealer overflow, corporate/utility and last-mile fleets, insurers/bodyshops, used-EV evidence and rental/tourism—not speculative walk-in retail.

Customer segments

Importer/dealer overflow
Need
PDI, campaigns, diagnostics and recovery under written boundaries.
Priority
1
Corporate/utility fleets
Need
Uptime SLA, mobile triage, tyres, brakes and charging faults.
Priority
1
Insurers/bodyshops
Need
Isolation, scan, SOH evidence and custody protocol.
Priority
1
Used-EV buyers/finance
Need
Pre-purchase, charging and battery evidence.
Priority
1
Retail owners
Need
Transparent multi-brand post-warranty service.
Priority
2

Source: EVS El Salvador decision-support model

Fleet segments

Corporate/utility
Entry Product
Mobile triage + uptime plan
Evidence Gate
Two anchors and at least 30 monthly jobs.
Last-mile/light commercial
Entry Product
Scheduled inspection + charger triage
Evidence Gate
VIN/platform list and parts SLA.
Insurer/bodyshop
Entry Product
Isolation + evidence pack
Evidence Gate
Written liability/custody acceptance.
Rental/tourism
Entry Product
Rapid-turn inspection
Evidence Gate
Contract volume before airport/coastal route.

Source: EVS El Salvador decision-support model

Get the full El Salvador analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

Brands and models

The July domestic snapshot identifies 184 BYD, 26 BMW and 18 Tesla electric cars [onsv_jul2026]. BYD’s official local range spans BEV and PHEV models [byd_models]. Complete model/VIN distribution is unavailable; tool against paid VIN evidence.

Leading H1 2026 light BEV+PHEV brands

BEV/PHEV
Brand
BYD
Units
184
Share of H1 2026 BEVs (%)
Source
ONSV-linked July 2026 electric-car count [onsv_jul2026].
BEV/PHEV
Brand
BMW
Units
26
Share of H1 2026 BEVs (%)
Source
ONSV-linked July 2026 electric-car count [onsv_jul2026].
BEV
Brand
Tesla
Units
18
Share of H1 2026 BEVs (%)
Source
ONSV-linked July 2026 electric-car count [onsv_jul2026].
Other
Brand
Long tail
Units
Share of H1 2026 BEVs (%)
Source
No complete authoritative model table located; verify VIN/platform mix.

Source: EVS El Salvador decision-support model

Priority models

BYD
Model
Dolphin Mini / Yuan Pro EV / Seal
Powertrain
BEV
Signal
Official local range; verify paid VIN concentration [byd_models].
BYD
Model
Song Plus / Song Pro / Shark DMO
Powertrain
PHEV
Signal
Official local range; ONSV hybrid count cannot isolate PHEVs [byd_models].
BMW
Model
i-series long tail
Powertrain
BEV
Signal
26 electric cars by brand; exact model mix unavailable [onsv_jul2026].
Tesla
Model
Imported long tail
Powertrain
BEV
Signal
18 electric cars by brand; software/parts pathway requires validation [onsv_jul2026].
Other brands
Model
Platform-led long tail
Powertrain
BEV/PHEV
Signal
Tool only after VIN and service-data evidence.

Source: EVS El Salvador decision-support model

Competitive landscape

BYD’s official workshop retains warranty, software and parts leverage [byd_workshop]. Large bodyshops and diagnostic independents are capable adjacent competitors, but their EV-HV competence must be verified [megasystem] [mechanictown] [eficaz].

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Competitor map

BYD El Salvador
Type
OEM/dealer
Footprint
Official workshop, parts, software and warranty
Threat
High
Response
Target overflow, fleets, insurers and post-warranty evidence [byd_workshop].
Megasystem Automotriz
Type
Large body/mechanical workshop
Footprint
Insurer-oriented; 100+ work positions claimed
Threat
Medium
Response
Potential bodyshop partner; audit EV isolation capability [megasystem].
3 more rows in the full report

Source: EVS El Salvador decision-support model

Priority regions

San Salvador–Antiguo Cuscatlán–Santa Tecla is the pilot hypothesis. La Libertad/coastal, Santa Ana, San Miguel and airport/tourism routes remain contract-first mobile spokes. No department-level EV table was found.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Priority regions

1
Region
San Salvador–Antiguo Cuscatlán–Santa Tecla
Rationale
Importer, fleet, insurer, workshop and charger concentration hypothesis.
Mode
Pilot hub
4 more rows in the full report

Source: EVS El Salvador decision-support model

Consumer and business incentives

The 2022 reform reports 0% import tariff and 100% VAT exemption for eligible new vehicles, a 25% VAT discount for eligible used vehicles, and charging-equipment relief [assembly_incentives]. Current DGII/Customs application and transaction eligibility must be confirmed [hacienda_incentives] [dga_import2026].

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Consumer incentives

Eligible new EV/hybrid imports
Status
0% import tariff and 100% VAT exemption under 2022 reform
Implication
Confirm vehicle and transaction eligibility with DGII/Customs [assembly_incentives].
Eligible used EV/hybrid imports
Status
25% VAT discount reported in reform
Implication
Check age, condition and current application before purchase [assembly_incentives] [dga_age].
2 more rows in the full report

Source: EVS El Salvador decision-support model

Business incentives

Charging-station relief
Status
Potential tariff/VAT benefit for eligible equipment
Action
Exclude until DGII/Customs written eligibility and HS code [hacienda_incentives].
Vehicle relief
Status
Demand-side benefit
Action
Do not book as workshop revenue or margin.
2 more rows in the full report

Source: EVS El Salvador decision-support model

Tax and investment

The model is pre-VAT and pre-income tax. Obtain DGII/Customs advice for services, parts, tools, charging activity and entity structure. No incentive or special workshop subsidy is assumed.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Tax and customs baseline

VAT on workshop services/parts
Rate
Current general treatment requires DGII advice
Treatment
Economics are pre-VAT; no workshop exemption assumed.
Corporate income tax
Rate
Entity/regime-dependent
Treatment
After-tax return excluded until entity opinion.
2 more rows in the full report

Source: EVS El Salvador decision-support model

Licensing, labour and workshop regulation

The launch file must cover entity/tax/employer registration, municipal land use and occupancy, MARN category/permit/waste routes, fire/electrical, insurance, labour and custody. CreaEmpresa does not replace sector approvals [cnr_creaempresa] [marn_permits].

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Licensing path

Entity, commerce, NIT/VAT, ISSS and labour registration
Evidence
CreaEmpresa/CNR/DGII completion [cnr_creaempresa] [hacienda_sas].
Gate
G1
Municipal land use, occupancy and workshop activity
Evidence
Written approvals for selected municipality and mobile work.
Gate
G2
3 more rows in the full report

Source: EVS El Salvador decision-support model

Labour and safety obligations

Employment/social-security/payroll compliance
Owner
Country manager
Control
CreaEmpresa and local HR/legal sign-off.
Risk-prevention programme
Owner
HSE lead
Control
Written programme for HV, lifts, tyres, refrigerants, chemicals and road tests [mtps_sso] [mtps_programme].
3 more rows in the full report

Source: EVS El Salvador decision-support model

High-voltage safety

No specific nationwide statutory EV-HV technician licence was located in the reviewed sources. That is not permission: EVS requires role competence, observed assessment, two-person LOTO, prove-dead, quarantine, rescue and drills under the broader workplace-risk framework [mtps_sso] [mtps_programme].

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

High-voltage controls

Orange-cable, exclusion, thermal-warning and emergency training
Standard
HV awareness
Proof
Training and drill record.
Two-person LOTO, OEM shutdown, prove-dead and key control
Standard
Authorised isolation
Proof
Platform-specific observed assessment.
Prohibited at launch except approved method and permit
Standard
Energised work
Proof
Technical-director sign-off.
Segregated area, monitoring and fire/insurer plan
Standard
Damaged-EV quarantine
Proof
Authority and insurer acceptance.
Insulated rescue, first aid and fire-service interface
Standard
Rescue response
Proof
Quarterly drill.

Source: EVS El Salvador decision-support model

Battery and waste

MARN requires generators to classify/separate waste and use authorised managers [marn_generators]. Batteries are excluded from the general RAEE collection route [marn_raee]. Obtain written classification, storage, transport and receiver approval before traction-battery custody.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Battery and waste routes

Traction battery intact
Route
OEM/importer/authorised receiver with chain-of-custody proof.
Status
No pack opening at launch
Damaged or thermal-risk pack
Route
Written MARN, fire, insurer, carrier and receiver route before acceptance.
Status
Quarantine and escalation
4 more rows in the full report

Source: EVS El Salvador decision-support model

Franchise and operating model

Use a company-controlled managed partner with one segregated bay, EVS SOPs, audit rights and digital evidence. No franchise award until six months of profitable and safe operation.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Operating model

Entry vehicle
Recommendation
Company-controlled managed-partner pilot
Why
Tests a tiny market without greenfield lease risk.
Site
Recommendation
One segregated bay plus quarantine
Why
Proportionate to pool and safety risk.
Brand
Recommendation
EVS SOPs, audit and digital evidence
Why
Creates trust against OEM and capable independents.
Franchise
Recommendation
No award until six-month evidence
Why
Protects brand from denominator/compliance uncertainty.
Expansion
Recommendation
Mobile/collection routes before second site
Why
Reach Santa Ana/San Miguel with low fixed cost.

Source: EVS El Salvador decision-support model

Pilot economics

Base annual case: 480 jobs × USD180, 62% gross margin, USD45,000 operating cost and USD8,568 EBITDA. Simple payback on USD32,000 capex is 3.74 years. The cautious case loses money; current executable SOM is zero.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Annual pilot EBITDA scenarios (USD)

Nominal USD, pre-VAT, unlevered EVS assumptions.

Cautious-18,200
Base8,568
HighBase case38,160

Source: EVS El Salvador decision-support model

Annual pilot economics (USD)

Cautious
Jobs
240
Arwo USD
150
Revenue USD
36,000
Gross Margin Pct
55
Gross Profit USD
19,800
Opex USD
38,000
Ebitda USD
-18,200
Payback Years
2 more rows in the full report

Source: EVS El Salvador decision-support model

90-day pilot economics (USD)

Cautious
Jobs 90d
60
Revenue USD
9,000
Gross Profit USD
4,950
Opex USD
9,500
Ebitda USD
-4,550
2 more rows in the full report

Source: EVS El Salvador decision-support model

Risks and mitigations

Dominant risks are definition error, tiny scale/warranty capture, HV/fire, parts/software access, absent battery routes, incentive misunderstanding and overstated metro concentration. Each has a stop gate.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Risks and mitigations

Definition/stock error
Likelihood
High
Impact
High
Mitigation
Acquire active VIN, PHEV, department and platform file; keep motorcycles/HEVs separate.
Tiny pool and warranty capture
Likelihood
High
Impact
High
Mitigation
Capped partner pilot and anchor contracts before spend.
HV/fire incident
Likelihood
Low
Impact
Severe
Mitigation
LOTO, quarantine, no pack opening and drills.
Parts/software access
Likelihood
Medium
Impact
High
Mitigation
Platform matrix and supplier SLA before acceptance.
Battery downstream route absent
Likelihood
Medium
Impact
Severe
Mitigation
Written MARN classification and receiver chain before custody.
Incentive misunderstanding
Likelihood
Medium
Impact
Medium
Mitigation
Pre-tax model without benefit; DGII/Customs opinion.
Metro concentration overstated
Likelihood
Medium
Impact
Medium
Mitigation
Department registrations and contracts before site commitment.

Source: EVS El Salvador decision-support model

90-day entry plan

Front-load evidence, demand and compliance. Paid work starts only after supervised dry runs, an emergency drill and partner acceptance.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

90-day entry plan

0–15
Workstream
Evidence
Deliverable
Active VIN/fuel/department/platform/first-registration extract; BEV/PHEV/HEV/motorcycle separation.
6 more rows in the full report

Source: EVS El Salvador decision-support model

Explicit go / no-go gates

Every gate is open. Missing evidence means hold, not assumption. Failure of the 90-day economics threshold closes or redesigns the pilot.

Full analysis available in the complete report
Detailed findings, comparison matrices and recommendations.

Go / no-go gates

G1 Evidence
Threshold
Active light BEV+PHEV stock at least 1,700; PHEV separate; at least 70% platform/geography mapping
Status
Open
Decision
No capex until passed.
5 more rows in the full report

Source: EVS El Salvador decision-support model

Methodology and limitations

Research accessed 10 August 2026. Primary/authoritative material was preferred; dated secondary evidence is labelled. Facts and EVS assumptions are separated, incompatible populations remain visible and no unavailable statistic is invented.

Methodology

1 Scope
Method
OLADE light BEV+PHEV is core; domestic cars, motorcycles and broad hybrids remain separate.
2 Evidence
Method
Primary/authoritative first; dated secondary evidence labelled where primary series were unavailable.
3 Reconcile
Method
Never add or average OLADE, ONSV car, motorcycle, hybrid, parc or charger populations.
4 Size
Method
OLADE stock × explicit active/event/ARO/concentration/reach assumptions.
5 Forecast
Method
Three EVS compound scenarios through 2031; no official-forecast claim.
6 Economics
Method
Pre-tax, pre-VAT, ungeared pilot contribution; USD32,000 capex; no incentive booked.
7 Decision
Method
Current executable SOM is zero until every gate is evidenced.

Source: EVS El Salvador decision-support model

Linked source register

The registry records publisher, publication date where available, access date, URL and use. Legal, tax, workshop, HV and battery obligations require authority and counsel confirmation before execution.

Get the full El Salvador analysis
Competitive matrix, location shortlist, incentives, pilot-centre economics and the 90-day entry plan — sent to your inbox.

Final recommendation

CONDITIONAL GO to diligence and a capped one-bay San Salvador–La Libertad pilot; NO-GO to greenfield capex, opened-pack work or franchising today.

Source register

36 primary and derived sources

Show

Get the full El Salvador report

The complete assessment — competitive matrix, location shortlist, incentive and regulatory detail, pilot-centre economics and the 90-day entry plan. Sent straight to your inbox.

We use your details only to send the report and follow up about EVS franchise opportunities.